user123 5 Report post Posted October 27, 2010 if I'm quoted say, $35 for a new point for downlight, does this price usually inclusive of fixing the light after the false ceiling have been done or will there be an extra $10 for fixing just the light up? Means $35 + $10 = $45? Anyone can share? Share this post Link to post Share on other sites
mel77 1 Report post Posted October 27, 2010 if I'm quoted say, $35 for a new point for downlight, does this price usually inclusive of fixing the light after the false ceiling have been done or will there be an extra $10 for fixing just the light up? Means $35 + $10 = $45? Anyone can share? My quote was $35 for electrcial point and $8 for installation. But i think there is room for nego on the electrical point. (my guess is $28 is doable) Installation of $8 is reasonable. But if you have a lot of points, then do a lump sum nego with the electrician. I did that with my electrician the last time. Now also working out this details for my new place. Share this post Link to post Share on other sites
therat 18 Report post Posted October 27, 2010 exclude. Install new electrical point is one cost Install light is another cost. My electrician charge me $10 to install the light Share this post Link to post Share on other sites
user123 5 Report post Posted October 27, 2010 exclude. Install new electrical point is one cost Install light is another cost. My electrician charge me $10 to install the light oh ok... Share this post Link to post Share on other sites
user123 5 Report post Posted October 27, 2010 Between, is it common to charge looping as a new light point? Even the light just next to another, two electricians quoted me as new point which I think it's unfair as the cable is so short and the 2nd and 3rd light are sharing the same line... Share this post Link to post Share on other sites
Andrew New 3 Report post Posted October 28, 2010 Between, is it common to charge looping as a new light point? Even the light just next to another, two electricians quoted me as new point which I think it's unfair as the cable is so short and the 2nd and 3rd light are sharing the same line... Many electricians are charging looping as a new light point ! Share this post Link to post Share on other sites
mel77 1 Report post Posted October 29, 2010 Many electricians are charging looping as a new light point ! What is Looping? Pardon my ignorance..... Share this post Link to post Share on other sites
bepgof 20 Report post Posted October 29, 2010 (edited) Between, is it common to charge looping as a new light point? Even the light just next to another, two electricians quoted me as new point which I think it's unfair as the cable is so short and the 2nd and 3rd light are sharing the same line... - Any "point", as long as it is a "new point", whether tapped from adjacent power, or, pull cable from DB, it is charged at a "point" price. - Lighting point charge at $A/per point - Light installation charge at $B/per ligting - Light control switch (1, 2,3,4 5,..gangs) charge st $C/per group - Note: Price for different brand of control switches, varies a lot. - Ceiling fan installation at $D/per fan - TV/SCV point (single, double socket)different pricing - Lan point, mounting plate..... - Power point(1 gang) at $A/per point - 2 gang at $B/per point, 2 gang $C/per point, so on so far - Heater point at $D/per point, switch seperate charge. Edited October 29, 2010 by bepgof Share this post Link to post Share on other sites