angeliqueho81 0 Report post Posted February 20, 2011 (edited) Hi all, This is my first time attempting a blog. I have been in this forum for past years while waiting for our 2nd nest's keys. Finally gotten it. Below is the floor plan. Its a 4-room HDB at boon keng road.... The room, kitchen and bathrooms essential furnishing has been done up, so my renovation involves only some touches up. Stay tuned to more pictures Edited February 20, 2011 by angeliqueho81 Share this post Link to post Share on other sites
lazybum9 1 Report post Posted February 20, 2011 (edited) hi angel, i'm staying in CV too, blk 9...which blk u in??? have u moved in??? i'm still waiting for defects to be rectified before starting reno... Edited February 20, 2011 by lazybum9 Share this post Link to post Share on other sites
angeliqueho81 0 Report post Posted February 20, 2011 hi angel, i'm staying in CV too, blk 9...which blk u in??? have u moved in??? i'm still waiting for defects to be rectified before starting reno... hello lazybum9, i'm in blk 9 too. Havn't move in. I just went to view the defects rectification progress.. very disappointed that HH havn't done anything despite 2 weeks since. Share this post Link to post Share on other sites
angeliqueho81 0 Report post Posted February 20, 2011 Ok... time for some pictures of our new place Only taken a few... Kitchen: Living room (entrance view): Balcony: Renovation will be starting soon, coming tuesday!!! Basically only doing: 1) Shoe cabinet 2) False wall and tv console 3) display cabinet 4) all bay windows with veneer/cushions 5) side tables for bedrooms 6) chengal wood decking for whole balcony Share this post Link to post Share on other sites
angeliqueho81 0 Report post Posted February 20, 2011 Continue..... Balcony (another view): Planter box: Bedroom 3: Masterbedroom view: Share this post Link to post Share on other sites
wayne900 0 Report post Posted February 20, 2011 hi, angeliqueho81 i am staying at CV too. Believe you are in the CV forum too. Share this post Link to post Share on other sites
angeliqueho81 0 Report post Posted February 20, 2011 Electric appilances we have bought so far... 42" Philips TV: Philips soundbar: Mitsubishi Fridge: Samsung Washer/Dryer: Share this post Link to post Share on other sites
lazybum9 1 Report post Posted February 20, 2011 Ok... time for some pictures of our new place Only taken a few... Kitchen: Living room (entrance view): Balcony: Renovation will be starting soon, coming tuesday!!! Basically only doing: 1) Shoe cabinet 2) False wall and tv console 3) display cabinet 4) all bay windows with veneer/cushions 5) side tables for bedrooms 6) chengal wood decking for whole balcony not doing anything for MBR??? how much is your quotation??? i got a shock when received quotations...all overrun my budget... Share this post Link to post Share on other sites
lazybum9 1 Report post Posted February 20, 2011 hi, angeliqueho81 i am staying at CV too. Believe you are in the CV forum too. hey wayne, how's everything coming along??? i still waiting for defects to be done man...last friday went up only done a few things...major ones haven't touch yet... Share this post Link to post Share on other sites
wayne900 0 Report post Posted February 20, 2011 i just collected my keys on 17th Feb. Den joint inspection just done yesterday. Now for the next 2 weeks, they will rectify the defects lo.. at the same time, doing ID selection. You selected your ID already? Share this post Link to post Share on other sites
angeliqueho81 0 Report post Posted February 21, 2011 hi, angeliqueho81 i am staying at CV too. Believe you are in the CV forum too. Yup! At CV forum too. haha. Look forward to both yours and lazybum reno photos Share this post Link to post Share on other sites
angeliqueho81 0 Report post Posted February 21, 2011 not doing anything for MBR??? how much is your quotation??? i got a shock when received quotations...all overrun my budget... For MBR we will be doing mirror at one side of the wall, 2 side tables, wall lights, wallpapers and the bay window ledges, one side will be cushion another side will be veneer ledge. Very excited, cos renovation starting soon Share this post Link to post Share on other sites
May_dream1 14 Report post Posted February 21, 2011 Yup! At CV forum too. haha. Look forward to both yours and lazybum reno photos There is a cv forum? Reno starting tmr? How long will it take? All defects already rectified? Share this post Link to post Share on other sites
wayne900 0 Report post Posted February 21, 2011 angeliqueho81 getting ID or contractor? I hope i can finalize my ID by this week den start reno in march. will start my reno t-blog once i selected my ID. Share this post Link to post Share on other sites
wayne900 0 Report post Posted February 21, 2011 by the way, lazybum9, what is your budget for reno? selected your contractor/id liao? My budget is $10k so far and still waiting for quotation from ID. Share this post Link to post Share on other sites