stardust205 0 Report post Posted July 14, 2011 woo... ur ceiling got the WOW factor Share this post Link to post Share on other sites
west 1 Report post Posted July 14, 2011 woo... ur ceiling got the WOW factor thanksglad you liked it Share this post Link to post Share on other sites
west 1 Report post Posted July 14, 2011 (edited) 1 more day left to work for tomorrow before handoveri dunno if they are going to pull it through tomorrow, the workers were still working when I lefti would estimate about 65% done?? most of the carpentry are here, waiting to be fixed upthe glassware and mirrors will come in tomorrowreally keeping fingers X!!here are some picts for today:laminate flooring for MBR almost complete, worker was working on the skirtingswork in progress for vanity top in MBR toiletcommon toilet (halfway)Kid's room platform/laminate Edited July 14, 2011 by west Share this post Link to post Share on other sites
Bluesummerayz 2 Report post Posted July 14, 2011 Nice unique ceiling! I like everything I see!!! Hope they can make it! Jia You! Share this post Link to post Share on other sites
adidaem 6 Report post Posted July 14, 2011 Looking forward to seeing the end-result. Jia you! Share this post Link to post Share on other sites
Kobelala 8 Report post Posted July 15, 2011 went down did a spot check during lunchsome of the carpentry are in the workers are also starting to clear up the placewas told that all the trash will be out by today.. hmmmmmmm....anyway , i was simply captivated by the view just now, because the sea was so deep blue and beautiful, have never seen anything like that earlier.. WOW, Superb view ! Share this post Link to post Share on other sites
west 1 Report post Posted July 15, 2011 (edited) unfortunately, the house wasn't in the handover stage as at the end of the daybut we have seen the most progress within a single dayactually according to the schedule which our ID provided, tomorrow is then the actual handover... praying for a miracle..meanwhile, I will just share some picts first Edited July 15, 2011 by west Share this post Link to post Share on other sites
west 1 Report post Posted July 15, 2011 (edited) finally have to chance to see the night version of the house and the lighting effecthere is the track LED light we purchased for our corridor, love it a lot! and its rather bright too!this was what it looked previouslykid's room looking lovely at night with the soft glow from LED lights as well (from IKEA)Living room, the effect is stunning at night! Edited July 15, 2011 by west Share this post Link to post Share on other sites
Bluesummerayz 2 Report post Posted July 15, 2011 Nice nice nice!! Share this post Link to post Share on other sites
west 1 Report post Posted July 15, 2011 TV feature wall installed :shoe cabinet/storage near main door , mirror doors will be installed tomorrowMBR and toilet - glass wall and doors, sink, tap and accessories will be fixed tomorrow Share this post Link to post Share on other sites
west 1 Report post Posted July 15, 2011 another interesting pcs of fixture/wall at the far end of the living room, they had to stop the work in the evening becos power drill gave up, which is probably a blessing in disguise, cos we were afraid that the late drillings will attract complainsstudy room table (work in progress)kerb for the glass partition (hacked wall) for study room Share this post Link to post Share on other sites
stardust205 0 Report post Posted July 15, 2011 Looking good.. Seems like all the pieces are coming together real fast! Share this post Link to post Share on other sites
zone23 0 Report post Posted July 17, 2011 Amazing ceiling you have! Very original!So looking forward towards seeing your display cabinet! What toys are you displaying? Im a toy collector myself as well! Share this post Link to post Share on other sites
west 1 Report post Posted July 18, 2011 Amazing ceiling you have! Very original!So looking forward towards seeing your display cabinet! What toys are you displaying? Im a toy collector myself as well! i collect diecast model cars Share this post Link to post Share on other sites
west 1 Report post Posted July 18, 2011 unfortunately, handover was postponed to this coming wed... hoping that everything can be done this time roundalso faced a major hiccup last sat (the supposedly handover date), we found the kitchen leaking from the ground cabinet.was told to prepare for the worst for them to tear down the entire kitchen carpentry to locate the source of the leak (pipes are all embedded behind)it was speculated that the pipe must have been damaged during the prev reno and when we started doing our own reno, the constant turning on and off of the mains during our reno probably aggravated the damage and caused leak. there was always a wet puddle in the kitchen near when our reno began but we have shrugged it off as accidental spillage and didnt really pay attention to ittoday, about 1/4 to 1/3 of our kitchen cabinets was torn down to locate the leak and (fortunately) they pinpointed a leak in a pipe embedded in the wall, apparently, the water seeped down through the cement wall behind the tiles and escaped from the base of the kitchen cabinet. the leak was most likely caused by a goondu worker who punched the nail into the pipe during the earlier reno... cant believe it when the houses now have tapes on the wall indicating where the pipes and they can still nail it directly on the spot. anyway, we are giving it a night to see how things goes, hopefully the water that is slowly dripping out now are the residual water left in the wallno choice have to exceed a few days after handover to redo the kitchen separately for this unexpected problem... Share this post Link to post Share on other sites