noobsea 0 Report post Posted April 29, 2011 (edited) And the renovations will be kicking off on 3rd May.Have just received the reno permit from HDB. Now I'm feeling excited again!!Shall drop by on next Tuesday's lunch time to check out my "war-zone".Till then, I will take more photos then upload over here. It's so bored to read just mainly words.. Edited April 29, 2011 by noobsea Share this post Link to post Share on other sites
Kobelala 8 Report post Posted April 29, 2011 Sure, thanks for your help.Just visited your t-blog. Love your MBR toilet wall tiles =) nice!Thanks for visiting Noobsea And the renovations will be kicking off on 3rd May.Have just received the reno permit from HDB. Now I'm feeling excited again!!Shall drop by on next Tuesday's lunch time to check out my "war-zone".Till then, I will take more photos then upload over here. It's so bored to read just mainly words..Congrats ! Wish u a smooth Reno Journey and yes, do upload all your pics, starting from "War Zone" period Share this post Link to post Share on other sites
noobsea 0 Report post Posted May 3, 2011 Oh man. Wanna upload photos but don't know why cannot.Went up to my house just now. 2 hackers, having lunch. Went in to see see look look. They're done with hacking common toilet and half of the kitchen floor tiles. Tomorrow, 4 more hackers gonna join in the force. Can anyone teach me how to upload a photo properly? I always have problems when I wanna upload. =(Thanks in advance. Share this post Link to post Share on other sites
Wenx 0 Report post Posted May 3, 2011 Dear helpful people out there, would actually need feedback for Cellini. Anybody would like to share their experiences with Cellini? Much appreciate.thank you!Just bought my sofa and bed from cellini last week... the sales guy at loyang is very helpful and good... i got some great deals from him... Share this post Link to post Share on other sites
noobsea 0 Report post Posted May 5, 2011 (edited) Drop by on the 1st day of hacking because I couldn't stop worrying if everything's going well.Here's what I saw.Day 1 - Hacked off the common toilet floor tiles.Day 1 - Hacked off kitchen floor tiles. Edited May 5, 2011 by noobsea Share this post Link to post Share on other sites
Kobelala 8 Report post Posted May 5, 2011 Drop by on the 1st day of hacking because I couldn't stop worrying if everything's going well.Here's what I saw.I Like to see War Zone Pics Share this post Link to post Share on other sites
noobsea 0 Report post Posted May 5, 2011 Drop by again on the 2nd day with Hubby during lunch. Total of 6 hackers.So far, progressing well with the hackings.Kitchen wall tiles almost gone.Gotten the permit to hack off the wall. After the wall was hacked, my living room looks even spacious! *He's inspecting the common toilet and kept asking if the tiles are all over, how the hackers do their business* LOL!Another view of the kitchenMBR toilet floor hacked!They should be done by today. Hubby dropped by just now and updated me that almost all hacking done. Tomorrow will be tiling day.I need to be there to make sure they do a good job =) Share this post Link to post Share on other sites
noobsea 0 Report post Posted May 5, 2011 I Like to see War Zone Pics Oh man, you're fast!Ya, when we dropped by last evening, IT IS LITERALLY WAR ZONE!All the debris here and there! Very scare got cockroaches!! LOL! Share this post Link to post Share on other sites
noobsea 0 Report post Posted May 16, 2011 After disappearing for quite some time. Here's the updates on the house.Didn't manage to take much pictures because it was so dusty that I don't feel like stepping in.=( Share this post Link to post Share on other sites
noobsea 0 Report post Posted May 16, 2011 (edited) Kitchen Wall tiles up & floor tilesFixing the last part of tiles in kitchen. Edited May 16, 2011 by noobsea Share this post Link to post Share on other sites
noobsea 0 Report post Posted May 16, 2011 Continue from last post. Didn't know cannot exceed more than the maximun images.Living room tiles, half done.Living room tiles, all done up. (Sorry for the bad lighting) Share this post Link to post Share on other sites
noobsea 0 Report post Posted May 16, 2011 MBR ToiletProtruding 10cm ledge in MBR toilet for shampoos. (Toilet so squeezy!!!)Common ToiletHardly can take any pictures on the tiles now because they have alrdy covered up with protection sheets.This week's schedule is hopefully, plaster, electrics and plumbing.Gotta lots of stuffs over the weekend. Total Damage as of today: $9k plus and still counting.$1k on Hansgrohe and Grohe's bathroom accessories plus 2 sink tap.$1.5k on WC, Basin, Rinnai hob, Joven water storage tank (35L) and kitchen sink.$4k on Royal Excelsior mattress, tv console and L shape sofa.$2550 on Mitsubshi Heavy Industries inverter system 3.Still lack of dining table, my girl's bed frame mattress (Most headache part because can't find any suitable).Really so tired la! Share this post Link to post Share on other sites
Kobelala 8 Report post Posted May 16, 2011 $1k on Hansgrohe and Grohe's bathroom accessories plus 2 sink tap.Good choice Share this post Link to post Share on other sites