west 1 Report post Posted June 20, 2011 (edited) maybe just to share some of the drawings... there will be slight changes to the final outcome but the designs are more or less there. (sorry all picts taken with iphone from paper)Living room (not doing the downlights and the fan, just purely the false ceiling with cove light) Edited June 20, 2011 by west Share this post Link to post Share on other sites
west 1 Report post Posted June 22, 2011 just a picture for today on the ceiling:other than that, not much obvious developments, still working on electrical works. oh yah, aircon installed today Share this post Link to post Share on other sites
west 1 Report post Posted July 8, 2011 the stages of the revamp of MBR toilet, still in progress...original statepartial tear downwall totally removed: Share this post Link to post Share on other sites
west 1 Report post Posted July 8, 2011 tiling in progressflooring done Share this post Link to post Share on other sites
west 1 Report post Posted July 8, 2011 common toilet :tilings almost done, left the feature tiles for the border effectWC installedCeiling done up Share this post Link to post Share on other sites
west 1 Report post Posted July 8, 2011 (edited) another area of major work, hacking of study room wall...original wall with old aircon truckinganother angle (before)hacked!!new aircon and truckingconcealing, making good and plastering Edited July 8, 2011 by west Share this post Link to post Share on other sites
west 1 Report post Posted July 10, 2011 (edited) Kerb and groove done for the glass wall/partition common bathroom wall finally done up Had to redo as wasn't too happy with the earlier design Fan installer fixing up fan Has been a hectic period for us, rushing down after work to check on the progress.So far, wet work (both toilets, and patching of floor tiles due to hacking) are done, electrical points all laid, platform foundation MBR and our kid's room (before laminates) doneScheduled handover is this coming weekend but progress still looks , everywhere is still so messy..ID has kept on assuring us that it can be done on time, based on the state of things, only about 80% convinced, but keeping our fingers crossed, no choice cos we have already scheduled the movers and the delivery was told that once the junk in the house cleared, they can follow up with the painting and start with the carpentry which can be installed quite quickly cos most prefab in the factory already...so issit true that carpentry can be done up very quickly?? really need some assurance from forummers.. the other areas of work will be installation of powerpoints/switches/lightings, bathrooms accessories (some only can be done after carpentry, ie. vanity top) and floor laminates (for MBR and one room)... Edited July 10, 2011 by west Share this post Link to post Share on other sites
west 1 Report post Posted July 10, 2011 more picts...platform for our kid's roomliving room ceiling done!see the warzone , actually photo taken few days ago, must discount about 50% since quite a fair bit of raw materials have been used for the toilets, nevertheless, still looks very messy as at today Share this post Link to post Share on other sites
Phintastic 0 Report post Posted July 10, 2011 more picts...platform for our kid's roomliving room ceiling done!see the warzone , actually photo taken few days ago, must discount about 50% since quite a fair bit of raw materials have been used for the toilets, nevertheless, still looks very messy as at todayHi neighbor, love the look of your ceiling. We are indeed neighbors, guess we are only 5 mins away, I am only right beside Dawson Fairprice. The best part is I am currently a Jurong resident too. Hahaha what a coincidence. Most of my windows faces the opposite side where the new blocks and the Dawson Skyterrace currently under construction. Luckily just nice unblock by these new buildings. Will post pics after I collected the keys. Share this post Link to post Share on other sites
west 1 Report post Posted July 11, 2011 Hope to see your picts soon. Yes, Dawson is only a 5 mins walk away for us, extremely convenient forgroceries and meals. A great plus point for us since we have to either drive toJP or IMM to do our groceries, incurring time/fuel and parking cost. But to us,the greatest convenience to us is the central location, it really cuts down alot of travelling time and cost cos we are always going town area (for work/leisure)and east side (visit parents). J Share this post Link to post Share on other sites
hafiizh 0 Report post Posted July 11, 2011 Soooo much hacking done - I LIKE! **** it - your ceiling design is very close to what I designed for my feature wall in my living room. *back to the drawing board*can't wait to see your final product - keep the updates coming! Share this post Link to post Share on other sites
west 1 Report post Posted July 11, 2011 (edited) managed to combine the hacking process into 1 picture anyway, nothing much done today except for more plasteringMBR toilet ceiling was also done up today....Was told tomorrow will clear up all the junk and do painting then carpentry will come in... 4 days left, think we are starting to feel nervous Edited July 11, 2011 by west Share this post Link to post Share on other sites
Bluesummerayz 2 Report post Posted July 11, 2011 managed to combine the hacking process into 1 picture anyway, nothing much done today except for more plasteringMBR toilet ceiling was also done up today....Was told tomorrow will clear up all the junk and do painting then carpentry will come in... 4 days left, think we are starting to feel nervous Psssssst... 4 days to what har? move in?? Share this post Link to post Share on other sites
west 1 Report post Posted July 11, 2011 To handover!!! This sat.. Arrangements have been made for movers n delivery of stuff on sat n sun Share this post Link to post Share on other sites
Bluesummerayz 2 Report post Posted July 11, 2011 To handover! This sat.. Arrangements have been made for movers n delivery of stuff on sat n sunOMG!!!! Ok I tell you ah.. u better hound them every day, carpentry is most important, dont let them say 'sure sure can can..' but in the end put the the shells only... some more after put up liao, got strong smell so u need to air them out too. I will keep my fingers and toes crossed for you... Share this post Link to post Share on other sites