jaskel 2 Report post Posted December 3, 2010 celling works in process Share this post Link to post Share on other sites
cyberpig 0 Report post Posted December 19, 2010 WC installed in both toilets.. Shower screen with sliding door & exhaust fans in both toilets.. Share this post Link to post Share on other sites
cyberpig 0 Report post Posted December 19, 2010 Lights for dinning table Lights for kitchen window Toilet lights Share this post Link to post Share on other sites
cyberpig 0 Report post Posted December 19, 2010 Lights for living room Lights for bedroom (similar to this but with white frame) Share this post Link to post Share on other sites
Ayeaye 0 Report post Posted December 20, 2010 Hi, All tiles was nice selected, mind to share your quote? Pls PM me. Thank u. Share this post Link to post Share on other sites
kor69 0 Report post Posted December 21, 2010 Yay great choices Me still in hospital... Posting via iPhone (hoorah for iTech) Can't wait to see the real stuff Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted December 21, 2010 kor69, wat happened to u? Get well soon! Share this post Link to post Share on other sites
Ayeaye 0 Report post Posted December 21, 2010 Take care Share this post Link to post Share on other sites
cyberpig 0 Report post Posted December 31, 2010 Fish tank cabinet New circuit breaker installed Share this post Link to post Share on other sites
cyberpig 0 Report post Posted December 31, 2010 Installation of down lights Painting in progress... First up.. master bedroom : 2 tones of blue (the lighter shade look a little greenish).. Share this post Link to post Share on other sites