JCase 0 Report post Posted May 13, 2011 hey hey! finally seen this! Let me know when's a good time to drop by!Are you in town? Peeps have said they have tried calling you unsuccessfully I will post some pics of what has been over on Mon or Tues. Will arrange for you to drop by when the tiling is completed, shld take another week or two. Share this post Link to post Share on other sites
patsy_sg 1 Report post Posted May 13, 2011 ooops... am still away, back Monday. keep forgetting to turn off that phone! can you please tell them i'm back on Monday and will be able to receive calls then?? Share this post Link to post Share on other sites
Wenx 0 Report post Posted May 13, 2011 Tiles selection. Big headache, so many to choose from. Lucky only went to one source - SBH, eventhen I went down 3 times to select / re-select. Lucky ID is patient, SBH staff some less so and others quite accommodating.Kitchen floor tile ....<img src="http://i223.photobucket.com/albums/dd217/Steggles_2007/KitchenFloorTiles-1.jpg" border="0" class="linked-image" />Hi JCAse, just popping by to see your reno... NICE kitchen floor tiles... am eager to see the whole effect of your tiles... Share this post Link to post Share on other sites
JCase 0 Report post Posted May 13, 2011 Hi JCAse, just popping by to see your reno... NICE kitchen floor tiles... am eager to see the whole effect of your tiles... Thanks. I'm actually a little worried. I have deviated from my normal black, white and red and will be going for earth tones, browns and creams. Almost resort like. Hopefully the good folks of CLC will be able to translate and deliver. Looked good in the 3D but let's see the finished product. Share this post Link to post Share on other sites
Wenx 0 Report post Posted May 13, 2011 Thanks. I'm actually a little worried. I have deviated from my normal black, white and red and will be going for earth tones, browns and creams. Almost resort like. Hopefully the good folks of CLC will be able to translate and deliver. Looked good in the 3D but let's see the finished product. dont worry usually 3D wont differ much.... i'm now into red, black and white modern design.... but resort style is good.. relaxing and feels like on holiday every time when u reach home... Share this post Link to post Share on other sites
May_dream1 14 Report post Posted May 13, 2011 Thanks. I'm actually a little worried. I have deviated from my normal black, white and red and will be going for earth tones, browns and creams. Almost resort like. Hopefully the good folks of CLC will be able to translate and deliver. Looked good in the 3D but let's see the finished product. Don't worry if it's good in 3D it will be better in real. Share this post Link to post Share on other sites
JCase 0 Report post Posted May 24, 2011 I just blasted the condo manager for being a rigid, inflexible cretin.The security guard refused to let the electrician in this am because he contravened by-laws by working until 3pm silently pulling cables when work stop on Sat is 1pm.I've resolved the issue now. Share this post Link to post Share on other sites
Kobelala 8 Report post Posted May 24, 2011 I just blasted the condo manager for being a rigid, inflexible cretin.The security guard refused to let the electrician in this am because he contravened by-laws by working until 3pm silently pulling cables when work stop on Sat is 1pm.I've resolved the issue now.Bro cool cool.... but i agreed sometimes some people need to be blasted Share this post Link to post Share on other sites
footprint 0 Report post Posted May 24, 2011 your tiles are interesting pretty!though i agree, the cleaning is a hazard. good u have a helper. waiting for updates (read: photos)! Share this post Link to post Share on other sites
JCase 0 Report post Posted May 24, 2011 your tiles are interesting pretty!though i agree, the cleaning is a hazard. good u have a helper. waiting for updates (read: photos)! I would love to update but by the time I get to the unit each nite to check I have to do so using a torch light. I think most of the tiling should be done so I'll take pics and post over the weekend.Luckily for us not much action happens in the kitchen on weekdays so touch wood floor and stuff should be relatively clean. Share this post Link to post Share on other sites
JCase 0 Report post Posted May 24, 2011 Bro cool cool.... but i agreed sometimes some people need to be blasted Bro this fella is your typical bureaucrat paper pusher. He deserved the blasting. I was in meeting this morning with my boss and CEO and ID calls me to says that electrician barred from condo. wtf? Share this post Link to post Share on other sites
JCase 0 Report post Posted May 25, 2011 Partial view of living room - hackedCommon toilet hacked and plubling works being doneTiling for Family room done- mostlyKitchen tilesThe fmaily room and kitchen tiles taken using only a led torch light as only light source. will retake again over the weekend under natural light. Share this post Link to post Share on other sites
Kobelala 8 Report post Posted May 25, 2011 Bro this fella is your typical bureaucrat paper pusher. He deserved the blasting. I was in meeting this morning with my boss and CEO and ID calls me to says that electrician barred from condo. wtf? Bro, when u move in, tekan him back then him... Tiling for Family room done- mostlyKitchen tilesThe fmaily room and kitchen tiles taken using only a led torch light as only light source. will retake again over the weekend under natural light.Bro, can see the kitchen effect will be very nice... is that wooden tiles for living ? Share this post Link to post Share on other sites
JCase 0 Report post Posted May 25, 2011 I wlll tekan the fella again soon. This tile is normal homo tile with faux woody look. Only for family room. Living and dining is cream 60 x 60. Share this post Link to post Share on other sites
JCase 0 Report post Posted May 27, 2011 My handover allegedly on 21 June, so a 6+ weeks process.From what I can seein the dim light at night:1. Wet works completed2. Major electrical completed3. Major ceiling works completed4. Major aircon truncking etc completed5. New windows installedNext week from Mon to Wed painting will beging. Following which the next 2 weeks will be installation of carpentry, showers screens etc.Now need to check on aupicious time for symbolic and actual move in date. Share this post Link to post Share on other sites