cardin 0 Report post Posted December 22, 2010 Hi, am in the midst of looking for an electrician for my place and was being reccomended by my ID. Not sure whether it is expensive but it sure seems not cheap to me, maybe more experience forummers can advice? Thanks RE : QUOTATION FOR ELECTRICAL WORKS (H.D.B WRIING) We are please to submitt our quotation for the above-mentioned. U/Pirce 1) To supply & install lighting & fan points $30.00 per no. 2) To supply & install 13A single sockets $55.00 per no. 3) To supply & install 13A double sockets $70.00 per no. 4) To supply & install 20A heater switch $100.00 per no. 5) To supply & install 15A aircon point $100.00 per no. 6) To supply & install 2 way heater c/w 20A Isolator $280.00 per no. 7) To supply install 2 way light switch $50.00 per no. 8) To supply & install normal dimmer switch $40.00 per no. 9) To supply & install telephone point $50.00 per no. 10) To supply & install SCV point $110.00 per no. 11) To supply & install switch for hood, oven, microwave & cooker $80.00 per no. 12) To supply & install door bell point $60.00 per no. 13) To supply labour to install light fitting $15.00 per no. 14) To supply labour to install celing fan $50.00 per no. 15) To supply & install DB Box (12 way to 14 way) $350.00 per no. To supply & install DB Box (16 way to 18 way) $450.00 per no. To supply & install DB Box (20 way to 22 way) $550.00 per no. Share this post Link to post Share on other sites
Soichiro 0 Report post Posted December 22, 2010 A tad expensive if you work with him directly. The most important parts would be the items that you would have MANY of. Esp the 13A single or double sockets. You can easily have 20 of those around the house, depending on size. If you're really unsure, just get quotes from 3 different electricians and compare. Quotes are quite standard, easy to compare. Share this post Link to post Share on other sites
MVES 0 Report post Posted January 13, 2011 Hi, am in the midst of looking for an electrician for my place and was being reccomended by my ID. Not sure whether it is expensive but it sure seems not cheap to me, maybe more experience forummers can advice? Thanks RE : QUOTATION FOR ELECTRICAL WORKS (H.D.B WRIING) We are please to submitt our quotation for the above-mentioned. U/Pirce 1) To supply & install lighting & fan points $30.00 per no. 2) To supply & install 13A single sockets $55.00 per no. 3) To supply & install 13A double sockets $70.00 per no. 4) To supply & install 20A heater switch $100.00 per no. 5) To supply & install 15A aircon point $100.00 per no. 6) To supply & install 2 way heater c/w 20A Isolator $280.00 per no. 7) To supply install 2 way light switch $50.00 per no. 8) To supply & install normal dimmer switch $40.00 per no. 9) To supply & install telephone point $50.00 per no. 10) To supply & install SCV point $110.00 per no. 11) To supply & install switch for hood, oven, microwave & cooker $80.00 per no. 12) To supply & install door bell point $60.00 per no. 13) To supply labour to install light fitting $15.00 per no. 14) To supply labour to install celing fan $50.00 per no. 15) To supply & install DB Box (12 way to 14 way) $350.00 per no. To supply & install DB Box (16 way to 18 way) $450.00 per no. To supply & install DB Box (20 way to 22 way) $550.00 per no. Hi, Basically you do not need to pay that much as I find your contractor has been over charging on the price. Maybe you can contact me at 97327439 or multiversed.engrg.svcs@gmail.com for more details. I will explain more when we converse over the phone or thru the email. Regards, Velton Share this post Link to post Share on other sites
dev 1 Report post Posted May 3, 2011 (edited) I got the following quote:Wiring + switches (for 16 downlight + 6 Clipsal switches):$450Install PLC Light: $10eaFan cw lights installation: $40ea20amp:$120Extend SCV Pt: $80Extend 1 power pt: $30Change switch: $25Install of other dangling or normal light:$15-25 eaAll switches( clipsal) provided but not a licensed electrician. Any feedback on the pricing? Can i go ahead if he is not a licensed elec.?? Edited May 3, 2011 by dev Share this post Link to post Share on other sites