Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
yeo99

My Little Home At Tamines

Recommended Posts


Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Two days after the hacking, it is like I am in the war zone with dust and dirt all over the places, even the contractor try to clean up at the end of the day.

Try to renovate first before moving in. Unfortunately, I have no choice.

Back to renovate issues..

I still have a few issues I need to solves:

1. White laminate for the kitchen cabinets, I post the issues:

http://www.renotalk.com/forum/index.php?showtopic=34130

2. KDK fan

http://www.renotalk.com/forum/index.php?showtopic=34078

This is pre-prep for the living room renovation.

Please try to reply the posts. Thanks alots

 

Share this post


Link to post
Share on other sites
Two days after the hacking, it is like I am in the war zone with dust and dirt all over the places, even the contractor try to clean up at the end of the day.

Try to renovate first before moving in. Unfortunately, I have no choice.

Back to renovate issues..

I still have a few issues I need to solves:

1. White laminate for the kitchen cabinets, I post the issues:

http://www.renotalk.com/forum/index.php?showtopic=34130

2. KDK fan

http://www.renotalk.com/forum/index.php?showtopic=34078

This is pre-prep for the living room renovation.

Please try to reply the posts. Thanks alots

Thanks for the feedbacks.

I have called the shops on KDK fan V60WK, this is what I get

Place fans price Installation charges Warranty

1. Kong Tai $ 430 $60 (local warranty)

2. Everjoint $ 390 $65 (local warranty)

3. Tommy $ 345 $50 (warranty by seller, fans from Malaysia)

See Tommy ebay website: http://shop.ebay.com.sg/?_from=R40&_tr...nkw=ceiling+fan

The price is just a reference. I have not confirm anyone yet as I am planning for the living room renovation.

The price from neubie I have not called. Thanks Neubie for the information.

If anyone have any information/comments, please post it. Thanks

Edited by yeo99
 

Share this post


Link to post
Share on other sites
Two days after the hacking, it is like I am in the war zone with dust and dirt all over the places, even the contractor try to clean up at the end of the day.

Try to renovate first before moving in. Unfortunately, I have no choice.

Back to renovate issues..

I still have a few issues I need to solves:

1. White laminate for the kitchen cabinets, I post the issues:

http://www.renotalk.com/forum/index.php?showtopic=34130

2. KDK fan

http://www.renotalk.com/forum/index.php?showtopic=34078

This is pre-prep for the living room renovation.

Please try to reply the posts. Thanks alots

The contractor Kelvin is using the EDL laminates. The EDL website is http://www.edleuro.com/

The EDL laminates is used by some top IDs in Singapore such as Vega, etc; furthermore they also win Singapore Prestige Brand award 09. Should be a good laminate......

We have decided to change the white laminate to something off-white near grey color.

Our first choice is Gray Hugo from the Stardust series:

grayhugo.jpg

Our second choice is White Nacre from the Stardust series:

whitenacre.jpg

The Stardust series have shining spots that make the actual laminate looks much very brighter than the picture posted. Furthermore, it has glossy surface.

Edited by yeo99
 

Share this post


Link to post
Share on other sites
3D Diagram:

From the Kelvin on the 3D diagram of the Kitchen Cabinet:

77733407.jpg

The 3D diagram indicates what is going to do and what is the materials used. At least, everyone is clear.... Hopefully less problem at the end.

The sliding door is a bit old fashion.... I am thinking of changing the design of door. I have come out a new design and feedbacked to Kelvin. Will posted it once confirmed.

Kelvin has confirmed to start the hacking job on this coming Monday.. Hope everythings go smoothly....

Hi, remember you power point. I mean your plug, which position and whether need to have extra or not.

happy reno!!!!

 

Share this post


Link to post
Share on other sites

Tiling Job:

Rate: 8/10

Comments:

I am happy with the workmanship and the attitude of the tiler and his workers. They try to keep the place clean. But not matter what it is not possible, next time try to renovate before moving it is the best.

Post some pictures:

img2486vq.jpg

img2487p.jpg

img2489l.jpg

img2488%7a%7a.jpg

img2491x.jpg

Now, waiting the comtractor to settle the electrical wiring and points.

 

Share this post


Link to post
Share on other sites

Plumber Job:

Rate: 3/10

Comments:

His job is to move the old washing basin to common toilet. This is a resquest from me and Kelvin agreed to do it FOC during the signing of the contract.

The plumber is rough man; never take care of the floor (even it old), and the new tiles on the kitechen sink. I guess if he do it with care, he will not demage my old wall tiles at the basin area, I cannot said anything more - Overal disappointing on the way he did thing.

Edited by yeo99
 

Share this post


Link to post
Share on other sites

Aluminium Work: To install Al swing with black acrylic panels.

img2519w.jpg

Problem:

It looks nice, however the centre door does not close smoothly, but can be closed by some forces.

Cause:

Close investigation finds that the centre and bottom rivets on the centre door is blocked by the left door panel. As a result there is some scratches on the left panel.

img2508f.jpg

img2509c.jpg

rivet.jpg

Have informed Kelvin, he will arange contractor to take a look tomorrow or next week.

Rate : 6/10 (I does not expect any problem because it is a small job)

Renovation is a very stressful thing indeed...... Hope everything goes smoothly....... :unsure:

Edited by yeo99
 

Share this post


Link to post
Share on other sites
Nice, wall tiles look good.

Hopefully, your contractor will fix the closure of door without any prob.

Do post more pics and feedback :)

Thanks, things are moving very slowly, the Al door have not been rectified yet. How fast I guess is the relationship between the main contractor and the sub-contractor.

I found the quality of the products and workmanship depends on

  1. Who is the sub-contractors the IDs/main contractors employed - it will determine the workmanship.
  2. The amount of profits the IDs/main contractors want to earn - that will determine the quality of the materials used. If you look at various quotation, it is not much differences.

Will definitely post some pictures when some works are done. Hope everyone keeping coming back.....

Keep my finger cross.... Hope to have a smooth renovation ....

 

Share this post


Link to post
Share on other sites

The Al swing doors below the kitchen sink have been rectified on last friday.. now, the doors can be closed smoothly ... :D

The kitchen sliding door have been installed too, will post some pictures soon....

Edited by yeo99
 

Share this post


Link to post
Share on other sites

Last weekend, too busy re-organising the store room. I brought the Gorm system from Ikea. I added the height extension post so as to reach a height of 233cm.

Not bad, can put alot of things inside the store room now.

img2575tc.jpg

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×