golfer 2 Report post Posted June 9, 2010 i have the below renovation work to be done for a 4 room flat (105m.sq) It is worth getting different contractors to do? how much can i save? What is the sequence of work? Contractor A 1) painting - whole house Contractor B 2) window grille - whole house Contractor C 3) cabinets in living room 4) install false side ceiling with down lights in living room + ceiling fan Contractor D 5) install shower screen and cupboard in bathrooms 6) replace water heater above false ceiling 7) re-route expose water pipes Share this post Link to post Share on other sites
Ark7 0 Report post Posted June 10, 2010 i have the below renovation work to be done for a 4 room flat (105m.sq) It is worth getting different contractors to do? how much can i save? What is the sequence of work? Contractor A 1) painting - whole house Contractor B 2) window grille - whole house Contractor C 3) cabinets in living room 4) install false side ceiling with down lights in living room + ceiling fan Contractor D 5) install shower screen and cupboard in bathrooms 6) replace water heater above false ceiling 7) re-route expose water pipes U will save money but not time. that the ultimate concern for ppl which gotta work, unless clear leave or so. by the look at it should takes u 2 weeks to completed if i'm not wrong. Cheers Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 10, 2010 Even have time, must also know how to coordinate all the works. Share this post Link to post Share on other sites