sng28 2 Report post Posted April 10, 2011 (edited) Hi all bros and sis gurus, After reading and seeking so much advice...i'm totally exhausted...and well i've decided to embark on 1 ID since he was the first to give me the most accurate quote. No doubt very experience..i always believe there's the good and bad side to each The skepticals will know what i mean.or i've read too much and i think too much and i worry too much?? shrugs...this reno is eating the **** of my brain cells seriously......... and oh well..its a process i cannot avoid...so keeping fingers cross for now..to repay in kindness for all the aid provided i've decided to start a T-blog here for your viewing leisure..though mine is a small scale reno.... tight budget lah Also can i check if its normal to get the ID to check on the air-con as there are some water stains for the one in my MBR and what are the usual charges? I actually know of the company that does it for the condo estate and i was wondering if i should get them to come in instead....any advice bros? Lets start off with the basics of floor plan here Edited April 10, 2011 by sng28 Share this post Link to post Share on other sites
sng28 2 Report post Posted April 10, 2011 My main door and the to be removed divider West facing window in my MBR Purplish wall in the MBR Walkway Share this post Link to post Share on other sites
sng28 2 Report post Posted April 10, 2011 Feature wall My dining to kitchen area The MBR Toilet If you follow the ba gua colour...the owner follows very closely to it. I didnt post up the second bedroom which is pink in colour ..the passway lights are halides...there's grey and black in the living room...the master bedroom is purplish... Share this post Link to post Share on other sites
sng28 2 Report post Posted April 13, 2011 Hmm...i'm not posting anything cause my ID has yet to provide me with the 3D designs....usually how long does it take to get that done? I've just signed and paid the initial deposit on saturday afternoon though...... Share this post Link to post Share on other sites
sng28 2 Report post Posted April 14, 2011 hmm no advice...i feel a little kinda talking to myself...lol* any advice from the gurus bros and sis out there? Hmm...i'm not posting anything cause my ID has yet to provide me with the 3D designs....usually how long does it take to get that done? I've just signed and paid the initial deposit on saturday afternoon though...... Share this post Link to post Share on other sites
marshmallow 0 Report post Posted April 14, 2011 hmm no advice...i feel a little kinda talking to myself...lol* any advice from the gurus bros and sis out there? aiyo haha... cos nothing much going on mah~ sorry can't advise you cos i used contractor and no drawings de~ haha Share this post Link to post Share on other sites
stinker808 0 Report post Posted April 14, 2011 Hmm...i'm not posting anything cause my ID has yet to provide me with the 3D designs....usually how long does it take to get that done? I've just signed and paid the initial deposit on saturday afternoon though...... Hi, I would say depending on the number of drafters they have in their company. I also recently confirmed on ID on the 6th of Apr. By the 11th, the 3D drawings are out. Maybe also cos I am on a tight budget and told him to draw out the area which will be touched on, mainly the Living Hall, WIW and Kitchen. Hope it helps. BTW, u have a very nice n big place, dun think need to do much right? Cheers Share this post Link to post Share on other sites
sng28 2 Report post Posted April 14, 2011 yay someone replied me!!!!!!!!!!!!!!!!!!!!! :D hmm your sounds like mine..kitchen , WIW in study room, living room and oh mine is plus toilet and MBR....where's your place located at? You going for the electrolux sale this weekend??? hmm i hope he is nt delaying cause my partner stupidly said "its okie no hurry" :bangwall: haha mine is a tiny 2+1 ...big for me i guess.. at first i tot there's nothing much to be done..but then..EEEEEEEEEEEEEEEEEEEE THE EX OWNER literally didnt clean the KITCHEN FLOOR for the past 4 yrs!!!!!!!!!!!!! its horrible I TELL U!!! =x hence my budget burst and i have to spend 10k...just in that plc...and I DON'T EVEN COOK!!!!!!! :bangwall: oh well i Hi, I would say depending on the number of drafters they have in their company. I also recently confirmed on ID on the 6th of Apr. By the 11th, the 3D drawings are out. Maybe also cos I am on a tight budget and told him to draw out the area which will be touched on, mainly the Living Hall, WIW and Kitchen. Hope it helps. BTW, u have a very nice n big place, dun think need to do much right? Cheers Share this post Link to post Share on other sites
sng28 2 Report post Posted April 14, 2011 hahahah i think henry gave me a missed....hahahaha oh well contractors don't like me...Mr Yeak though i manage to get a slot (3 weeks waiting time nia) i got rejected coz he don't do condo.........i just gt no luck.. .........anyway i'll chase my ID for pictures!!!!!!!! then you guys can give me your ALL CENTS WORTH :D and also your precious advice and feedback..i feel that my ID is very 'old bird' and i think he knows i'm new bird...hope he doesnt eat me up man....... aiyo haha... cos nothing much going on mah~ sorry can't advise you cos i used contractor and no drawings de~ haha Share this post Link to post Share on other sites
jaskel 2 Report post Posted April 14, 2011 hahahah i think henry gave me a missed....hahahaha oh well contractors don't like me...Mr Yeak though i manage to get a slot (3 weeks waiting time nia) i got rejected coz he don't do condo.........i just gt no luck.. .........anyway i'll chase my ID for pictures!!!!!!!! then you guys can give me your ALL CENTS WORTH :D and also your precious advice and feedback..i feel that my ID is very 'old bird' and i think he knows i'm new bird...hope he doesnt eat me up man....... Don't worry....be happy. Happy renovating....welcome to the T-blog( cos u are a 'old bird' here so can't welcome u to RT) Share this post Link to post Share on other sites
stinker808 0 Report post Posted April 15, 2011 yay someone replied me!!!!!!!!!!!!!!!!!!!!! :D hmm your sounds like mine..kitchen , WIW in study room, living room and oh mine is plus toilet and MBR....where's your place located at? You going for the electrolux sale this weekend??? hmm i hope he is nt delaying cause my partner stupidly said "its okie no hurry" :bangwall: haha mine is a tiny 2+1 ...big for me i guess.. at first i tot there's nothing much to be done..but then..EEEEEEEEEEEEEEEEEEEE THE EX OWNER literally didnt clean the KITCHEN FLOOR for the past 4 yrs!!!!!!!!!!!!! its horrible I TELL U!!! =x hence my budget burst and i have to spend 10k...just in that plc...and I DON'T EVEN COOK!!!!!!! :bangwall: oh well i Hahaha.... no la... ur place is much bigger than mine.... my new place located at Woodlands. Dun think will be going down to the sales cos most of the items i alrdy bought, left only hood n hob, kitchen sink n tap. other than that, just the rest of the minor items..... too gan jiong liao.... got electronic fair i go buy liao....hahahahhaa Share this post Link to post Share on other sites
sng28 2 Report post Posted April 16, 2011 (edited) Hahaha.... no la... ur place is much bigger than mine.... my new place located at Woodlands. Dun think will be going down to the sales cos most of the items i alrdy bought, left only hood n hob, kitchen sink n tap. other than that, just the rest of the minor items..... too gan jiong liao.... got electronic fair i go buy liao....hahahahhaa woah you are fast man!!!!!! i've yet to buy anything yet though.........=X my 3Ds didnt show up in my mail box yesterday......so officially its like 1 week from the day i put my dwnpayment...hmm its not good to delay on the FIRST impression after payment though......the initial quotation came like within 36 hours loh...sigh* crossing my fingers tightly....... Edited April 16, 2011 by sng28 Share this post Link to post Share on other sites
sng28 2 Report post Posted April 16, 2011 First item that I've bought for my home...hahahaha besides the magic mop/pail, etc ahahha I'm gng for the sale soon..lets see if i can pick anything from eletrolux later.. Share this post Link to post Share on other sites
sng28 2 Report post Posted April 16, 2011 (edited) Hihi i'm back from the sale! didnt get anything but eletrolux but have gotten a trudle bed and sofa from Xclusive Living instead By the way , my 3D differs a fair bit from the existing actual...eg ceiling fan that is there is not in the 3D, the bay window height is wrong, little nitty gritty details like this which may have an impact on the outcome..do you get the ID to redo the 3D? My WIW in the study area My MBR Living Kitchen which is so totally not what i wanted LOL Edited April 16, 2011 by sng28 Share this post Link to post Share on other sites
sng28 2 Report post Posted April 17, 2011 quick qn to my bros and sisters..how accurate must the 3D be? in terms of paint and all? or is it just a rough gauge? Like i have the toilet revamp but i don't hv the toilet 3D and there's a shoe rack that i will be having but its not in the 3D as well. Honestly i'm not too sure of the purpose of this 3D ... =x Share this post Link to post Share on other sites