lawsu 0 Report post Posted August 27, 2010 My bomb shelter got 2 ventilation vent. 1 directly on top the door. The other on other side of the wall. Is it ok to seal the ventilation on the other side of the wall??? My contractor seal them worr..... I read that the ventilation must be open at least 25%. So legal or not har?? "During Peacetime * The ventilation openings provide ventilation for day-to-day use of the Household Shelter. * Leave at least 25% of the aggregate ventilation opening area uncovered so as to prevent anyone accidentally trapped inside the Household Shelter from suffocating. This requirement is specified in the list of “Permitted and Not Permitted Works” (Chapter 7 of the Technical Requirements for Household Shelters) and also mentioned in the door notice affixed to the inner face of the Household Shelter door." Share this post Link to post Share on other sites
hihihi 0 Report post Posted August 27, 2010 Steel plate (after removal) must be secured inside the shelter on one of the walls using maximum 50 mm long removable screws in non-metallic inserts After removal of the steel plate, the bolts and nuts must be installed back to the original position in its fully closed/locked positions Up to 75% of the clear ventilation opening areas are allowed to be covered by removable aesthetics or architectural finishes or fixtures Share this post Link to post Share on other sites
lawsu 0 Report post Posted August 28, 2010 ohh.... so cover 1 ventilation is okie coz 50% nia.... correct?? Share this post Link to post Share on other sites
intonewlife 2 Report post Posted May 27, 2015 http://www.renotalk.com/forum/gallery/image/10117-screenshot-2015-05-27-11-13-18/so it is ok not to install back the steel plate? The ventilation I have at home is covered by carpentery work. Due to some ciricumstance, the steel plate couldnt install back. Share this post Link to post Share on other sites
lukesim 0 Report post Posted May 27, 2015 http://www.renotalk.com/forum/gallery/image/10117-screenshot-2015-05-27-11-13-18/so it is ok not to install back the steel plate? The ventilation I have at home is covered by carpentery work. Due to some ciricumstance, the steel plate couldnt install back.From my understanding , you don need to install back the steel plate ,but u need to keep the steel plate inside the home shelter wall with removable screws. Insert cannot use metal one, which means u need to use those plastic wall plug. After u remove the steel plate , u will see 4 bolts and nuts. U need to screw them back into the so called closed/locked positions. Share this post Link to post Share on other sites
bryoon 1 Report post Posted March 12, 2017 (edited) I had one of my bomb shelter ventilation cover changed to blend in with the wall. The contractor, Maison Mod Furnishings molded a ventilation cover out of cornice/plaster for replacement. Perfectly blended in with our interior design and retains some form of ventilation. For the other cover, I used a round clock to cover it. Edited March 12, 2017 by bryoon Share this post Link to post Share on other sites