Laying of gas piping (from outlet to kitchen cabinet) must be done by SP or can be done by any contractor?

must be done by SP. even linking to hob also must be done by them. they will then do a leakage test before turning on supply

 

Share this post


Link to post
Share on other sites
must be done by SP. even linking to hob also must be done by them. they will then do a leakage test before turning on supply

OIC, does that means they would have to make 2 tips;

e.g reconfigure the piping, then linking to the the hob?

 

Share this post


Link to post
Share on other sites
OIC, does that means they would have to make 2 tips;

e.g reconfigure the piping, then linking to the the hob?

Yes, if they got to relocate the gas-meter to outside and connect the supply, it has to be 2 trips involved. must be done by citygas appointed contractor.

 

Share this post


Link to post
Share on other sites
Yes, if they got to relocate the gas-meter to outside and connect the supply, it has to be 2 trips involved. must be done by citygas appointed contractor.

Who will make appt with CityGas contractor to do the piping? owner or kitchen cabinet contractor? cos I don't have a general contractor

 

Share this post


Link to post
Share on other sites
Who will make appt with CityGas contractor to do the piping? owner or kitchen cabinet contractor? cos I don't have a general contractor

of coz it's you.

 

Share this post


Link to post
Share on other sites
oh ok... I can make appointment way before the cabinet is fixed as long as I know where the stove will be located, right?

not u can...its u must.

piping must be done before cabinet is fixed up.

 

Share this post


Link to post
Share on other sites
not u can...its u must.

piping must be done before cabinet is fixed up.

Copper pipe prices are quite high now, so be prepared to pay more for materials…

 

Share this post


Link to post
Share on other sites

they nvr charge me for materials leh. just a fixed cost for installation. and another for activation. all paid when i got my 1st bill

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×