footprint 0 Report post Posted March 23, 2011 so smart!!! yup, 3rd floor is in between... go up also not easy, go down also not easy... haiz... wah.. i very zhun! Share this post Link to post Share on other sites
footprint 0 Report post Posted March 24, 2011 Had a discussion with my ID last night to confirm on the internal of wardrobe as well as kitchen and the recess area by the living area. Realized painting started .. present installed too... haa ... Next week lightings will be up. Next wed laminates will be done. Following week carpentry will be installed ... Seems still on schedule ... Share this post Link to post Share on other sites
joyousonline 0 Report post Posted March 24, 2011 wow your reno process is gng on well!! soon you are able to move in!!! envy envy! Share this post Link to post Share on other sites
footprint 0 Report post Posted March 24, 2011 hi joyousonline, mine smaller than urs, so renovation will be faster.. but urs so much more spacious! looking fwd for your updates and progress.. Share this post Link to post Share on other sites
jimz33 0 Report post Posted March 27, 2011 Hi all i just got my keys for jade spring. My ID quote for hacking wall $480, PE $500, supply labour & materials for floor touch up $800. Is the above expensive??? Anyone can share how much they paid for hacking wall + PE + floor touch up? Thks. Share this post Link to post Share on other sites
footprint 0 Report post Posted March 28, 2011 if all in all is $800, sounds normal. if solely floor touch up (which i presume is make good the wall) requires $800, its ex. But of coz, if the touching up is alot more work (such as close one opening, open another entrance etc ) then might be ?? hmm.. Mine PE $500... hack and make good the wall $260 ... but mine only half-wall. Share this post Link to post Share on other sites
Sherlyn 0 Report post Posted March 28, 2011 Hi Jade Spring member , Need help for site plan for FSM . Please PM me at sz_zps@yahoo.com.sg thank alot Share this post Link to post Share on other sites
footprint 0 Report post Posted March 31, 2011 Hi Jade Spring member , Need help for site plan for FSM . Please PM me at sz_zps@yahoo.com.sg thank alot Hi Sherlyn, what site plan are you referring to? If floor plan, its on the first page in which you will have it too. Share this post Link to post Share on other sites
footprint 0 Report post Posted March 31, 2011 Abit lazy to update, plus no one reads or comment. But still, since start, shall update one or two photos of the progress ba. Day 29 (29 Mar): Light be! Pretty cove light (its warm light yet don't look overly warm. Just nice) They delivered my laminates as well. So that wednesday can get it up. Zebrano, Supreme... Day 30 (30 Mar): Laminates up! photos are grainy as taken at night using iphone. The separator .. From here, the laminates looks darker. Love it! Share this post Link to post Share on other sites
chrissyyeo 0 Report post Posted March 31, 2011 ur reno progressing well ya. soon can move in le. envy... the separator is the skirting? Share this post Link to post Share on other sites
footprint 0 Report post Posted March 31, 2011 chrissyyeo, hmm.. not sure le. skirting is thicker at the side though. Share this post Link to post Share on other sites
chrissyyeo 0 Report post Posted March 31, 2011 (edited) oh. in this case, the separator is at the door? separates from the homogenous tiles? by the way, how much is the haulage fees charged by HDB? 1 of the ID we met told me it's abt $950?? Edited March 31, 2011 by chrissyyeo Share this post Link to post Share on other sites
footprint 0 Report post Posted March 31, 2011 chrissyyeo, yup yup.. Share this post Link to post Share on other sites
footprint 0 Report post Posted March 31, 2011 Just receive sms that service yard can have 3-track windows! Yeah! Previously was only able to do a two-track as the top and bottom width is different. 2-track would means at any time, half-of-windows will be covered, which means reduced airflow. But now means only 1/3 is covered which is acceptable. Also, as my Id say, having a window in a way make the service yard part of the house, and helps to prevent rain from coming in. (My kitchen faces the carpark, thus in a way no blockage, thus higher chance of rain comes in) Share this post Link to post Share on other sites
May_dream1 14 Report post Posted March 31, 2011 very good progress!!! Share this post Link to post Share on other sites