michaeleu 0 Report post Posted September 8, 2010 (edited) 1. Hack off existing wall and floor tiles for both Bathrooms including existing build in fitting : $1500 2. Dismantle existing 02 nos bathrooms doors : FOC 3. Supply & Lay homogeneous non-slip floor tiles at Master Bathroom : $350 4. Supply & Lay homogeneous non-slip floor tiles at Master Bathroom : $350 5. Supply & ceramic/Lay homogeneous wall tiles at Master Bathroom 220sqft : $1430 6. Supply & ceramic/Lay homogeneous wall tiles at Common Bathroom 199sqft : $1293 7. Supply & construct 01 shower kerb/step down for Master Bathroom : $80 8. Supply & install stainless steel piping for both bathroom : $520 9. Supply labour to install 02 nos of WC : $160 10. Supply labour to install 02 nos of wash basin : $120 11. Supply labour to install 02 nos of basin tap fitting : FOC 12. Supply labour to install 02 set of toilet accessories : FOC 13. Supply labour to install 02 nos of instant heater : $120 14. Supply labour to install 02 nos of shower set at bathroom : $100 15. Supply labour to install 02 nos of spray jet : FOC 16. Supply & install 10mm tempered glass sliding door shower screen at Master bathroom : $700 17. Design & fabricate suspended vaity cabinet c.w solid surface top including full ht : $675 clear mirror cabinet and light pelmet. Total ( Excluding 2 nos of WC and 2 nos wash basin ) : $7398 Is this price reasonable ? Edited September 8, 2010 by michaeleu Share this post Link to post Share on other sites
Stan 0 Report post Posted September 8, 2010 1. Hack off existing wall and floor tiles for both Bathrooms including existing build in fitting : $1500 2. Dismantle existing 02 nos bathrooms doors : FOC 3. Supply & Lay homogeneous non-slip floor tiles at Master Bathroom : $350 4. Supply & Lay homogeneous non-slip floor tiles at Master Bathroom : $350 5. Supply & ceramic/Lay homogeneous wall tiles at Master Bathroom 220sqft : $1430 6. Supply & ceramic/Lay homogeneous wall tiles at Common Bathroom 199sqft : $1293 7. Supply & construct 01 shower kerb/step down for Master Bathroom : $80 8. Supply & install stainless steel piping for both bathroom : $520 9. Supply labour to install 02 nos of WC : $160 10. Supply labour to install 02 nos of wash basin : $120 11. Supply labour to install 02 nos of basin tap fitting : FOC 12. Supply labour to install 02 set of toilet accessories : FOC 13. Supply labour to install 02 nos of instant heater : $120 14. Supply labour to install 02 nos of shower set at bathroom : $100 15. Supply labour to install 02 nos of spray jet : FOC 16. Supply & install 10mm tempered glass sliding door shower screen at Master bathroom : $700 17. Design & fabricate suspended vaity cabinet c.w solid surface top including full ht : $675 clear mirror cabiet and light pelmet. Total ( Excluding 2 nos for WC and 2 N=nos wash basin ) : $6798 Is this price reasonable ? 2 bathrooms at $6798? cheap lah few ID quoted me $4k-$5.2k per bathroom Share this post Link to post Share on other sites
michaeleu 0 Report post Posted September 8, 2010 (edited) 2 bathrooms at $6798? cheap lah few ID quoted me $4k-$5.2k per bathroom Sorry , the price should be $7398. But if I includes 2 nos. of WC and Wash basin, it may be around $8k+. Edited September 8, 2010 by michaeleu Share this post Link to post Share on other sites