Sam Low 0 Report post Posted July 19, 2010 After months of searching and reviewing, we finally start our renovation last Saturday. The original floor plan: Floor plan Share this post Link to post Share on other sites
Sam Low 0 Report post Posted July 19, 2010 Picture B4 hacking Living Room Living Room2 Kitchen 1 Kitchen 2 MBR 1 MBR 2 Bed rm 1 Bed Rm 2 Share this post Link to post Share on other sites
Sam Low 0 Report post Posted August 22, 2010 After months of reviewing recommended contractor from the website, we decided to go for Luck Ann renovation and construction. 1st day : Hacking of entire house, total 7 workers were present to commenced the hacking. Hacking1 Hacking 2. Result of hacking on the day after: After hacking day 1 after hacking day1 (2) after hacking day1 (3) Arrival of tiles: Arrival of tiles 1 Share this post Link to post Share on other sites
Sam Low 0 Report post Posted August 22, 2010 Total Expenditure on Renovation come out to $55000 excluding furniture, fridge, washing machine and toilet accessories. Share this post Link to post Share on other sites