My ID applied for hacking for 21-23th March... However till today (22th), there are still items "pending approval"... Anyone encountered this kind of situation before?

Hacking for approved items are completed though. What is the likely outcome for this?

Thanks

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
Hi,

My ID applied for hacking for 21-23th March... However till today (22th), there are still items "pending approval"... Anyone encountered this kind of situation before?

Hacking for approved items are completed though. What is the likely outcome for this?

Thanks

WHat you mean by approved items are completed? then isn't it approved?

 

Share this post


Link to post
Share on other sites
Hi,

My ID applied for hacking for 21-23th March... However till today (22th), there are still items "pending approval"... Anyone encountered this kind of situation before?

Hacking for approved items are completed though. What is the likely outcome for this?

Thanks

This is very common, your ID has done it's job well, just go concentrate on your own job

to earn fund for your reno, the rest leave it to him to arrange ;)

 

Share this post


Link to post
Share on other sites
WHat you mean by approved items are completed? then isn't it approved?

Oh means hacking for items approved is done... where as pending approval is not done.

Items Approved:

The flat owner is permitted to carry out the following renovation works subject to the HDB's terms and conditions governing renovation works in HDB residential premises. The renovation works are to be completed by 18/04/2011.

1. Replacement of existing floor finishes with HOMOGENEOUS floor finishes at MASTER BATHROOM CUM TOILET.

a. Maximum thickness including the tiles and screed must not exceed 50mm.

b. To use the prepack mortar/waterproof screed and waterproofing membrane for wet areas such as bathroom/toilets/balconies before laying of new floor tiles. Membrane should be upturned (up to 150 mm) against the walls, kerbs and pipes.

c. To use UPVC floor trap grating with long collar at the floor traps.

2. Replacement of existing wall tiles with HOMOGENEOUS wall tiles at MASTER BATHROOM CUM TOILET up to ceiling height.

Items Pending Approval:

The following proposed renovation works are pending evaluation by our Technical Departments. We will let you know the result in due course.

1. Demolition of internal walls at (a) BEDROOM 1 (MASTER OR MAIN BEDROOM) and (b) MASTER BATHROOM CUM TOILET marked RED on plan.

2. Erection of new wall using 63mm hollow block at Master Bedroom.

 

Share this post


Link to post
Share on other sites
This is very common, your ID has done it's job well, just go concentrate on your own job

to earn fund for your reno, the rest leave it to him to arrange ;)

okay,

just that

1) even if ID can get the approval eventually, the hacking will be done outside the approved time window.

2) Aircon installation may happen BEFORE hacking... Possible that hacking damages aircon.

 

Share this post


Link to post
Share on other sites
okay,

just that

1) even if ID can get the approval eventually, the hacking will be done outside the approved time window.

2) Aircon installation may happen BEFORE hacking... Possible that hacking damages aircon.

can you ask your ID to provide work schedule if pending approved one week after?

think that can help solve you Question

 

Share this post


Link to post
Share on other sites
can you ask your ID to provide work schedule if pending approved one week after?

think that can help solve you Question

Hee, anyway problem solved. HDB approved the plan today. =)

 

Share this post


Link to post
Share on other sites
This is very common, your ID has done it's job well, just go concentrate on your own job

to earn fund for your reno, the rest leave it to him to arrange ;)

yea fully support this! :P

No time wastage too! Don't worry about it like what tiler seng said, just concentrate on your job! Its his job to arrange all the jobs. So just chillax yea ?

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×