st96 0 Report post Posted April 23, 2011 Sorry for not updating my Blog. Lost count of the number of days already .....Progress:New Wall - doneFoor Tiling & Wall Tiling - doneWindows - doneAir-Con - trucking doneNext 1-2 weeks:Electrical WorksCeiling WorksRelocation of OpenNetRunning of Gas PipePiping WorksItems need to be purchased:Lights & FansCurtain / Roller Blind Share this post Link to post Share on other sites
st96 0 Report post Posted April 24, 2011 Just came back from *** (thry my ID). Total damage closed to $3K for lights (whole unit) & fans (5 ceiling + 2 wall).Also obtain quotation from them:Full Ht Curtain - $1,800 (approx 9m run)Half-Ht Roller Blind - $1,800 (approx 10m run) Share this post Link to post Share on other sites
st96 0 Report post Posted May 2, 2011 (edited) Progress:New Wall - doneFoor Tiling & Wall Tiling - doneWindows - doneAir-Con - trunking doneCeiling Works - donePlumbing - doneWiring - doneNext 1-2 weeks:Painting, (Date: 3 - 6 May 11)Installation of Lights & Fans, (Date: 5 - 6 May 11)Relocation of OpenNet, (Date: 5 May 11)Installation of Air-Con Compressor & Fan Coil Units, (Date: 14 May 11)Installation of Cabinet, (Date: 14 May 11)Installation of Doors & Gate, (Date: 14 May 11)Installation of Solid Top, Hob & Hood, (Date: 21 May 11)Recent purchased:Curtain / Roller Blind - e-Curtains Trading, installation date: Sat 21 May 11Planned move-in date:Sat 28th May 2011 Edited May 2, 2011 by st96 Share this post Link to post Share on other sites
mae29 2 Report post Posted May 3, 2011 Bro SunnyWow...lookalike these 2 weeks will be crucial period where most activities take place. By the way, noticed your OpenNet schedule i. 5 May. When did you make the appointment with them? Seems like you have a shorter waiting period since reno starts. I recalled I have to wait for 2 months for OpenNet to come to relocate the TP box!! Progress:New Wall - doneFoor Tiling & Wall Tiling - doneWindows - doneAir-Con - trunking doneCeiling Works - donePlumbing - doneWiring - doneNext 1-2 weeks:Painting, (Date: 3 - 6 May 11)Installation of Lights & Fans, (Date: 5 - 6 May 11)Relocation of OpenNet, (Date: 5 May 11)Installation of Air-Con Compressor & Fan Coil Units, (Date: 14 May 11)Installation of Cabinet, (Date: 14 May 11)Installation of Doors & Gate, (Date: 14 May 11)Installation of Solid Top, Hob & Hood, (Date: 21 May 11)Recent purchased:Curtain / Roller Blind - e-Curtains Trading, installation date: Sat 21 May 11Planned move-in date:Sat 28th May 2011 Share this post Link to post Share on other sites
st96 0 Report post Posted May 7, 2011 Progress:New Wall - doneFoor Tiling & Wall Tiling - doneWindows - doneAir-Con - trunking doneCeiling Works - donePlumbing - doneWiring - doneRelocation of OpenNet - doneInstallation of Doors & Gate - doneNext 1-2 weeks:Painting, delayed and only start on Mon 9 May 11Installation of Lights & Fans, delayed and only start on Mon 9 May 11Installation of Air-Con Compressor & Fan Coil Units, (Date: 14 May 11)Installation of Cabinet, (Date: 14 May 11)Installation of Solid Top, Hob & Hood, (Date: 21 May 11)Installation of Curtain, (Date 21 May 11)Planned move-in date:Sat 28th May 2011 Share this post Link to post Share on other sites
st96 0 Report post Posted May 7, 2011 (edited) Some Photographs:Main EntranceLiving Room (Wall for TV Console)Entrance to BedroomsMaster Bedroom Toilet Edited May 7, 2011 by st96 Share this post Link to post Share on other sites
mae29 2 Report post Posted May 10, 2011 (edited) Wow...BroI like the wall tiles in your master toilet, and the sink is unique!!Some Photographs:Main EntranceLiving Room (Wall for TV Console)Entrance to BedroomsMaster Bedroom Toilet Edited May 10, 2011 by mae29 Share this post Link to post Share on other sites
st96 0 Report post Posted May 11, 2011 Progress:New Wall - doneFoor Tiling & Wall Tiling - doneWindows - doneAir-Con - trunking doneCeiling Works - donePlumbing - doneWiring - doneRelocation of OpenNet - doneInstallation of Doors & Gate - donePainting - doneInstallation of Lights & Fans - doneOutstanding:Installation of Air-Con Compressor & Fan Coil Units, (Date: 14 May 11)Installation of Cabinet, (Date: 14 May 11)Installation of Solid Top, Hob & Hood, (Date: 21 May 11)Installation of Curtain, (Date: 21 May 11)Planned move-in date:Sat 28th May 2011 (Mover: 138 Professional Movers)Shall take some photographs to share ..... Share this post Link to post Share on other sites
May_dream1 14 Report post Posted May 11, 2011 We have the same sink!! It's nice, right? Share this post Link to post Share on other sites
mae29 2 Report post Posted May 11, 2011 We have the same sink!! It's nice, right?It is a nice sink...the depth is deep so water won't splash everywhere. My colleague gave me his advice to buy sink with wide 'mouth' & deep enough when I was renovating my place. HMmmm how come I didn't see this sink during that time Share this post Link to post Share on other sites
May_dream1 14 Report post Posted May 11, 2011 It is a nice sink...the depth is deep so water won't splash everywhere. My colleague gave me his advice to buy sink with wide 'mouth' & deep enough when I was renovating my place. HMmmm how come I didn't see this sink during that time When u come on 21at, you can have a look. Took me a while to look for sinks too. But managed to find this which I quite like but not cheap lah. Share this post Link to post Share on other sites
st96 0 Report post Posted May 11, 2011 It is a nice sink...the depth is deep so water won't splash everywhere. My colleague gave me his advice to buy sink with wide 'mouth' & deep enough when I was renovating my place. HMmmm how come I didn't see this sink during that time It is nice to know that both May & Mae like this sink too! Yes, I chose this sink becos of it depth. Mae, I thought both of us purchased from the same shop!? Share this post Link to post Share on other sites
mae29 2 Report post Posted May 11, 2011 It is nice to know that both May & Mae like this sink too! Yes, I chose this sink becos of it depth. Mae, I thought both of us purchased from the same shop!?Bro, I think my eyes got stamps lor....didn't see this sink while I was there choosing. Maybe I was browsing for sink with cabinet first & overlook this sink. I remember I only saw the normal ones but not like yours. Bro, how much you pay for that sink? How about your common toilet? Same design? Share this post Link to post Share on other sites
st96 0 Report post Posted May 12, 2011 Identical WC & Basin & Heater for both toilets. Except the colour schemes are difference.These are normal "GEO" products:WC - $400 each bf GST & bf discountBasin - $200 each bf GST & bf discount"707" Princeton instant Heater - $300 each bf GST & bf discount Share this post Link to post Share on other sites
May_dream1 14 Report post Posted May 12, 2011 Identical WC & Basin & Heater for both toilets. Except the colour schemes are difference.These are normal "GEO" products:WC - $400 each bf GST & bf discountBasin - $200 each bf GST & bf discount"707" Princeton instant Heater - $300 each bf GST & bf discountHow much after discount then? Share this post Link to post Share on other sites