user123 5 Report post Posted October 22, 2010 Laying of gas piping (from outlet to kitchen cabinet) must be done by SP or can be done by any contractor? Share this post Link to post Share on other sites
wolflet 1 Report post Posted October 22, 2010 Laying of gas piping (from outlet to kitchen cabinet) must be done by SP or can be done by any contractor? must be done by SP. even linking to hob also must be done by them. they will then do a leakage test before turning on supply Share this post Link to post Share on other sites
dexufto 5 Report post Posted October 22, 2010 must be done by SP. even linking to hob also must be done by them. they will then do a leakage test before turning on supply OIC, does that means they would have to make 2 tips; e.g reconfigure the piping, then linking to the the hob? Share this post Link to post Share on other sites
neubie 2 Report post Posted October 22, 2010 OIC, does that means they would have to make 2 tips; e.g reconfigure the piping, then linking to the the hob? Yes, if they got to relocate the gas-meter to outside and connect the supply, it has to be 2 trips involved. must be done by citygas appointed contractor. Share this post Link to post Share on other sites
user123 5 Report post Posted October 22, 2010 Yes, if they got to relocate the gas-meter to outside and connect the supply, it has to be 2 trips involved. must be done by citygas appointed contractor. Who will make appt with CityGas contractor to do the piping? owner or kitchen cabinet contractor? cos I don't have a general contractor Share this post Link to post Share on other sites
hihihi 0 Report post Posted October 22, 2010 Who will make appt with CityGas contractor to do the piping? owner or kitchen cabinet contractor? cos I don't have a general contractor of coz it's you. Share this post Link to post Share on other sites
user123 5 Report post Posted October 22, 2010 of coz it's you. oh ok... I can make appointment way before the cabinet is fixed as long as I know where the stove will be located, right? Share this post Link to post Share on other sites
gimz63251073 0 Report post Posted October 22, 2010 oh ok... I can make appointment way before the cabinet is fixed as long as I know where the stove will be located, right? not u can...its u must. piping must be done before cabinet is fixed up. Share this post Link to post Share on other sites
neubie 2 Report post Posted October 22, 2010 not u can...its u must. piping must be done before cabinet is fixed up. Copper pipe prices are quite high now, so be prepared to pay more for materials… Share this post Link to post Share on other sites
user123 5 Report post Posted October 22, 2010 not u can...its u must. piping must be done before cabinet is fixed up. okie... thanks Share this post Link to post Share on other sites
wolflet 1 Report post Posted October 22, 2010 they nvr charge me for materials leh. just a fixed cost for installation. and another for activation. all paid when i got my 1st bill Share this post Link to post Share on other sites
Warrior88 0 Report post Posted October 22, 2010 If pipe leaks during the 2nd trip, finger point time. Kitchen cabinet > box up > electrician > SP > ID ... then dunno Share this post Link to post Share on other sites