1 more day left to work for tomorrow before handover

i dunno if they are going to pull it through tomorrow, the workers were still working when I left

i would estimate about 65% done?? most of the carpentry are here, waiting to be fixed up

the glassware and mirrors will come in tomorrow

really keeping fingers X!!

here are some picts for today:

laminate flooring for MBR almost complete, worker was working on the skirtings

IMG_2373.jpg

work in progress for vanity top in MBR toilet

IMG_2377.jpg

common toilet (halfway)

IMG_2378.jpg

Kid's room platform/laminate

IMG_2380.jpg

Edited by west
 

Share this post


Link to post
Share on other sites

went down did a spot check during lunch

some of the carpentry are in good.gif

the workers are also starting to clear up the place

was told that all the trash will be out by today.. hmmmmmmm....

anyway , i was simply captivated by the view just now, because the sea was so deep blue and beautiful, have never seen anything like that earlier..

8a31840c.jpg

WOW, Superb view ! :good:

 

Share this post


Link to post
Share on other sites

unfortunately, the house wasn't in the handover stage as at the end of the day

but we have seen the most progress within a single day

actually according to the schedule which our ID provided, tomorrow is then the actual handover... praying for a miracle..

meanwhile, I will just share some picts first

Edited by west
 

Share this post


Link to post
Share on other sites

finally have to chance to see the night version of the house and the lighting effect

here is the track LED light we purchased for our corridor, love it a lot! and its rather bright too!

IMG_1731.jpg

this was what it looked previously

IMG_1108.jpg

kid's room looking lovely at night with the soft glow from LED lights as well (from IKEA)

IMG_1751.jpg

Living room, the effect is stunning at night!

IMG_1749.jpg

Edited by west
 

Share this post


Link to post
Share on other sites

TV feature wall installed :

IMG_1726.jpg

shoe cabinet/storage near main door , mirror doors will be installed tomorrow

IMG_1750.jpg

MBR and toilet - glass wall and doors, sink, tap and accessories will be fixed tomorrow

IMG_1754.jpg

 

Share this post


Link to post
Share on other sites

another interesting pcs of fixture/wall at the far end of the living room, they had to stop the work in the evening becos power drill gave up, which is probably a blessing in disguise, cos we were afraid that the late drillings will attract complains

IMG_1733.jpg

study room table (work in progress)

IMG_1728.jpg

kerb for the glass partition (hacked wall) for study room

IMG_1758.jpg

 

Share this post


Link to post
Share on other sites

Amazing ceiling you have! Very original!

So looking forward towards seeing your display cabinet! What toys are you displaying? Im a toy collector myself as well! :thumbs up:

 

Share this post


Link to post
Share on other sites

Amazing ceiling you have! Very original!

So looking forward towards seeing your display cabinet! What toys are you displaying? Im a toy collector myself as well! :thumbs up:

i collect diecast model cars :)

 

Share this post


Link to post
Share on other sites

unfortunately, handover was postponed to this coming wed... :(

hoping that everything can be done this time round

also faced a major hiccup last sat (the supposedly handover date), we found the kitchen leaking from the ground cabinet.

was told to prepare for the worst for them to tear down the entire kitchen carpentry to locate the source of the leak (pipes are all embedded behind)

it was speculated that the pipe must have been damaged during the prev reno and when we started doing our own reno, the constant turning on and off of the mains during our reno probably aggravated the damage and caused leak. there was always a wet puddle in the kitchen near when our reno began but we have shrugged it off as accidental spillage and didnt really pay attention to it

today, about 1/4 to 1/3 of our kitchen cabinets was torn down to locate the leak and (fortunately) they pinpointed a leak in a pipe embedded in the wall, apparently, the water seeped down through the cement wall behind the tiles and escaped from the base of the kitchen cabinet. the leak was most likely caused by a goondu worker who punched the nail into the pipe during the earlier reno... cant believe it when the houses now have tapes on the wall indicating where the pipes and they can still nail it directly on the spot. anyway, we are giving it a night to see how things goes, hopefully the water that is slowly dripping out now are the residual water left in the wall

no choice have to exceed a few days after handover to redo the kitchen separately for this unexpected problem...

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×