durianlane 0 Report post Posted June 23, 2010 Partially completed floor tiles Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 23, 2010 Completed toilet wall Share this post Link to post Share on other sites
pcomaster 0 Report post Posted July 5, 2010 Completed toilet wall Hi hi Durianlane Have not seen your progress blot lately! Completed everything? Care to share how much is your renovation fee for doing so much alteration? Thank you and wish you smooth journey. Share this post Link to post Share on other sites
durianlane 0 Report post Posted July 10, 2010 Hi hi Durianlane Have not seen your progress blot lately! Completed everything? Care to share how much is your renovation fee for doing so much alteration? Thank you and wish you smooth journey. Hi pcomaster, thanks for checking in. have been busy with work, shopping for furnitures & stuff, site inspection, etc ... so far completed the tiling, plastering, false celing. Next will be the lightings and carpentry works. The reno should be done in 2 weeks' time. For reno costs, I am still waiting for the variation calculations. The initial quote was around $35K. Share this post Link to post Share on other sites
durianlane 0 Report post Posted July 13, 2010 After 3 weeks of work ... Tiling completed Living Room Kitchen Toilet Share this post Link to post Share on other sites
neubie 2 Report post Posted July 13, 2010 Nice innovative design on the toilet! but is it possible for 2 persons occupying the bathroom & WC at the same time while maintaining privacy? Share this post Link to post Share on other sites
kuku 0 Report post Posted July 13, 2010 hi,change new piping about how much ar? Share this post Link to post Share on other sites
durianlane 0 Report post Posted July 13, 2010 (edited) Nice innovative design on the toilet! but is it possible for 2 persons occupying the bathroom & WC at the same time while maintaining privacy? Thanks ... definitely no privacy ... so can only admit one at a time hi,change new piping about how much ar? My contractor charged me $850 to change the toilet and kitchen pipes ... excluding the one near the laundry area cuz the condition is fairly ok. Edited July 13, 2010 by durianlane Share this post Link to post Share on other sites
durianlane 0 Report post Posted September 12, 2010 Moved in on 24 July 2010 ... the dust has finally settled and here are some Before & After Pictures ... LIVING ROOM Share this post Link to post Share on other sites
durianlane 0 Report post Posted September 12, 2010 KITCHEN BEDROOM Share this post Link to post Share on other sites
durianlane 0 Report post Posted September 12, 2010 TOILET Share this post Link to post Share on other sites
leechaorui 2 Report post Posted September 12, 2010 Very nice reno. A complete transformation. Share this post Link to post Share on other sites
durianlane 0 Report post Posted September 12, 2010 Very nice reno. A complete transformation. Thanks very much ... Share this post Link to post Share on other sites
gals_mama 0 Report post Posted September 12, 2010 i like ur toilet. Share this post Link to post Share on other sites
dexufto 5 Report post Posted September 12, 2010 (edited) Hello durianlane. Love your transformation, Fabulous modern design, choice of monotone colours. *thumbs up* You must be a proud owner of your newly furnished apartment. Consulted a FS master and his recommended layout: Especially your toliet too, wish to ask you about your initial layout, where the extended area was intially proposed to be a shower area but turned out to be wash-basin area? Any reasons for that? i like ur toilet. Edited September 12, 2010 by dexufto Share this post Link to post Share on other sites