amokduke 0 Report post Posted March 28, 2011 (edited) Day 8 (28/3/2011) The new door frame is up. (Change the door frame because the old door opens to the right; which will block the newly hacked entrance) Living... There is no trace of the sealed entrance Living another view Edited March 30, 2011 by amokduke Share this post Link to post Share on other sites
amokduke 0 Report post Posted March 29, 2011 (edited) Day 9 (1st round of painting completed) Study: Unlike the living room, the sealed toilet entrance is rather uneven... Master bedroom: Living: Edited March 30, 2011 by amokduke Share this post Link to post Share on other sites
amokduke 0 Report post Posted March 30, 2011 (edited) Day 10 (Water piping and lights installation) Living: Sealed entrance's skirting to be done tomorrow. TV Room: down light installed halfway Kitchen: Kitchen Cabinet base: Edited March 30, 2011 by amokduke Share this post Link to post Share on other sites
amokduke 0 Report post Posted March 30, 2011 (edited) Washing machine base: (Washing machine drainage is the white pipe behind) Kitchen sink drainage: Water piping for washing machine and kitchen sink: Edited March 30, 2011 by amokduke Share this post Link to post Share on other sites
amokduke 0 Report post Posted March 30, 2011 (edited) Common Bathroom water piping: Bedroom2: (Painter painted wrong colour for the wall on the right... sigh.. supposed to remove the hook from the ceiling too) Outside storeroom: Master bedroom entrance: (The floor within the bedroom will be covered with laminated flooring) Master bedroom: Edited March 30, 2011 by amokduke Share this post Link to post Share on other sites
amokduke 0 Report post Posted March 30, 2011 (edited) Study view from master bedroom: Study: (Network CAT 6 point and double power point will be installed where the wires are) Toilet view from inside walk-in wardrobe: Edited March 30, 2011 by amokduke Share this post Link to post Share on other sites
amokduke 0 Report post Posted March 30, 2011 (edited) Master Bathroom: The curb is for the showerscreen Like the wavy 3D effect from the wall tiles... Excellent workmanship from the tilers: Edited March 30, 2011 by amokduke Share this post Link to post Share on other sites
amokduke 0 Report post Posted March 31, 2011 Day 11: Part of the dining lights is up! Effects it has on the living room wall Bedroom2 Light DB board installed in the storeroom Floorings has arrived Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 1, 2011 Day 12: Most of the lights are up... Got all of them from lightings.com.sg Excellent services and timely delivery. They also allow me to return 2x downlight that was not used due to mis-communication between ID and electrician. Admin fee for refund is only 3% hee. Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 1, 2011 Day 12 continue... T5 lights outside the TV room... Laminated platform inside the TV room. =) KDK Ceiling fan M11SU "Silver" ($180 from KONG TAI TRADING) for days when aircon is not needed. Too bad the electrician didn't install it well. The fan is a bit off center and gives a "scratching" sound everytime it spin. Don't dare to turn it on untill it is fixed. Matching Kitchen lights and service balcony lights Somehow one of the light inside the the service balcony light is not working... will check with ID tmr. Storeroom uses this "ES holder" that cost $10 only including the bulb. Cheap! Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 1, 2011 Day 12 continue... Platform Bed for the master bedroom: The KDK Ceiling fan M11SU is installed properly here. For $180, it is a good buy. Will throw a king-size mattress on top and that's it! no need for bedframe. Ceiling lights for the walk-in wardrobe: The individual light bulb can be adjusted to shine where light is needed. The view of walk-in wardrobe from inside the master bathroom Matching ceiling light with the master bathroom tile highlight Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 1, 2011 (edited) Day 12 continue 2x Ceiling lights for the study.. The KDK wall fan M40MS ($130 from KONG TAI TRADING) is positioned to blow into the walk-in wardrobe too. Edited April 1, 2011 by amokduke Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 2, 2011 (edited) Day 13: The laminated platform for the master bedroom The workmanship for the laminated platforms are good... Found a crack in the bathrom tiles! (edit: found to be caused by electrician... in the end, the bill for the repair sent to him) Arranged to speak to ID on monday to rectify all the faults found so far... Edited April 14, 2011 by amokduke Share this post Link to post Share on other sites
slegna 0 Report post Posted April 2, 2011 Hi! You house seems to be coming along just great, can't wait to see the final look I'm also interested in Sky creations, could you please (much appreciation!) PM me your quotation and breakdown? We're also thinking about a platform bed, do you think lamination will stand up to the test of time? Thanks for any input and also for your informative thread! Share this post Link to post Share on other sites
amokduke 0 Report post Posted April 3, 2011 (edited) Hi! You house seems to be coming along just great, can't wait to see the final look I'm also interested in Sky creations, could you please (much appreciation!) PM me your quotation and breakdown? We're also thinking about a platform bed, do you think lamination will stand up to the test of time? Thanks for any input and also for your informative thread! Sure! Yesterday we tried jumping on the platform... feels ok. There is a lot of "ribs" underneath so it should be able to hold haha. Send you the quotation via PM.. Edited April 3, 2011 by amokduke Share this post Link to post Share on other sites