kaijia 0 Report post Posted October 17, 2010 (edited) Balcony: Future Master Bathroom: Toilet (Lower Flr): i realise i din take a pic of the future common bathroom (current master bath)... hehe. hehe. juz took a pic of the future common bathroom (current master bath) when i drop by the hse. that's all for the before pics! oh... cant wait for the reno to start tmr! Edited October 18, 2010 by kaijia Share this post Link to post Share on other sites
kaijia 0 Report post Posted October 17, 2010 Anyone with contacts to good movers? hehe. The one i previously signed up with is packed on the day my geomancer advise me to move. got to get another mover. any gd recommendation? will also need to get quote to change my main door & grilles. anyone to recommend? cheers. Share this post Link to post Share on other sites
freshpoison77 0 Report post Posted October 18, 2010 Good luck on your reno... Share this post Link to post Share on other sites
kaijia 0 Report post Posted October 18, 2010 Good luck on your reno... thank u!! i hope everything will go on smoothly. Share this post Link to post Share on other sites
kaijia 0 Report post Posted October 18, 2010 im very happy cos my 2 yrs old daughter love our new place, esp the stairs. typical kid. lolx!! Hacking work juz kicked off! HUAT AR!!! lolx!! ok... tat was so auntie. keeping my fingers crossed that everything will go on smoothly from here. cheers. Share this post Link to post Share on other sites
RimBlock 0 Report post Posted October 18, 2010 Congrats One irritating lady out (can afford a maid but cannot afford movers). One group of workers in for hacking. Win-win Getting itchy feet to get in to my new place what with you and freshpoison77 both getting your EM keys already . RB Share this post Link to post Share on other sites
kaijia 0 Report post Posted October 19, 2010 (edited) Congrats One irritating lady out (can afford a maid but cannot afford movers). One group of workers in for hacking. Win-win Getting itchy feet to get in to my new place what with you and freshpoison77 both getting your EM keys already . RB Lolx!! Yeah! Hope that was the last I'll see of her... Hehe. U'll be getting urs very soon too. Hehe. when's ur 2nd appt? Edited October 19, 2010 by kaijia Share this post Link to post Share on other sites
Leslyn Tan 0 Report post Posted October 19, 2010 Congratulation.. Look forward for your reno picture.. your area at St 72, right ? Share this post Link to post Share on other sites
lynd3ralla 0 Report post Posted October 19, 2010 Hello neigbour, Im in st 71!!..heheee... I realise very few pasir ris residents in renotalk....Anyone else from this territory? Share this post Link to post Share on other sites
kaijia 0 Report post Posted October 19, 2010 Congratulation.. Look forward for your reno picture.. your area at St 72, right ? thanx leslyn. yea, u r rite! how u know mine's at st 72? cheers. Share this post Link to post Share on other sites
kaijia 0 Report post Posted October 19, 2010 Hello neigbour, Im in st 71!!..heheee... I realise very few pasir ris residents in renotalk....Anyone else from this territory? hihi neighbour! *waves back* (ok, tat was lame. ) Share this post Link to post Share on other sites
Leslyn Tan 0 Report post Posted October 19, 2010 thanx leslyn. yea, u r rite! how u know mine's at st 72? cheers. I have passed by and see somebody tear down the thing at your block.. my one is next to your block..(7X5)... Share this post Link to post Share on other sites
kaijia 0 Report post Posted October 19, 2010 I have passed by and see somebody tear down the thing at your block.. my one is next to your block..(7X5)... icic. hahaha!! great to see neighbours here. Share this post Link to post Share on other sites
kaijia 0 Report post Posted October 19, 2010 (edited) went to check on the hse this evening at 6pm... Pics Update! Kitchen Entrance & interior hacked (20% more to go): Wall between master room & corridor hacked (20% completed): Hacking juz started between wall between common Bathroom & Master Bathroom hacked.. Finally, the built-in wardrobe in the kid's room (previously master bedroom) is removed! ... & while i was there, my tiles juz arrived! yea! Kitchen floor tiles : Didnt manage to take pictures of the rest of the tiles cos they were stacked below... looking at the hacking rate, i wonder if we can keep to schedule. hacking works' supposed to be completed tmr. hmm... i reali wonder how this is possible.... Edited April 16, 2011 by kaijia Share this post Link to post Share on other sites
freshpoison77 0 Report post Posted October 19, 2010 My hacking is supposed to be completed tomm too.. Looks like our reno schedule shld be the same. Share this post Link to post Share on other sites