headstomp 0 Report post Posted October 29, 2010 (edited) View From balcony toward living and Family area View from outside the Corridor And Finally Decided on the Kitchen Mixer Edited October 29, 2010 by headstomp Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 1, 2010 Updates.... The goods are here. Kitchen sink,toilet bowl, vanity, toilet accessories. My Huge Sink Bidet Master Bedroom vanity Tap Master bedroom washing basin pipe Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 1, 2010 Toilet Bowl, Washing basin Tiles all done plus skirting Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 1, 2010 Groove for the frosted glass Aircon trunking done for master and daughter room, run via Walk in Wardrobe Share this post Link to post Share on other sites
matashi 1 Report post Posted November 3, 2010 wow very big place! i can make 7 rooms! very shiok! Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 3, 2010 wow very big place! i can make 7 rooms! very shiok! Yes it huge, burnt a big hole...we ever see a house that was partition to eight bedroom during house hunting and owner rent out all to foreign worker. Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 3, 2010 Updates.... Lighting for whole house have arrived... Accessories for Bathroom Tap for Vanity in Master bedroom Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 3, 2010 Vanity wall in Master Bedroom Molding the Sink top Sink top fix on to the base Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 3, 2010 Kitchen Sink Base Groove for frosted Glass Tiles done for the Dryer and Washing Machine Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 3, 2010 (edited) Holes for the Downlight in Living Area Dining Area Downlight Bedroom Downlight Stainless steel skirting for the Kitchen entrance Next updates...plastering and painting job will resume soon, HDB have approve the window for Balcony installation . Carpentry have started work. Fixing of accessories for Toilet will resume. Edited November 3, 2010 by headstomp Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 6, 2010 Kitchen sink surface smoothen Common Bathroom Pipe conceal Master bathroom Pipe conceal Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 6, 2010 Painting Started, first Coat Family Area Living Area Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 6, 2010 Living Area Bedroom 1 and 2 Dinning area & Entrance to Kitchen Share this post Link to post Share on other sites
headstomp 0 Report post Posted November 6, 2010 View of Family area from Balcony Master Bedroom false ceiling Painted View from Family toward Living View from Family Area toward Balcony Share this post Link to post Share on other sites
claireee 0 Report post Posted November 7, 2010 HiHI, Can I check how much your ID charging for design + renovation? Thanks, Claire Share this post Link to post Share on other sites