durianlane 0 Report post Posted June 15, 2010 your living room is so lonnnnggg!! wah sounds like your permit approval didn't take too long.. i also wanted to reroute my pipes like what Goobii did. however, my hdb technical officer says it is illegal. i even spoke to the plumber who did Goobii's pipes, he sounded so unwilling to do it for me, told me he merely followed Goobii's contractor's instructions so I should speak to Goobii's contractor instead. It was a massive headache trying to get those pipes out of the way. So your contractor will be doing it for you? According to my contractor, the permit was approved very quickly without any fuss. It took both of us by surprise. I will double confirm with him again when I meet him tomorrow night and update you. Share this post Link to post Share on other sites
lilithfiend 0 Report post Posted June 15, 2010 According to my contractor, the permit was approved very quickly without any fuss. It took both of us by surprise. I will double confirm with him again when I meet him tomorrow night and update you. ya if you read my blog, you'll know that i had to fight hdb for a month to have my permit approved. but that could be because i'm putting a tub in my bathroom. as far as i know, permit does not cover pipes. hdb doesn't expect their lessees to modify them, i suppose. i think you better check with your contractor to be sure. the hdb technical officer told me that hdb conducts random site checks after renovation is completed to ensure everything is done according to their guidelines. so i think its best to check with your contractor.. Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 15, 2010 ya if you read my blog, you'll know that i had to fight hdb for a month to have my permit approved. but that could be because i'm putting a tub in my bathroom. as far as i know, permit does not cover pipes. hdb doesn't expect their lessees to modify them, i suppose. i think you better check with your contractor to be sure. the hdb technical officer told me that hdb conducts random site checks after renovation is completed to ensure everything is done according to their guidelines. so i think its best to check with your contractor.. Yeah, I have gone through your blog. Thanks for the heads up. I will definitely double check and double confirm with my contractor on the pipes issue. Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 17, 2010 (edited) Day 1 - Hacking of kitchen cabinets and bedroom2 sliding door panels ... Edited June 17, 2010 by durianlane Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 17, 2010 Day 3 - All tiles and parquet floor hacked ... Shifting of master bedroom door ... Toilet walls hacked ... doorway to master bedroom created ... Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 17, 2010 (edited) Main door gone New tiles, cement, etc ... Edited June 17, 2010 by durianlane Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 17, 2010 Master Bedroom doorway to be shifted ... Sliding door panels gone ... Share this post Link to post Share on other sites
lilithfiend 0 Report post Posted June 23, 2010 congrats on starting reno! how's progress so far? that's alot of tiles! why they remove main door so fast? Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 23, 2010 congrats on starting reno! how's progress so far? that's alot of tiles! why they remove main door so fast? thanks lilithfiend! Today is Day 10 and the workers have started tiling. Will upload pics in awhile Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 23, 2010 DAY 6 - Construction of extended toilet wall Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 23, 2010 Toilet pipes (before reconfiguration) Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 23, 2010 DAY 8 - New Pipes Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 23, 2010 Toilet wall almost complete Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 23, 2010 (edited) Day 10 - Water proofing of toilet Edited June 23, 2010 by durianlane Share this post Link to post Share on other sites
durianlane 0 Report post Posted June 23, 2010 New rubbish chute Share this post Link to post Share on other sites