Moneysaver 0 Report post Posted September 15, 2010 Can PM me ur ID/quotes. TIA. (: Share this post Link to post Share on other sites
leechaorui 2 Report post Posted September 16, 2010 Nice and practical layout. Share this post Link to post Share on other sites
leechaorui 2 Report post Posted September 16, 2010 Nice and practical layout. BTW, what are you planning to do with the utility room behind? Share this post Link to post Share on other sites
MO2 0 Report post Posted September 16, 2010 BTW, what are you planning to do with the utility room behind? I got no idea yet, will be changing the window, plastering and painting it, at this moment it will just be a playroom for my sons. Share this post Link to post Share on other sites
Guest Goobii Report post Posted September 19, 2010 (edited) Welcome to RT ~! Another 3rm forumer!~ Really alot of 3rm lately... Edited September 19, 2010 by Goobii Share this post Link to post Share on other sites
MO2 0 Report post Posted September 30, 2010 My renovation can only start tomorrow since the owner only gave us the key on a sunday night. It is almost a one week delay and i am not sure if my ID can finish fast enough for me to move in end of oct. Anyway, we took some pictures of the place before the hacking work starts tomorrow. Other than the lightings, most of the shopping for the new house is done. Got to change a few design here and there since my hubby's fengshui master say not too good. grrr... this is so tiring. Share this post Link to post Share on other sites
rainforest 0 Report post Posted October 1, 2010 My renovation can only start tomorrow since the owner only gave us the key on a sunday night. It is almost a one week delay and i am not sure if my ID can finish fast enough for me to move in end of oct. Anyway, we took some pictures of the place before the hacking work starts tomorrow. Other than the lightings, most of the shopping for the new house is done. Got to change a few design here and there since my hubby's fengshui master say not too good. grrr... this is so tiring. Wow great stuff MO2.....seems that the toilets were upgraded by HDB quite recently when they added the utility room...will you hack the tiles away? Share this post Link to post Share on other sites
MO2 0 Report post Posted October 1, 2010 yes, all the tiles will be hacked away since we are changing the toiet bowls basin etc. Will be going down tomorrow to see how the hacking is. will post pictures if i can Share this post Link to post Share on other sites
gals_mama 0 Report post Posted October 2, 2010 My renovation can only start tomorrow since the owner only gave us the key on a sunday night. It is almost a one week delay and i am not sure if my ID can finish fast enough for me to move in end of oct. Anyway, we took some pictures of the place before the hacking work starts tomorrow. Other than the lightings, most of the shopping for the new house is done. Got to change a few design here and there since my hubby's fengshui master say not too good. grrr... this is so tiring. We did our reno in 1 mth (23/6 til 24/7). Of course not all stuff are ready, rectifications still on going but at least its a move in condition. Must get all stuff that needs to be installed to be delivered. Like lightings, toilet bowls & basin, kitchen sink, water storage etc. My id helped me to call the all those shops to arrange for delivery so that she can plan in the schedule. However some stuff got to close 1 eye cos its a rush job as compared to others who uses 2 mths. If possible, go down every day to check progress. Share this post Link to post Share on other sites
MO2 0 Report post Posted October 4, 2010 My ID is trying to complete as soon as possible. Hacking was all done by today and i am so grateful to him for rushing for me. Tiles were delivered too so let's hope everythg goes on smoothly. My 2nd appt is on Friday, counting down now. All the shopping for new furnishing, furniture etc is not fun at all. I find them so tiring and stressful. pfftt Share this post Link to post Share on other sites
JeanL 0 Report post Posted October 5, 2010 My ID is trying to complete as soon as possible. Hacking was all done by today and i am so grateful to him for rushing for me. Tiles were delivered too so let's hope everythg goes on smoothly. My 2nd appt is on Friday, counting down now. All the shopping for new furnishing, furniture etc is not fun at all. I find them so tiring and stressful. pfftt Agreed. I have moved three times. It's a hectic process; renovating, purchases and the moving etc. Given a choice, really just want to stay put... Share this post Link to post Share on other sites
pang79 0 Report post Posted October 31, 2010 send! Can pm also.. Thanks a lot.. Share this post Link to post Share on other sites