istel

Yet Another 3rm In Tpy

Recommended Posts

Updated with my proposed floor plan, expecting changes to happen but hopefully it'll not deviate too much from what I've planned...

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Here are some of the "inspirations" that I had while searching the net... haha...

emptybottomsolidtop.th.jpg

If possible, I would like to do this for my L kitchen... However do the bros here think it's feasible? I wonder if it costs a bomb to customize the solid top... :/

straightkitchen.th.jpg

If the above idea is a no go... I would like to do this instead...

plannedkitchen.th.gif

This might be one of the plan to save costs on the kitchen cabinets. Customize the kitchen cabinet on one side of the wall and get an Ikea shelf for the other side...

... limit of 5 pics per post is really quite irritating... haiz...

 

Share this post


Link to post
Share on other sites

condimentsstore.th.jpg

Hope to include this condiments shelf into the kitchen cabinet design although I would not put it so near the oven...

flipopenshelf.jpg

For the top kitchen cabinet shelf... You think the carpenters can do it?

washingbasin.jpg

Not sure if I have enough space in the shower room to do the shelving for my vanity sink...

Edited by istel
 

Share this post


Link to post
Share on other sites
Here are some of the "inspirations" that I had while searching the net... haha...

emptybottomsolidtop.th.jpg

If possible, I would like to do this for my L kitchen... However do the bros here think it's feasible? I wonder if it costs a bomb to customize the solid top... :/

if not wrong this design is rather dated, offers no pratical usage apart for putting things at tabletop.

straightkitchen.th.jpg

If the above idea is a no go... I would like to do this instead...

plannedkitchen.th.gif

This might be one of the plan to save costs on the kitchen cabinets. Customize the kitchen cabinet on one side of the wall and get an Ikea shelf for the other side...

... limit of 5 pics per post is really quite irritating... haiz...

first, decide how are u going to use the storage and how much storage space u need. if u dun need so much space, can just settle with the bottom cabinet and forego the top cabinet. that should save some costs for not doing the upper cabinet.

solid top is charged at 70+ psf. alternatively u can build the bottom cabinet using concrete support with homogeneous tiles as solidtop, durability confirmed outlast wood cabinet. but design looks dated though.

 

Share this post


Link to post
Share on other sites
flipopenshelf.jpg

For the top kitchen cabinet shelf... You think the carpenters can do it?

yes, can do, but may be more exp due to the telescopic arm mechanism, initially i wanted to do up Blum Aventos system for my dish rack, but the price of the lift mechanism was 160+, so settled for telescopic hydraulic arm.

washingbasin.jpg

Not sure if I have enough space in the shower room to do the shelving for my vanity sink...

look closely again, the washbasin is some distance away from the shower area. anyway, the idea of shelving under sink is not maximised becos the shelves need to make way for the drainage pipe and bottle-trap, so might as well dun put.

 

Share this post


Link to post
Share on other sites
if not wrong this design is rather dated, offers no pratical usage apart for putting things at tabletop.

Yeah, it's just to save the kitchen cabinet length... Save one foot cost? lol...

first, decide how are u going to use the storage and how much storage space u need. if u dun need so much space, can just settle with the bottom cabinet and forego the top cabinet. that should save some costs for not doing the upper cabinet.

Am discussing with various contractors... Some were saying if don't do top then have to do box up for the piping and electric cables...

solid top is charged at 70+ psf. alternatively u can build the bottom cabinet using concrete support with homogeneous tiles as solidtop, durability confirmed outlast wood cabinet. but design looks dated though.

Yeah... I know what you mean, saw those concrete cabinets before when I was still house hunting, the agent was telling me can put granite top somemore with the concrete support

yes, can do, but may be more exp due to the telescopic arm mechanism, initially i wanted to do up Blum Aventos system for my dish rack, but the price of the lift mechanism was 160+, so settled for telescopic hydraulic arm.

$160 is quite reasonable liaoz bro, the ones I talked to quoted me $300...

look closely again, the washbasin is some distance away from the shower area. anyway, the idea of shelving under sink is not maximised becos the shelves need to make way for the drainage pipe and bottle-trap, so might as well dun put.

Yeah... Not enough space to implement I guess... sigh...

 

Share this post


Link to post
Share on other sites

Here's one of the quotes from my short listed contractors...

Bros around here any idea if any VO is missing from this list?

This quote overshot my planned budget by 10k -_-;

Although, I'm planning to take out the glass partition, new doors, outsource laminates and aircon...

Seems like it's still no where near 20k, the amount that I could still stomach...

HACKING

HACKING OF EXISTING SKIRTING FOR LIVING HALL AND 2 BEDROOMS

HACKING OF EXISTING WALL TILES FOR KITCHEN AND WC AND BATHROOM

HACKING OF EXISTING TOILET FITTING, SINK AND STOVE SUPPORTS

480

HACKING OF NEW ENTRANCE BETWEEN BATHROOM AND BEDROOM

HACKING OF 1/2 WALL BETWEEN BATHROOM AND TOILET

HACKING OF EXISTING WALL BETWEEN KITCHEN AND LIVING HALL

DISMANTLE AND DISPOSAL OF EXISTING KITCHEN CABINET, WARDROBE AND CEILING CORNICES

980

LIVING HALL AND 2 BEDROOMS

SUPPLY/OVERLAY LAMINATED FLOORING WITH SKIRTING FOR LIVING HALL & 2 BEDROOMS

1790

SUPPLY/CONSTRUCT TILES FOR ENTRANCE KERB

150

LIVING HALL: SUPPLY/CONSTRUCT L-BOX FOR LIVING HALL

480

LVING HALL: SUPPLY/LAY 12NOS. LIGHTING POINTS AND LABOUR TO INSTALL 12 NOS. PLC LIGHTS

516

SUPPLY/INSTALL ALUMNIUM GRILLES FOR LIVING HALL AND COMMON BEDROOM

280

SUPPLY/INSTALL 2 NOS. CLASSIC DOOR2 C/W LOCK SET FOR BOTH BEDROOMS

440

Utility

SUPPLY/INSTALL 1 NOS. CLASSIC DOOR C/W LOCK SET FOR UTILITY

220

SUPPLY/OVERLAY FLOOR TILES FOR UTILITY (<$3PSF)

350

KITCHEN

SUPPLY/CONSTRUCT CERAMIC/HOMOGENEOUS FLOOR TILES FOR KITCHEN (<$3PSF)

980

WATERPROOFING FOR KITCHEN

250

SUPPLY/CONSTRUCT FULL HEIGHT WALL TILES FOR KITCHEN (EXCLUDE CABINET AREA)<$2.70PSF

1,950

CONSTRUCTION OF FRIDGE, WASHING MACHINE AND CABINET BASES

450

SUPPLY/INSTALL 1 NO. SLIDING DOOR AND 2 NOS. FIXED PANELS AT KITCHEN ENTRANCE (10MM TEMPERED GLASS)

1,480

TO RUN OUTLET PIPING FOR WASHING MACHINE AND SINK

90

REPLACEMENT OF RUBBISH CHUTE (NEW MODEL C/W FRAME/FLUSH TO WALL)

250

SUPPLY/INSTALL A PAIR OF BAMBOO STICK HOLDERS

40

SUPPLY/INSTALL SOILD LAMINATED KITCHEN CABINET (TOP/BOTTOM=30FT)(INCLUDE STAINLESS STEEL DISHRACK, 2 GLASS PANELS, DESIGN HANDLES AND CUTLERY TRAY)

3,000

SUPPLY/INSTALL SOLID SURFACE TOP FOR KITCHEN CABINET (16FT)

1,280

SUPPLY LABOUR TO INSTALL COOKER HOOD, HOB, OVEN, SINK & TAP

50

SUPPLY/CONSTRUCT FALSE BEAM TO SUPPORT TEMPERED GLASS PANELS FOR KITCHEN ENTRANCE

180

TO MAKE GOOD ON AFFECTED AREA AFTER DEMOLITION OF WALL BETWEEN LIVING AND KITCHEN

150

SUPPLY/INSTALL SOFT CLOSING FOR ALL KITCHEN CABINET DOORS AND 4 DRAWERS

480

BATHROOM AND TOILET

SUPPLY/CONSTRUCT NON-SLIP FLOOR TILES

680

WATERPROOFING TO BE CARRIED OUT

200

SUPPLY/CONSTRUCT FULL HEIGHT WALL TILES FOR WC AND BATHROOM (<$2.70 psf)

1,580

SUPPLY LABOUR TO INSTALL 1 NO. TOILET BOWL AND BASIN

180

SUPPLY/INSTALL 1 NO. SLIDING DOOR BETWEEN BATHROOM AND TOILET

290

SUPPLY/INSTALL 2 SETS OF ALUMINIUM/ACRYLIC BI-FOLD DOORS FOR WC AND BATHROOM

520

SUPPLY LABOUR TO INSTALL TOILET ACCESSORIES PURCHASED BY OWNER

40

SUPPLY LABOUR TO INSTALL 1 NO. INSTANT WATER HEATER

40

REPLACEMENT OF EXISTING WINDOW TO ADJUSTABLE TYPE AS PROPOSED

450

TO SEAL UP EXISTING ENTRANCE FOR BATHROOM WITH HOLLOW BLOCKS

320

WHOLE HOUSE AND GENERAL

REPLACEMENT OF KITCHEN, WC AND BATHROOM EXISTING PIPES TO STAINLESS STEEL

690

7 SINGLE PWR PT=$350 ,7 DOUBLE PWR PT=$420 ,10 LIGHTING PT=$450

1220

1 A/C & 1 HEATER PT=$200 ,10 INSTALL LIGHT=$80 ,1 SCV=$100 ,2 TEL=$110 ,DISTRIBUTION BOARD=$280

770

PLASTERING OF WHOLE HOUSE WALLS AND CEILINGS

1350

PAINTING OF WHOLE HOUSE WALLS/CEILINGS WITH ICI PENTALITE OR NIPPON 5000(5 + 1 WHITE FOR CEILINGS) AND PAINTING OF DOOR FRAMES,PIPINGS AND GATE

880

SUPPLY/INSTALL 1 NO. WROUGHT IRON MAIN GATE C/W LOCK

480

SUPPLY/INSTALL 1 NO. SOLID MAIN DOOR C/W LOCK (NON FIRE RATED)AND VARNISHING

550

DEBRIS REMOVAL SERVICES TO BE CARRIED OUT

480

HAULAGE OF SAND TO BE CARRIED OUT

680

PATCH OF WIRE TRUNKING SHADOW AFTER REMOVED OLD ONE & PATCHING OF NEW WIRE TRUNKING GAPS

180

CHEMICAL WASHING FOR WHOLE HOUSE

90
 

Share this post


Link to post
Share on other sites

this quote looks like a contractor's quote, rather than an ID's.

also, the electrical part....definitely way too ex, in my opinion. works out to $50 for a single 13A, $60 for a double 13A, A/C and Heater $100 each?

And the lighting points and labour for lights installation is inconsistent. under the "General Works", labour for lights installation is $8 per light, and each lighting point costs $45. But in the "Living" portion, 12 lights and lighting points add up to 516. Assuming same labour charge of $8/lights for installation, den each lighting point here works out to be $35 per point. That's a difference of $10 per lighting point!

Moreover, at $35 per lighting point, it's oredi expensive. $30/point is more like the average though there are cheaper ones if u search hard enough.

Chemical wash also charging u? den is he gg to use protection paper for ur flooring during the carpentry phase? cos no mention of it. is he gg to charge u for the protection paper?

Living L-box for 480? how big is the L-box?

and every little thing to do wif labour he also charging u. labour to install this and that. tt's where the extra came frm.

u didnt say hw big is the floor area for the laminates. this one u might find a cheaper quote if u out-source. i knw i did.

Having said that, ur budget of 20k for a whole house overhaul is a bit on the low side. Even though u didn hack most of ur flooring, it still wun add up much to it. hacking work is cheap compared to the rest of reno works.

 

Share this post


Link to post
Share on other sites
I've planned for a budget around 16K for the activities above... I would hope if the bros and sisters in this forum find it doable?

Activities that I would like to do outside the renovation budget that I've listed above are:

- Replace all the doors currently in the house as well as the front gate

- Glass partition to separate the kitchen from the living room as the wall linking the kitchen to living has been hacked down by previous owner

think for these 2 items, it'll be easier for ur budgeting, financial control and accounting if u include them in ur reno works for the 16k. Things tt are done by ID/contractor shld be lumped into 1 budget, wif separate budgets for those items tt u intend to out-source.

when i was doing my budgeting, i also separated a lot of things, den along the way, combined some, and den as i started out-sourcing, separated them again, and as my reno is currently underway, the numbers showed tt i've saved quite a bit and managed to get quite a bit done wif my limited budget too.

Edited by manutd1972
 

Share this post


Link to post
Share on other sites
this quote looks like a contractor's quote, rather than an ID's.

also, the electrical part....definitely way too ex, in my opinion. works out to $50 for a single 13A, $60 for a double 13A, A/C and Heater $100 each?

And the lighting points and labour for lights installation is inconsistent. under the "General Works", labour for lights installation is $8 per light, and each lighting point costs $45. But in the "Living" portion, 12 lights and lighting points add up to 516. Assuming same labour charge of $8/lights for installation, den each lighting point here works out to be $35 per point. That's a difference of $10 per lighting point!

Moreover, at $35 per lighting point, it's oredi expensive. $30/point is more like the average though there are cheaper ones if u search hard enough.

Chemical wash also charging u? den is he gg to use protection paper for ur flooring during the carpentry phase? cos no mention of it. is he gg to charge u for the protection paper?

Living L-box for 480? how big is the L-box?

and every little thing to do wif labour he also charging u. labour to install this and that. tt's where the extra came frm.

u didnt say hw big is the floor area for the laminates. this one u might find a cheaper quote if u out-source. i knw i did.

Having said that, ur budget of 20k for a whole house overhaul is a bit on the low side. Even though u didn hack most of ur flooring, it still wun add up much to it. hacking work is cheap compared to the rest of reno works.

Thanks for the heads up bro.

You're right, it's a contractor's quote cause I don't really need a ID I guess...

Electric works part... a couples of other contractors who quoted me are also in the range of around 1.2 to 1.4k...

Should I outsource this portion of work in that case? They told me if outsource to other people, coordinate will result in delay of reno work -_-;;

L-Box is supposed to be size of the living but not confirmed yet...

Is it considered a good thing that he listed out all the labor charge rather than hiding them as hidden cost?

Have to go back to him again to trash out all these issues I guess...

think for these 2 items, it'll be easier for ur budgeting, financial control and accounting if u include them in ur reno works for the 16k. Things tt are done by ID/contractor shld be lumped into 1 budget, wif separate budgets for those items tt u intend to out-source.

when i was doing my budgeting, i also separated a lot of things, den along the way, combined some, and den as i started out-sourcing, separated them again, and as my reno is currently underway, the numbers showed tt i've saved quite a bit and managed to get quite a bit done wif my limited budget too.

I think after some considerations that I'll not go ahead with the glass partition and will just repaint all my existing doors.

I'll still be changing the front gates though but not sure where to find the retro aluminum gate

aluminium%20gate%20lock200.jpg

 

Share this post


Link to post
Share on other sites
Am discussing with various contractors... Some were saying if don't do top then have to do box up for the piping and electric cables...

……

$160 is quite reasonable liaoz bro, the ones I talked to quoted me $300...

Box up of water/gas pipes is not that exp, far cheaper than using cabinets to cover up. Save a little here and there will accumulate into the thousands, whats more u uv a tight budget to begin with.

I suggest u start reviewing the more exp items like wall n floor tiles. Take a measuring tape n sum up the areas that's to be tiled up, add another 10% for wastage n skirting n check if tally with the quotation. I can see some items are cheap (like glass partition), some average (painting n plastering) while others are not. So in the end the cheaper items will hopefully offset out the exp ones n have an overall savings.

If u really wanna outsource some of ur works, make sure u get ur main con for schedule n insert the outsourced work accordingly, making allowance for delays, exigencies, additional costs n other unforeseen issues (like finger pointing when something goes wrong). That's gg to incur u some considerable effort.

Good luck. :)

Edited by neubie
 

Share this post


Link to post
Share on other sites
Thanks for the heads up bro.

You're right, it's a contractor's quote cause I don't really need a ID I guess...

Electric works part... a couples of other contractors who quoted me are also in the range of around 1.2 to 1.4k...

Should I outsource this portion of work in that case? They told me if outsource to other people, coordinate will result in delay of reno work -_-;;

usually tt's the tactic they use to try and keep u from out-sourcing so tt they can earn more frm u. we all knw tt they get commissions frm every sub-con and supplier they engage for each of their projects.

tt's why it's important to get someone who can understand ur budget constraints and is willing to work wif u to maximise it for the benefit of ur home. this way, this ID/contractor would nt mind u out-sourcing when they knw tt the related item is very much more expensive when done thru him. eg, my ID's electrician. turns out to be someone i also knw, and hv engaged b4 in the past many many yrs ago for some trouble-shooting. i had called him months earlier to quote me his charges on the individual items and when he came for a survey wif my ID, fortunately, he didn recognise me and gave me his quote thru my ID. when i saw it, i flipped :jawdrop: . it was so much higher than his direct quote to me. i told my ID abt it honestly and said i was definitely gg to out-source. he agreed and even supported it, knowing my budget was tight.

in terms of coordination wif out-sourced subcons, u either ask assertively (aka demand gently) tt ur contractor deal wif ur subcons, or if no choice, den u'll hv to do the coordination urself. just keep bothering ur contractor by asking him very often when he needs who and wat, den call the respective subcon n arrange. sooner or later, he'll ask u for their direct contacts n call them himself....lol.

L-Box is supposed to be size of the living but not confirmed yet...

Is it considered a good thing that he listed out all the labor charge rather than hiding them as hidden cost?

Have to go back to him again to trash out all these issues I guess...

good or bad, really depends. fact tt he lists them means he's charging u for everything. some dun list, den later charge u. others, dun list, and do it FOC for u as a service. so b4 u sign on the dotted line, ask specifically. but if they're doing it FOC, dun ask them to put it dwn into the contract. some may take it negatively and feel u dun trust them. den, har bez liao...

I think after some considerations that I'll not go ahead with the glass partition and will just repaint all my existing doors.

I'll still be changing the front gates though but not sure where to find the retro aluminum gate

aluminium%20gate%20lock200.jpg

too bad my doors all got thrown away b4 u started this. else u can hv them. my bedroom doors were both still in very good condition. even better than my main door. i thot of using 1 of them to replace my main, but size different. to cut cost, u can as u contemplated, repaint existing doors. nx time when u hv d budget, den replace the doors. same goes wif the main door and main gate. i'm keeping my main door, heavily-scratched as it is. just repaint it lor. my existing gate also very old and in bad shape, but no more budget to change. so keep and use first lor. later aft reno completed den see how lor.

 

Share this post


Link to post
Share on other sites
Hopefully, this is what the floor plan will look like after renovation without furnitures...

Proposed Floorplan v1.1 (With Furnishings, furniture, electric work points)

withfurnishings.jpg

Red Lines for Power socket points

Yellowish Lines for Light switches

Have you considered whom are you engaging for installation of aircon.

Noticed your aircon placement is in series (v1.0) with the rear wall of the bedrooms.. trunking will be an issue.

Would you consider relocating the air-con back to back at the wall (diving the both rooms), it will save the ugly trunking.

Unless you plan to have full-height cabinet at that area (which I don't see at v1.1)

Just a thought ince i'm at the a/c stage of my reno.

Updated with my proposed floor plan, expecting changes to happen but hopefully it'll not deviate too much from what I've planned...
 

Share this post


Link to post
Share on other sites
<reserved for pics of flat after renovation completes>

Hopefully, this is what the floor plan will look like after renovation without furnitures...

Proposed Floorplan v1.0

afterrenovationfloorpla.jpg

Proposed Floorplan v1.1 (With Furnishings, furniture, electric work points)

withfurnishings.jpg

Red Lines for Power socket points

Yellowish Lines for Light switches

the placement of the queen size bed in the MBR will be squeezy for that person sleeping next to the wall to get in and out of bed. so may be better if the bed is placed along the length of the MBR.

placement of wardrobe next to the aircon in the MBR may obstruct the airflow.

can fit that square bathtub into the bathroom meh?

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×