Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
west

Queenstown 4 Rm Resale

Recommended Posts

Did a site survey with ID today, very surprised to find out that the walls of the toilets are not solid but hollow like tiles laid on a partition wall!!! jawdrop.gif

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Did a site survey with ID today, very surprised to find out that the walls of the toilets are not solid but hollow like tiles laid on a partition wall!!! jawdrop.gif

How old is this flat? About 5 to 6 years? The previous owners are the first owners who bought the flat directly from HDB?

Most probably they were not allowed to hack the wall when doing the tiles bec at that time it was new flat. So they may have done some overlay of tiles. You may have to hack the walls if u want to replace the tiles.

 

Share this post


Link to post
Share on other sites

nope

everything is original from hdb

just that the walls are not solid concrete, its more of like a partition , u know it when you knock/bang the wall, there is a hollow feel, it is just like hitting a board

actually my agent did tell us before that we need to pay special attention to the toilet if hacking cos the toilet walls of the flat are made of 'metal sheet' (the direct translation of what he told us in chinese)

At that time, we didn't really know what he meant but we finally understood today.

 

Share this post


Link to post
Share on other sites

nope

everything is original from hdb

just that the walls are not solid concrete, its more of like a partition , u know it when you knock/bang the wall, there is a hollow feel, it is just like hitting a board

actually my agent did tell us before that we need to pay special attention to the toilet if hacking cos the toilet walls of the flat are made of 'metal sheet' (the direct translation of what he told us in chinese)

At that time, we didn't really know what he meant but we finally understood today.

Yep, I know the hollow feeling :P

If sure your ID would make the best out it and make your reno a good one. Looking forward to your reno updates and more pics.

 

Share this post


Link to post
Share on other sites

yup

reno has officially started. the entire flooring and existing kitchen cabinets are protected today. some doors are unhinged, 1 existing built in wardrobe in the room already gone... saw all the markings on the wall on what to hack...

its gonna be a 1 mth plus wait before we can finally see the end result, really looking forward to moving in soon!

 

Share this post


Link to post
Share on other sites

yup

reno has officially started. the entire flooring and existing kitchen cabinets are protected today. some doors are unhinged, 1 existing built in wardrobe in the room already gone... saw all the markings on the wall on what to hack...

its gonna be a 1 mth plus wait before we can finally see the end result, really looking forward to moving in soon!

You not doing any major works in the kitchen? Any pics?

 

Share this post


Link to post
Share on other sites

the kitchen was renovated 1 yr ago and still in very good condition, therefore we do not intend to revamp it.

here are some pictures of the kitchen:

IMG_4586.jpg

IMG_4582.jpg

we gonna replace that brown wooden border

we may just want to just change the tap and the cabinet handles if there are leftover $$ at the end of the reno biggrin.gif

 

Share this post


Link to post
Share on other sites

protective layering laid and some of the fixtures dismantled:

IMG_1404.jpg

IMG_1401.jpg

IMG_1392.jpg

the existing build-in wardrobe in the proposed study room has been cleared! soon the wall will be demolished too!

IMG_1410.jpg

Edited by west
 

Share this post


Link to post
Share on other sites

its been quite a while since the last update

here are some pictures of the current progress:

Toilet fulled hacked, awaiting laying of new tiles:

IMG_1450.jpg

Study room wall hacked:

IMG_1501.jpg

Metal plates to go as well:

IMG_1497.jpg

 

Share this post


Link to post
Share on other sites

yeap, things are a bit slow as we didn't expect HDB to require us to get PE endorsement for the hacking of the bedroom wall, kinda disrupted the work schedule,

but we are now catching up, just about 1 wk behind.

the false ceiling are more or less done

as for the metal plates, they are embedded in the toilet walls, understand that this may be the case for the newer flats????

anyway, this is another setback because contractor couldn't remove with normal tools, need to come back again to remove them.

anyway, we are fixing up the aircon during midwk, and was told that the tilings for the toilets will be completed by wkends, keeping our fingers crossed.

Edited by west
 

Share this post


Link to post
Share on other sites

yeap, things are a bit slow as we didn't expect HDB to require us to get PE endorsement for the hacking of the bedroom wall, kinda disrupted the work schedule,

but we are now catching up, just about 1 wk behind.

the false ceiling are more or less done

as for the metal plates, they are embedded in the toilet walls, understand that this may be the case for the newer flats????

anyway, this is another setback because contractor couldn't remove with normal tools, need to come back again to remove them.

anyway, we are fixing up the aircon during midwk, and was told that the tilings for the toilets will be completed by wkends, keeping our fingers crossed.

All the best for the works to be done. Your false ceiling looks interesting. Can't wait to see the end state completed false ceiling. Update pics when ready.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×