amokduke 0 Report post Posted April 4, 2011 Day 15: Met with ID and she promised to rectified all faults we found so far. She also let me know the faults she found on her own and will rectify them too. Flooring is completed! Master bedroom: Study area: Walk-in wardrobe: (Skirting not done where the new wardrobe cabinet will be at) Bedroom 2: Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 4, 2011 Day 15 continue... All the sewage pipes painted with glossy white ICI paint. Waterheater mounted but not connected yet: (707 Alphine $195 from KONG TAI TRADING) Share this post Link to post Share on other sites
May_dream1 14 Report post Posted April 4, 2011 day 15 already almost done?? very fast!!! Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 4, 2011 day 15 already almost done?? very fast!!! Ya loh... we are surprised it is so fast too... ahead of schedule by 2 weeks. Share this post Link to post Share on other sites
May_dream1 14 Report post Posted April 4, 2011 Ya loh... we are surprised it is so fast too... ahead of schedule by 2 weeks. hhmmm.... how i wish mine will be ahead of schedule too. Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 6, 2011 Day 17: PUB Testing... Did the PUB electrical testing today... PASSED TV Room: Fan was reinstalled by the electrician and the scratching sound is gone... feels the wind from this KDK baby fan is weak compared to normal ceiling fan, but should be enough for the TV room. Dining Area: ID suggest install the hanging lights after everything else is up so as to prevent accidential damage to the lights. Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 6, 2011 Day 17 continue... Master Bathroom: Installed bi-fold door with matching patterns. The heater power point is changed to this grey box at the top... Changed all the wired glass pane to frosted glass. Master Bedroom: Entrance to the Bedroom.. Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 8, 2011 Day 19: Citygas came to install the Gas pipe... $100 How the Kitchen looks like now... TV Room: Added wood to install the glass panel and sliding door But the wood is not parallel to the ceiling! If you notice, the wood is slanted; such that the downlight at the far end is too close to the wood and has to be removed... ID promised that everything will be straight at the end of the day.... ID managed to smoothen the uneven sealed toilet entrance by plastering... but somehow only the right side got plastered?!.... sigh has to ask ID to arrange to plaster again Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 8, 2011 Day 19 Continue... ID fixed a big lobang done by the previous owner's aircon installer: Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 9, 2011 (edited) Day 20... Spent whole day setting up the Kitchen Cabinet... Left most pic... All the ugly piping are boxed-up. Edited April 9, 2011 by amokduke Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 12, 2011 Day 23... Maingate: ID sticked this "Please take out your SHOES before enter" on the maingate. Kitchen: Almost completed! All the doors come with "soft-close" hinges. Missing doors due to "QC" process by their own head carpenter who came to inspect. White box hanging on the right is for microwave oven. Got Rinnai RB-39V(B) 3-Burner Black Tempered Glass Hob and RH-390 Hood from Universal Union for $663.40. Good service and timely delivery. At far end, MN TR210 S/S Sink $280 from Poh Joo. Good buy! Deep and made of good quality steel. Feature wall and Console: Almost done too. Doors come with "soft-close" hinges also. Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 12, 2011 (edited) Day 23 continue... Walk-in wardrobe: Dresser with mirror that can be closed on the left. Pull out full length mirror on the right. Good quality work here. Length: 2.8 metres. Design of the laminate reflected on the floor... Edited April 13, 2011 by amokduke Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 13, 2011 (edited) Day 24... TV Room: Glass partition up! Sliding Door to TV Room: Feature wall + TV Console: Edited April 15, 2011 by amokduke Share this post Link to post Share on other sites
hafiizh 0 Report post Posted April 13, 2011 Looking good! Thumbs up Share this post Link to post Share on other sites
footprint 0 Report post Posted April 14, 2011 looks good! and very fast! guess going be completed in another 1-2weeks time? Share this post Link to post Share on other sites