headstomp 0 Report post Posted October 22, 2010 Toilet wall and floor tiles View of living from the Balcony Share this post Link to post Share on other sites
Banned 1 Report post Posted October 22, 2010 wow.. your reno is so fast! Share this post Link to post Share on other sites
headstomp 0 Report post Posted October 22, 2010 wow.. your reno is so fast! I never expect also. you should have seen how many people working at the same time Share this post Link to post Share on other sites
headstomp 0 Report post Posted October 23, 2010 Updates... Gas pipe provision for CityGas Dryer, the pipe will be box up Location of stove Power point, testing after spraying the backing Share this post Link to post Share on other sites
headstomp 0 Report post Posted October 23, 2010 False ceiling in Family,Living, Dinning, Bedroom 1 & 2 done Backing for Vanity in the progress, behind the vanity will act as a storage area Share this post Link to post Share on other sites
manutd1972 1 Report post Posted October 23, 2010 Updates... Gas pipe provision for CityGas Dryer, the pipe will be box up where did u get the clothes bamboo pole holder? i'm looking for this exact design for my plc. Share this post Link to post Share on other sites
headstomp 0 Report post Posted October 24, 2010 where did u get the clothes bamboo pole holder? i'm looking for this exact design for my plc. This was left off by previous owner,guess it 15 years old now. Share this post Link to post Share on other sites
manutd1972 1 Report post Posted October 24, 2010 This was left off by previous owner,guess it 15 years old now. sigh....seems like cannot find this version anywhere. all the shops i've been to are selling the old, ugly design. simply cannot fit my home's design.... Share this post Link to post Share on other sites
headstomp 0 Report post Posted October 25, 2010 (edited) Updates..... Fridge and Cabinet Base up Living Room floor tiles in progress after all the false ceiling is done, so less chance of the tiles be scratch or dirty The area where the CityGas dryer be hang, recess area cover up Before and after Edited October 25, 2010 by headstomp Share this post Link to post Share on other sites
headstomp 0 Report post Posted October 28, 2010 Updates.... Water piping done to the rest of the home,kitchen, washer machine, both toilet. Washer machine and dryer area before boxing up the recess area. Ugly pipes Share this post Link to post Share on other sites
headstomp 0 Report post Posted October 28, 2010 Continue..Toilet Piping Dining and living floor tiles in progress Share this post Link to post Share on other sites
headstomp 0 Report post Posted October 28, 2010 ID did the height of the living area tiles to be align with Fridge and Cabinet Base. Floor tiles in the Balcony Vanity feature wall in the master Bedroom in Progress Recess area for storage Share this post Link to post Share on other sites
headstomp 0 Report post Posted October 28, 2010 Metal skirting for the door to the entrance of the dining area Wall facing the living area Here how the Kitchen Cabinet will look like Tv console feature wall Share this post Link to post Share on other sites
headstomp 0 Report post Posted October 28, 2010 And now the choosing of material for carpentry We choose the black granite top for kitchen and the white one for Vanity in common toilet and Vanity area. And for the Kitchen Cabinet surface Laminate for the Bedroom, on the right Door for main entrance, Teak Bedrooms Door For the Wardrobe in the 2 Bedrooms, Beige Ash Share this post Link to post Share on other sites
headstomp 0 Report post Posted October 29, 2010 Family Area False Ceiling Finally Box up done Master Bedroom False Ceiling done Skirting entrance to Dining Entrance to living via Balcony Living floor and Fridge Base Level Share this post Link to post Share on other sites