blue8179 0 Report post Posted August 30, 2010 1st part of hacking for floor and wall tiles carried out on 02 Aug. Then, we wait 2 weeks for approval to hack the wall and reposition the wall. Second part hacking carried out on 17 Aug. It takes one day to hack the wall. My husband forgot to take photo. Thought to take photo by following day..but is too late...We saw the new wall when we reach there Wall in between existing living area & kitchen is gone and new wall for MBR New entrance for MBR Seal up existing kitchen's entrance to become MBR Hack down 4ft wall to accomodate MBR's storage cabinet cum tv console. Behind is a new seal up door way which is existing MBR's entrance Erect new wall cum shelving @ master bathroom Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted August 30, 2010 OoOO overhaul overhaul overhaul!!! That's GREAT then you can do whatever you want! NICE!! ti's also nice to be able to play with so much space!!! Share this post Link to post Share on other sites
blue8179 0 Report post Posted August 30, 2010 New kitchen layout New store room & shoe cabinet area Future WIW. Ugly beam and odd shape layout Living area view from service balcony Share this post Link to post Share on other sites
blue8179 0 Report post Posted August 30, 2010 (edited) Tiles selected Top left & center (common bathroom) Top right (Living area) Bottom left & center (Master bathroom) Bottom right (Master bathroom's entrance) Tiling in progress (Start tiling on 23 Aug, est. will complete tiling and plastering by 09 Sept) Common bathroom Master bathroom Edited August 30, 2010 by blue8179 Share this post Link to post Share on other sites
blue8179 0 Report post Posted August 30, 2010 Continue... Master bathroom Living area Yes! Finally uploaded all the on hand photo. Up-to dated progress is tiling **** area Will go to take a look by this coming sat...Hopefully all done..yes!!! Bless me Share this post Link to post Share on other sites
blue8179 0 Report post Posted August 30, 2010 cos when I was looking for house at woodlands I came across this layout b4 at 68x mah. Btw , me Simon here. Henry was my contractor not me Hi Simon, your contractor is very "Hot" He was too busy to do my house May be next time Share this post Link to post Share on other sites
reizzz 0 Report post Posted August 30, 2010 i think your master bathroom will look nice Share this post Link to post Share on other sites
blue8179 0 Report post Posted August 31, 2010 (edited) i think your master bathroom will look nice Thanks. I hope so... Actually I like black and white and wish to get same color for common bathroom too.. But my husband said want something different, so... Edited August 31, 2010 by blue8179 Share this post Link to post Share on other sites
samgalz 2 Report post Posted August 31, 2010 welcome! sorry I'm late to welcome u...been busy...haha. nice and big layout and room for a great transformation, hope to c more! Share this post Link to post Share on other sites
blue8179 0 Report post Posted August 31, 2010 (edited) welcome! sorry I'm late to welcome u...been busy...haha. nice and big layout and room for a great transformation, hope to c more! Hi, thank you Will upload more d... Purchased items Panasonic Fridge (Second fridge from left) Soap dispenser (Planning to use it @ open concept kitchen) Wall clock for living area Carpet for living area Edited August 31, 2010 by blue8179 Share this post Link to post Share on other sites
blue8179 0 Report post Posted August 31, 2010 (edited) Continue... Black color rubbish bin for study room MBR and study room White color for kitchen Fan for living area Fan for study cum guest room (white color instead yellow color ) Fan for common room Edited August 31, 2010 by blue8179 Share this post Link to post Share on other sites
blue8179 0 Report post Posted August 31, 2010 Dining chair Main gate Tap for basin Share this post Link to post Share on other sites
blue8179 0 Report post Posted August 31, 2010 Proposed layout Share this post Link to post Share on other sites
blue8179 0 Report post Posted September 1, 2010 Renovation list: 1) Hacking floor, wall tiles, wall & false ceiling (Whole house) 2) Tiling for bathroom, kitchen, service balcony, living & 2 common bedroom 3) Cement screed & lay parquet flooring for MBR & study room. 4) Cement screeding kitchen & service balcany wall (No wall tiles) 5) Plastering whole house wall & ceiling 6) Rewiring 7) system 4 air-con 8) Painting 9) Change 4 doors & door frame for bedroom 10) Change main door and gate 11) Carpentry works 12) Change service balcony small window & 2 bathroom's windows 13) Glass work... Share this post Link to post Share on other sites
eznal 0 Report post Posted September 1, 2010 GOod luck for ur renovation , looking forward to ur picture for ur newly renovated house Share this post Link to post Share on other sites