Day 15:

Met with ID and she promised to rectified all faults we found so far. She also let me know the faults she found on her own and will rectify them too.

Flooring is completed! Master bedroom:

th_day15MasterBedroom1.jpg

th_day15Study.jpg

Study area:

th_day15Study2.jpg

Walk-in wardrobe: (Skirting not done where the new wardrobe cabinet will be at)

th_day15Wardrobe.jpg

Bedroom 2:

th_day15Bedroom2.jpg

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Day 15 continue...

All the sewage pipes painted with glossy white ICI paint.

th_day15PipingPaint.jpg

th_day15PipingPaint2.jpg

Waterheater mounted but not connected yet: (707 Alphine $195 from KONG TAI TRADING)

th_day15HeaterSet.jpg

 

Share this post


Link to post
Share on other sites
day 15 already almost done?? very fast!!!

Ya loh... we are surprised it is so fast too... ahead of schedule by 2 weeks.

 

Share this post


Link to post
Share on other sites
Ya loh... we are surprised it is so fast too... ahead of schedule by 2 weeks.

hhmmm.... how i wish mine will be ahead of schedule too. :(

 

Share this post


Link to post
Share on other sites

Day 17: PUB Testing...

Did the PUB electrical testing today... PASSED

th_day17PUBTesting.jpg

TV Room:

th_day17TVRoom.jpg

Fan was reinstalled by the electrician and the scratching sound is gone... feels the wind from this KDK baby fan is weak compared to normal ceiling fan, but should be enough for the TV room.

Dining Area:

th_day17DiningArea.jpg

ID suggest install the hanging lights after everything else is up so as to prevent accidential damage to the lights.

 

Share this post


Link to post
Share on other sites

Day 17 continue...

Master Bathroom:

th_day17MasterBathroomDoorB.jpg

Installed bi-fold door with matching patterns.

th_day17HeaterPoint.jpg

The heater power point is changed to this grey box at the top...

th_day17WindowPane.jpg

Changed all the wired glass pane to frosted glass.

Master Bedroom:

th_day17MasterBedroomEntrance.jpg

Entrance to the Bedroom..

 

Share this post


Link to post
Share on other sites

Day 19:

Citygas came to install the Gas pipe... $100

th_day19CityGasPipe.jpg

How the Kitchen looks like now...

th_day19Kitchen.jpg

TV Room: Added wood to install the glass panel and sliding door

th_day19TVRoom.jpg

But the wood is not parallel to the ceiling! If you notice, the wood is slanted; such that the downlight at the far end is too close to the wood and has to be removed... ID promised that everything will be straight at the end of the day....

th_day19TVRoomB.jpg

ID managed to smoothen the uneven sealed toilet entrance by plastering... but somehow only the right side got plastered?!.... sigh has to ask ID to arrange to plaster again

th_day19OldToiletEntrance.jpg

 

Share this post


Link to post
Share on other sites

Day 20...

Spent whole day setting up the Kitchen Cabinet... Left most pic...

th_day20Kitchen.jpgth_day19Kitchen.jpgth_day6Kitchen.jpgth_day1Kitchen.jpgth_oldKitchen.jpg

All the ugly piping are boxed-up.

Edited by amokduke
 

Share this post


Link to post
Share on other sites

Day 23...

Maingate:

th_day23MainGate.jpg

ID sticked this "Please take out your SHOES before enter" on the maingate.

Kitchen:

th_day23Kitchen.jpg

Almost completed! All the doors come with "soft-close" hinges. Missing doors due to "QC" process by their own head carpenter who came to inspect. White box hanging on the right is for microwave oven.

Got Rinnai RB-39V(B) 3-Burner Black Tempered Glass Hob and RH-390 Hood from Universal Union for $663.40. Good service and timely delivery.

At far end, MN TR210 S/S Sink $280 from Poh Joo. Good buy! Deep and made of good quality steel.

Feature wall and Console:

th_day23TVRoom.jpgth_day23TVRoomB.jpg

Almost done too. Doors come with "soft-close" hinges also.

 

Share this post


Link to post
Share on other sites

Day 23 continue...

Walk-in wardrobe:

th_day23WardrobeC.jpgth_day23WardrobeB.jpgth_day23WardrobeA.jpgth_day24WalkinWardrobe.jpg

Dresser with mirror that can be closed on the left. Pull out full length mirror on the right. Good quality work here. Length: 2.8 metres.

th_day23WardrobeD.jpg

Design of the laminate reflected on the floor...

Edited by amokduke
 

Share this post


Link to post
Share on other sites

Day 24...

TV Room:

th_day24LivingA.jpg

Glass partition up!

Sliding Door to TV Room:

th_day24LivingB.jpgth_day24LivingC.jpg

Feature wall + TV Console:

th_day24TVRoom.jpg

Edited by amokduke
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×