Jo77 0 Report post Posted August 8, 2010 Hi folks, Need advise on whether the following quote is too expensive. I do feel so, hence am asking for advise. Wiring of the place is not yet included. Air-con not included as well CARPENTRY WORK Foyer 1) To supple deisgn install and fabricate full height shoe cabinet with selected laminated finishing - $1250 Living Area 2) To supply design, fabricate and install TV feature wall up to 6 Ft come with shelving console concept with ledge for diaplay, laminate frame design and box up with plaster board design - $2980 Dining Area 3) To supply deisgn, fabricate and install suspended altar cabinet come with drawer drawers in laminate finishing - $780 Kitchen Area 4) To supply fabricate and install kitchen kitchen bottom cabinets come with laminate and ABS trimming door -$1560 5) To supply labour and install solid surface work top at kitchen cabinet - $920 6) To supple fabricate and install full height cabinet and include boxed up sewage long pipe in selected laminate finishing - $480 Master Bedroom Area 7) To supply design, fabricate and install full hright sliding door wardrobe in selected laminate finishing - $2240 8) To supple design, fabricate and install suspended dressing table come with mirror and selected laminate finishing - $1000 9) To supply design, fabricate and install suspended TV ledge in selected laminate finishing (4ft) - $480 Bedroom 2 Area 10) To supply design, fabricate and install full height walk-in wardrobe with internal IPU design and selected laminate finishing - $2240 11) To supply design and install selected designed 'Supreme' platform in selected laminate finishing - $750 12) To supply labour and material to install fell height mirror - $680 13) To supply design, fabricate and install suspended ledge in selected laminated finishing (2ft) - $150 14) To supply design, fabricate and install low height study table come with 1 drawer in selected laminate finishing - $720 15) To supply design, fabricate and install helf height laminate headboard come with selected laminate finishing - $510 16) To supply design, fabricate and install suspended TV ledge in selected laminate finishing (5ft) - $600 Bedroom 3 Area 17) To supply design, fabricate and install full height cabinet comes with drawers, glass swing doors, internal laminate design in selected laminate finishing - $4950 HACKING WORK 18) To supply labour to dismantle exisiting false ceiling and simple cornices for whole house - $500 Kitchen Area 19) To supply labour and equipment to hack wall tiles - $900 20) To supply labour and equipment to hack hollow balock wall between kitchen and dining area - $90 21) To supply labour to dismantle existing kitchen cabinet - $280 22) To supply labour to dismantle existing sink and stove support - $ 180 Bedroom 2 23) To supply labour and equipment to hack hollow walls between bedroom 2 and store area - $180 24) To supply labour to dismantle existing skirting - $80 Store Area 25) To supply labour to dismantle existing door and door frames - $70 Bedroom 3 26) To supply labour to dismantle existing cabinet - $180 WET WORK Kitchen Area 27) To supply and construct 'L-shape' Kitchen cabinet base - $380 28) To supply and construct fridge base - $110 29) To supply and construct washing machine base - $110 30) To supply material and overlay homogenous floor tiles with selected floor tiles finish (only $3 per sq ft) - $1500 31) To supply material and overlay homogenous wall tiles woth selected tiles finish (Only $3 per sq ft) - $2970 Store Area 32) To supply and seal door size entrance with hollow block and plaster smooth finish - $380 LAMINATE FLOORING 33) To supply and lay selected deisnged ' Supreme' Laminate Flooring for Bedroom 2 Area (170 Sq Ft) - $1020 PLUMBING WORK 34) To supply labour and materials to run stainless steel inlet piping, run PVC outlet piping (excludes Tap and sink) - $580 PAINTING WORK 35) To supply labour to paint all interior walls and ceiling using Nippon Vinilex 5000 - $1550 WOODEN DOOR WORK 36) To supply labour and materials to install designer room doors with standard lock (x3) and to install beading design at door frame both size - $1410 GLASS WORK 37) To supply Labour and materials to install 10mm tempered fixed clear glass at walk-in wardrobe area - $600 CEILING WORK 38) To supply labour and material to construct false ceiling at foyer, bedroom's corridor and to construct L-box **** and dining area - $2850 MISCELLENOUS 39) To provide general cleaning, acid washing for whole house - $ 1400 TOTAL COST = $43211.95 with GST. Share this post Link to post Share on other sites
Ark7 0 Report post Posted August 9, 2010 (edited) Hi folks, Need advise on whether the following quote is too expensive. I do feel so, hence am asking for advise. Wiring of the place is not yet included. Air-con not included as well CARPENTRY WORK Foyer 1) To supple deisgn install and fabricate full height shoe cabinet with selected laminated finishing - $1250 Living Area 2) To supply design, fabricate and install TV feature wall up to 6 Ft come with shelving console concept with ledge for diaplay, laminate frame design and box up with plaster board design - $2980 Dining Area 3) To supply deisgn, fabricate and install suspended altar cabinet come with drawer drawers in laminate finishing - $780 Kitchen Area 4) To supply fabricate and install kitchen kitchen bottom cabinets come with laminate and ABS trimming door -$1560 5) To supply labour and install solid surface work top at kitchen cabinet - $920 6) To supple fabricate and install full height cabinet and include boxed up sewage long pipe in selected laminate finishing - $480 Master Bedroom Area 7) To supply design, fabricate and install full hright sliding door wardrobe in selected laminate finishing - $2240 8) To supple design, fabricate and install suspended dressing table come with mirror and selected laminate finishing - $1000 9) To supply design, fabricate and install suspended TV ledge in selected laminate finishing (4ft) - $480 Bedroom 2 Area 10) To supply design, fabricate and install full height walk-in wardrobe with internal IPU design and selected laminate finishing - $2240 11) To supply design and install selected designed 'Supreme' platform in selected laminate finishing - $750 12) To supply labour and material to install fell height mirror - $680 13) To supply design, fabricate and install suspended ledge in selected laminated finishing (2ft) - $150 14) To supply design, fabricate and install low height study table come with 1 drawer in selected laminate finishing - $720 15) To supply design, fabricate and install helf height laminate headboard come with selected laminate finishing - $510 16) To supply design, fabricate and install suspended TV ledge in selected laminate finishing (5ft) - $600 Bedroom 3 Area 17) To supply design, fabricate and install full height cabinet comes with drawers, glass swing doors, internal laminate design in selected laminate finishing - $4950 HACKING WORK 18) To supply labour to dismantle exisiting false ceiling and simple cornices for whole house - $500 Kitchen Area 19) To supply labour and equipment to hack wall tiles - $900 20) To supply labour and equipment to hack hollow balock wall between kitchen and dining area - $90 21) To supply labour to dismantle existing kitchen cabinet - $280 22) To supply labour to dismantle existing sink and stove support - $ 180 Bedroom 2 23) To supply labour and equipment to hack hollow walls between bedroom 2 and store area - $180 24) To supply labour to dismantle existing skirting - $80 Store Area 25) To supply labour to dismantle existing door and door frames - $70 Bedroom 3 26) To supply labour to dismantle existing cabinet - $180 WET WORK Kitchen Area 27) To supply and construct 'L-shape' Kitchen cabinet base - $380 28) To supply and construct fridge base - $110 29) To supply and construct washing machine base - $110 30) To supply material and overlay homogenous floor tiles with selected floor tiles finish (only $3 per sq ft) - $1500 31) To supply material and overlay homogenous wall tiles woth selected tiles finish (Only $3 per sq ft) - $2970 Store Area 32) To supply and seal door size entrance with hollow block and plaster smooth finish - $380 LAMINATE FLOORING 33) To supply and lay selected deisnged ' Supreme' Laminate Flooring for Bedroom 2 Area (170 Sq Ft) - $1020 PLUMBING WORK 34) To supply labour and materials to run stainless steel inlet piping, run PVC outlet piping (excludes Tap and sink) - $580 PAINTING WORK 35) To supply labour to paint all interior walls and ceiling using Nippon Vinilex 5000 - $1550 WOODEN DOOR WORK 36) To supply labour and materials to install designer room doors with standard lock (x3) and to install beading design at door frame both size - $1410 GLASS WORK 37) To supply Labour and materials to install 10mm tempered fixed clear glass at walk-in wardrobe area - $600 CEILING WORK 38) To supply labour and material to construct false ceiling at foyer, bedroom's corridor and to construct L-box **** and dining area - $2850 MISCELLENOUS 39) To provide general cleaning, acid washing for whole house - $ 1400 TOTAL COST = $43211.95 with GST. Hi bro, your carpentry work look ex but if u using high end lamination and complex design than i don knw how much liao. your kitchen top 11.5ft huh? your hacking & dismantle look a little ex, also your kitchen floor area got 190sft? and your wall area at350sft? What wooden door you using huh ? 470 with beads design your beads how much huh? your ceiling how many sft for lower ceiling and L-box? you staying in which type of flat? why general cleaning and acid wash for whole house so EX 1? think u need to compare quote from others. Cheers. Edited August 9, 2010 by Ark7 Share this post Link to post Share on other sites
junior 0 Report post Posted August 9, 2010 Hi folks, Need advise on whether the following quote is too expensive. I do feel so, hence am asking for advise. Wiring of the place is not yet included. Air-con not included as well CARPENTRY WORK Foyer 1) To supple deisgn install and fabricate full height shoe cabinet with selected laminated finishing - $1250 Living Area 2) To supply design, fabricate and install TV feature wall up to 6 Ft come with shelving console concept with ledge for diaplay, laminate frame design and box up with plaster board design - $2980 Dining Area 3) To supply deisgn, fabricate and install suspended altar cabinet come with drawer drawers in laminate finishing - $780 Kitchen Area 4) To supply fabricate and install kitchen kitchen bottom cabinets come with laminate and ABS trimming door -$1560 5) To supply labour and install solid surface work top at kitchen cabinet - $920 6) To supple fabricate and install full height cabinet and include boxed up sewage long pipe in selected laminate finishing - $480 Master Bedroom Area 7) To supply design, fabricate and install full hright sliding door wardrobe in selected laminate finishing - $2240 8) To supple design, fabricate and install suspended dressing table come with mirror and selected laminate finishing - $1000 9) To supply design, fabricate and install suspended TV ledge in selected laminate finishing (4ft) - $480 Bedroom 2 Area 10) To supply design, fabricate and install full height walk-in wardrobe with internal IPU design and selected laminate finishing - $2240 11) To supply design and install selected designed 'Supreme' platform in selected laminate finishing - $750 12) To supply labour and material to install fell height mirror - $680 13) To supply design, fabricate and install suspended ledge in selected laminated finishing (2ft) - $150 14) To supply design, fabricate and install low height study table come with 1 drawer in selected laminate finishing - $720 15) To supply design, fabricate and install helf height laminate headboard come with selected laminate finishing - $510 16) To supply design, fabricate and install suspended TV ledge in selected laminate finishing (5ft) - $600 Bedroom 3 Area 17) To supply design, fabricate and install full height cabinet comes with drawers, glass swing doors, internal laminate design in selected laminate finishing - $4950 HACKING WORK 18) To supply labour to dismantle exisiting false ceiling and simple cornices for whole house - $500 Kitchen Area 19) To supply labour and equipment to hack wall tiles - $900 20) To supply labour and equipment to hack hollow balock wall between kitchen and dining area - $90 21) To supply labour to dismantle existing kitchen cabinet - $280 22) To supply labour to dismantle existing sink and stove support - $ 180 Bedroom 2 23) To supply labour and equipment to hack hollow walls between bedroom 2 and store area - $180 24) To supply labour to dismantle existing skirting - $80 Store Area 25) To supply labour to dismantle existing door and door frames - $70 Bedroom 3 26) To supply labour to dismantle existing cabinet - $180 WET WORK Kitchen Area 27) To supply and construct 'L-shape' Kitchen cabinet base - $380 28) To supply and construct fridge base - $110 29) To supply and construct washing machine base - $110 30) To supply material and overlay homogenous floor tiles with selected floor tiles finish (only $3 per sq ft) - $1500 31) To supply material and overlay homogenous wall tiles woth selected tiles finish (Only $3 per sq ft) - $2970 Store Area 32) To supply and seal door size entrance with hollow block and plaster smooth finish - $380 LAMINATE FLOORING 33) To supply and lay selected deisnged ' Supreme' Laminate Flooring for Bedroom 2 Area (170 Sq Ft) - $1020 PLUMBING WORK 34) To supply labour and materials to run stainless steel inlet piping, run PVC outlet piping (excludes Tap and sink) - $580 PAINTING WORK 35) To supply labour to paint all interior walls and ceiling using Nippon Vinilex 5000 - $1550 WOODEN DOOR WORK 36) To supply labour and materials to install designer room doors with standard lock (x3) and to install beading design at door frame both size - $1410 GLASS WORK 37) To supply Labour and materials to install 10mm tempered fixed clear glass at walk-in wardrobe area - $600 CEILING WORK 38) To supply labour and material to construct false ceiling at foyer, bedroom's corridor and to construct L-box **** and dining area - $2850 MISCELLENOUS 39) To provide general cleaning, acid washing for whole house - $ 1400 TOTAL COST = $43211.95 with GST. Hi ... i am contractor myself .. Based on the quote u have ....is a bit on the high side of things... .. First of all is .Have the designer show u the 3d picture and is it what u want ..Its not use trying to check whether price is expensive if what quoted is not what u wish for ... For the carpentary work can u put in the measurement than i can advise u .. cheers Share this post Link to post Share on other sites