jolyn1374 0 Report post Posted November 15, 2010 hi, i'm doing hacking & tiling work for my 3 bedrooms & both toilets floor + wall for a normal 4-rm flat. can anyone advise how much time is needed for these tiling work to complete? cos we are in a rush to shift in early.... thanks! Share this post Link to post Share on other sites