tecklok 0 Report post Posted November 19, 2010 Hi Can someone advise whether the below quote is expensive? 1) 1 x DB Box 2) 40 x light point 3) 25 x power point 4) 4 x scv point 5) 4 x phone point 6) 2 x water heater point 7) 1 x aircon point 8) 1 lot of installation of light fitting ID quoted a lump sum of $4700 Thanks Share this post Link to post Share on other sites
suver 0 Report post Posted November 19, 2010 Hi Can someone advise whether the below quote is expensive? 1) 1 x DB Box 2) 40 x light point 3) 25 x power point 4) 4 x scv point 5) 4 x phone point 6) 2 x water heater point 7) 1 x aircon point 8) 1 lot of installation of light fitting ID quoted a lump sum of $4700 Thanks Any conceal work? If so, seems reasonable to me. My DB 2 pole 63AMP (single phrase) 36 way itself already cost $650. How much is yours? Share this post Link to post Share on other sites
tecklok 0 Report post Posted December 3, 2010 Any conceal work? If so, seems reasonable to me. My DB 2 pole 63AMP (single phrase) 36 way itself already cost $650. How much is yours? Hi I'm not too sure as the contractor give as one lump sum and do not give me the breakdown. I have send the same specs to another website and they quote me $3500 Share this post Link to post Share on other sites