ahpooh 0 Report post Posted April 22, 2011 (edited) After renting out my house for the past 2 years, my hubby and I decided to give it a makeover after seeing the conditions.After getting a couple of quotations, we decided to engage Alan as his quotation is one of the lowest and we feel morecomfortable dealing with him. Hacking started last week and tiling is in progess. My floor plan Edited April 22, 2011 by ahpooh Share this post Link to post Share on other sites
ahpooh 0 Report post Posted April 23, 2011 Here are the tiles, we chose:Living room:Kitchen:Clockwise from the top left ( Stove and sink support, wall tiles x 2, floor tiles )Common Bathroom:Clockwise from the left ( Wall tiles x 2, floor tiles )Master Bathroom: Wall tiles. Floor tiles will be using the same as of common bathroom floor tiles. Share this post Link to post Share on other sites
ahpooh 0 Report post Posted April 23, 2011 Hacking started last week and tiling is in progress.Uncle doing tiling for kitchenA closeup picLiving room tiling in progress. Cant step in yet. Will be checking this coming Monday. Share this post Link to post Share on other sites
emobebe 1 Report post Posted April 23, 2011 (edited) Hacking started last week and tiling is in progress.Uncle doing tiling for kitchenA closeup picLiving room tiling in progress. Cant step in yet. Will be checking this coming Monday.Nice selection of tiles. Love the colours and texture. Look warm and soothing. I think it would look great at your new home.By the way, care to share with me your quote? Can pm me ? Thanks Edited April 23, 2011 by emobebe Share this post Link to post Share on other sites
ahpooh 0 Report post Posted April 26, 2011 Uncle tiling the kitchenCommon BathroomBathroom at Master Bedroom Share this post Link to post Share on other sites
ahpooh 0 Report post Posted April 26, 2011 Living Room Share this post Link to post Share on other sites
ahpooh 0 Report post Posted May 4, 2011 My concrete stovetop Share this post Link to post Share on other sites
ahpooh 0 Report post Posted May 4, 2011 My concrete stovetop (cont) Share this post Link to post Share on other sites
ahpooh 0 Report post Posted May 4, 2011 Common BathroomFlooring:Living Room Master Bedroom Kid's Bedroom Share this post Link to post Share on other sites
ahpooh 0 Report post Posted May 4, 2011 Kid's bedroom (cont)Study room Share this post Link to post Share on other sites
ahpooh 0 Report post Posted May 4, 2011 Bathroom in Master bedroom Share this post Link to post Share on other sites
ahpooh 0 Report post Posted May 12, 2011 A few weeks had passed. Tiling was 90% done already. Air-con, water heater, toilet bowl, common bathroom sink and mixer for both toilet were fixed up. Now electric wires n false ceiling are almost done and very soon painitng is going to start. So exciting!!!! Here are some of the photos on the electric wires and false ceiling:Living roomMaster bedroom Share this post Link to post Share on other sites
ahpooh 0 Report post Posted May 12, 2011 False ceiling in Living roomMaster Bedroom Share this post Link to post Share on other sites
ahpooh 0 Report post Posted May 12, 2011 Second bedroomThird bedroom Share this post Link to post Share on other sites