Specialkid 0 Report post Posted September 16, 2010 Happy renovation! Mine is also 4 room and we took abt 4 weeks plus to finish reno. However, certain things go to close 1 eye and rectifications to be done after HO. Basically we hack kitchen, 2 toilets wall and fl tiles. Laminate 2 rooms flooring, L box the whole hse and carpentry wk. Envy those that has completed their renovation and enjoying the* fruits of their labour*, we really missed our own home alot.....even the kids. Lyn Share this post Link to post Share on other sites
Specialkid 0 Report post Posted September 16, 2010 welcome to RT..i luv ur 3D design...cant wait to see the transform.. Skali what you see is not what you get......ahahahaha...but I'm sure my Contractor Willie is a responsible guy, so far 2 of his customers that i know has good relationship with him after the project is completed. I will definitely post more pic, I think it's fun to start this blog and hope for a great ending with nic pics to share Lyn Share this post Link to post Share on other sites
Specialkid 0 Report post Posted September 16, 2010 yay... finally a t-blog with photos that i can see in office... welcome and enjoy your reno journey~ Thanks...I have a hard time figuring out how to post the pic too...but it's really fun. Lyn Share this post Link to post Share on other sites
sgnick 0 Report post Posted September 16, 2010 Skali what you see is not what you get......ahahahaha...but I'm sure my Contractor Willie is a responsible guy, so far 2 of his customers that i know has good relationship with him after the project is completed. I will definitely post more pic, I think it's fun to start this blog and hope for a great ending with nic pics to share Lyn Until today I am still calling Vincent to add things and fix things, hahahaha, and he is still very responsive. He must be wondering when I will ever give him peace. Share this post Link to post Share on other sites
gals_mama 0 Report post Posted September 16, 2010 Envy those that has completed their renovation and enjoying the* fruits of their labour*, we really missed our own home alot.....even the kids. Lyn soon ur house will be ready and u can also enjoy... Share this post Link to post Share on other sites
woodydodo 0 Report post Posted September 16, 2010 Nice 3D design....show us more pics ya. Cheers. Share this post Link to post Share on other sites
Specialkid 0 Report post Posted September 23, 2010 Day 15 Windows are up (Frosted with white frames, grilles not up) Living Room MBR & other bedrooms (no pics) same condition Only kitchen and common toilet (no pic - forget to take) wall tiles are up Black Tiles in between my kitchen cabinets My kitchen wall tiles are basically white Share this post Link to post Share on other sites
Specialkid 0 Report post Posted September 23, 2010 Hi, nice design you have there, care to share your quotations with me? Getting a home at the end of the year, pls email it to kenlim_76@hotmail.com. Thanks I'm not sure if it's alright to share? Is it a norm in the renov forum as my contractor do give goodwill discount at the end of my quotation? My contractor is Room for Ideas and so far the feedbacks are positive, you can do a search in this forum to find out more about my contractor. I'll pm his email address to you and do get him to quote for your place, his may not be the cheapest but it's the good carpentry, prompt response & great after sale services that is crucial to me. My colleague used him and introduced to me. So far I know 3 of his customers that are very satisfied with his work and hope I'm the next in the list. Lyn Share this post Link to post Share on other sites
Specialkid 0 Report post Posted October 4, 2010 (edited) Day 26 Completed -2 toilets & kitchen tilings -Electrical Work, Aircon Trunking and water pipes Pending -tilings for 3 bedrooms and living room -capentry work Here's some pics to share: MBR Toilet Common Toilet Edited October 4, 2010 by Specialkid Share this post Link to post Share on other sites
Specialkid 0 Report post Posted October 4, 2010 Day 26 - Part 2 L Box in Living & Dining Room Passage way to bedrooms and Storeroom Countdown........25 days to HOD!!!!! Share this post Link to post Share on other sites
steelze 0 Report post Posted October 24, 2010 heyy, good to hear another customer from rooms4ideas. how's ur reno coming along? never update for a while liao. hope everything is smooth on ur side! Share this post Link to post Share on other sites
galaxyraider 0 Report post Posted October 24, 2010 Hi, Can I have your ID/contractor's contact no? By the way, may I know how much he quoted you? Any hidden charges so far? Thanks! Share this post Link to post Share on other sites
Specialkid 0 Report post Posted October 25, 2010 heyy, good to hear another customer from rooms4ideas. how's ur reno coming along? never update for a while liao. hope everything is smooth on ur side! Great...we're shifting back on 31 Oct 2010. Everything is going well and has been tied up at work hence no chance to post. I will post my home pic ard early Nov after I have settled down. Lyn Share this post Link to post Share on other sites
Specialkid 0 Report post Posted October 25, 2010 (edited) Hi, Can I have your ID/contractor's contact no? By the way, may I know how much he quoted you? Any hidden charges so far? Thanks! I just pm his contact to you. Regarding the quotation, I think it's better that you get him to quote you. As the price will be different if you're not getting him to oversee everything. For mine, everything is taken care by him eg. from tiling, electrical work, carpentry and etc. So he can give us better discount. There isn't any hidden cost and towards the end of our renovation I am more certain that he's a very responsible and trusthworthy contractor. Do have a chat with him, he's very experienced and if my hubby and me can't agree on something, he'll be the decision maker for us. I'm glad that I have chosen him and my renovation process is a great experience.....we can't wait to move in this Sunday. Will upload our pic in early Nov once I settled down. Lyn Edited October 25, 2010 by Specialkid Share this post Link to post Share on other sites
pixie 0 Report post Posted October 26, 2010 Can u PM me your ID/contractor contacts too? Beautifully done up! Share this post Link to post Share on other sites