I feel reasonable not expensive? May i know is quote from deisgn firm or contractor?

Mine is almost 30k but without build in wardrobe for 3 bedroom, fixture wall , tv console and whole house rewiring , aircon ,D8 & B7also.

hi1548

the quotation is from contractor.

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Some electricians tends to quote in lump sum for whole hse re-wiring. There's nothin wrong as in the early time, we don't itemize electrical pricing. The 'elders' ain't so calculative until the 'trendy' generation improvised to itemize qutoations for all items to make it more competitive & 'transparent...

*In HDB flats, most no. of wirings, power pts, tel pts, TV pts etc r quite standard... Its best to clarify the amount of pts u're limited to...

The quote is definately from a contractor, u may ask for final discount of maybe maximum of 1.4k & close this deal.... I trust the best price is abt 38.5k...

Squeezing the contractor pricing = cracking contractors' brain to cut cost, or maybe 'hum tam' u at the additional works etc... lol

Edited by de_Pierre
 

Share this post


Link to post
Share on other sites
Some electricians tends to quote in lump sum for whole hse re-wiring. There's nothin wrong as in the early time, we don't itemize electrical pricing. The 'elders' ain't so calculative until the 'trendy' generation improvised to itemize qutoations for all items to make it more competitive & 'transparent...

*In HDB flats, most no. of wirings, power pts, tel pts, TV pts etc r quite standard... Its best to clarify the amount of pts u're limited to...

The quote is definately from a contractor, u may ask for final discount of maybe maximum of 1.4k & close this deal.... I trust the best price is abt 38.5k...

Squeezing the contractor pricing = cracking contractors' brain to cut cost, or maybe 'hum tam' u at the additional works etc... lol

Hi was trying to get an idea if my quote from contractor was 2 much.He is a fast worker who has already done my hacking and laying of kitchen wall,floor and toilet wall and floor.Can take a look and tell me wahat u think.

Kitchen

1[ To supply and lay kitchen floor tiles -950

2) To supply and lay kitchen wall tiles to ceiling height except behind cabinet -2300

3) To construct fridge ,washing machine and cabinet base 21ft run -380

4) To supply and install kitchen bottom unit with laminated finishing and ABS trimming 21ft run -1995

5) To supply and install kitchen top unit with laminated finishing and ABS trimming 21ft run -1995

6) To supply and install cabinet top using solid surface 21ft run -1365

7 To supply and install stainless steel dish tray c -80

8) To supply and install alum frosted glass -110

9) To supply and install kitchen middle unit 2ft run - 190

10) Labour charges to install built in oven -60

11) To supply and install long cabinet at piping area with laminated finishing and ABS trimming 5ft run -475

Common Toilet

1) To supply and lay toilet tiles till ceiling height.1250

2) To supply and lay toilet floor tiles -500

3) To supply labour to install toilet bowl and basin-160

4) To supply and install aluminum bi-fold door at toilet entrance-180

5) To change sewage pipe (change to plastic) -600

6) Labour charge to install 2 nos of toilet accessories-60

7) To supply labour to install 1 nos gallon heater.-60

Master Toilet

1) To supply and lay toilet tiles till ceiling height.-1250

2) To supply and lay toilet floor tiles -500

3) To supply labour to install toilet bowl and basin-160

4) To supply and install aluminum bi-fold door at toilet entrance-180

5) Labour charge to install 2 nos of toilet accessories-6o

Carpentary

1) To design and fabricate full height casement wardrobe for Master bedroom 5ft run -975

2) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950

3) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950

Others

1) To rerun stainless steel cold piping-580

2) To run water heater piping-380

3) To hack 2 toilet wall and floor.To hack kitchen wall and floor. To hack kitchen cabinet.-1800

4) To spray rockstone on walls.Painting of ceilings.-1700

5) To plaster living room wall and toilet ceiling -300

6) To remove wall paper -400

7) To supply labour to repolish existing terrazzo flooring-990

8) To supply and install white aluminum window for living,3 bed rooms and kitchen-2066

9) To supply and install white aluminum window grills for living,3 bed rooms and kitchen-911

10) To supply and install 3 side L- box cornice in living room 12 inches-300

11) To supply and install 1 classic door at store room 160

12) To supply and install stainless steel rubbish chute-180

13) Installation of basin at solid top-100

14) To box up 3 no. of windows above c/rms and storeroom door.-120

15) To supply labour and change main door lock set-100

16) To supply labour and change main gate lockset- 100

17) To suppply and install Samsung system 3 aircon - 1800

18) Haulage -200

Electrical wiring

1) Living room - total- $2732

To change position and supply new MCB board -

4 down light wiring

4 down light installation

2 down light switches

1 ceiling fan wiring

1 ceiling fan switch

1 ceiling fan installation

1 ceiling light wiring

1 ceiling light switch

1 ceiling light installation

1 telephone point

1 scv point

2 double plugs

2) master bedroom-

1 aircon point

1 scv cable point

2 double plugs

1 toilet light wiring

1 toilet light switch

1 toilet light installation

1 ceiling fan wiring

1 ceiling fan installation

1 ceiling fan switch

1 bedroom light wiring

1 bedroom light switch

1 bedroom light installation

3) Common room 1-

2 double plugs

1 ceiling fan wiring

1 ceiling fan installation

1 ceiling fan switch

1 bedroom light wiring

1 bedroom light switch

1 bedroom light installation

4) Common Room 2 -

2 double plugs

1 ceiling fan wiring

1 ceiling fan installation

1 ceiling fan switch

1 bedroom light wiring

1 bedroom light switch

1 bedroom light installation

5) Kitchen

2 kitchen lights wiring

2 kitchen light switch

2 kitchen light installation

1 single point

3 double points

1 gallon heater point

1 toilet light wiring

1 toilet light switch

1 toilet light installation

FOC

1) To hack tiles at hall at kitchen arch

2) To supply labour and material to errect hall and kitchen arch.

3) To hack existing cornice in living room

4) To construct 4 ft run extended washing machine base.

5) To hack door frame at master bedroom toilet.

6) To supply and install cooker hob and 3 knob cooker

7) HDB Permit

8) Waterproofing for kitchen and bathroom

9) Chemical wash for kitchen and 2 toilets upon completion

 

Share this post


Link to post
Share on other sites
Hi was trying to get an idea if my quote from contractor was 2 much.He is a fast worker who has already done my hacking and laying of kitchen wall,floor and toilet wall and floor.Can take a look and tell me wahat u think.

Kitchen

1[ To supply and lay kitchen floor tiles -950

2) To supply and lay kitchen wall tiles to ceiling height except behind cabinet -2300

3) To construct fridge ,washing machine and cabinet base 21ft run -380

4) To supply and install kitchen bottom unit with laminated finishing and ABS trimming 21ft run -1995

5) To supply and install kitchen top unit with laminated finishing and ABS trimming 21ft run -1995

6) To supply and install cabinet top using solid surface 21ft run -1365

7 To supply and install stainless steel dish tray c -80

8) To supply and install alum frosted glass -110

9) To supply and install kitchen middle unit 2ft run - 190

10) Labour charges to install built in oven -60

11) To supply and install long cabinet at piping area with laminated finishing and ABS trimming 5ft run -475

Common Toilet

1) To supply and lay toilet tiles till ceiling height.1250

2) To supply and lay toilet floor tiles -500

3) To supply labour to install toilet bowl and basin-160

4) To supply and install aluminum bi-fold door at toilet entrance-180

5) To change sewage pipe (change to plastic) -600

6) Labour charge to install 2 nos of toilet accessories-60

7) To supply labour to install 1 nos gallon heater.-60

Master Toilet

1) To supply and lay toilet tiles till ceiling height.-1250

2) To supply and lay toilet floor tiles -500

3) To supply labour to install toilet bowl and basin-160

4) To supply and install aluminum bi-fold door at toilet entrance-180

5) Labour charge to install 2 nos of toilet accessories-6o

Carpentary

1) To design and fabricate full height casement wardrobe for Master bedroom 5ft run -975

2) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950

3) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950

Others

1) To rerun stainless steel cold piping-580

2) To run water heater piping-380

3) To hack 2 toilet wall and floor.To hack kitchen wall and floor. To hack kitchen cabinet.-1800

4) To spray rockstone on walls.Painting of ceilings.-1700

5) To plaster living room wall and toilet ceiling -300

6) To remove wall paper -400

7) To supply labour to repolish existing terrazzo flooring-990

8) To supply and install white aluminum window for living,3 bed rooms and kitchen-2066

9) To supply and install white aluminum window grills for living,3 bed rooms and kitchen-911

10) To supply and install 3 side L- box cornice in living room 12 inches-300

11) To supply and install 1 classic door at store room 160

12) To supply and install stainless steel rubbish chute-180

13) Installation of basin at solid top-100

14) To box up 3 no. of windows above c/rms and storeroom door.-120

15) To supply labour and change main door lock set-100

16) To supply labour and change main gate lockset- 100

17) To suppply and install Samsung system 3 aircon - 1800

18) Haulage -200

Electrical wiring

1) Living room - total- $2732

To change position and supply new MCB board -

4 down light wiring

4 down light installation

2 down light switches

1 ceiling fan wiring

1 ceiling fan switch

1 ceiling fan installation

1 ceiling light wiring

1 ceiling light switch

1 ceiling light installation

1 telephone point

1 scv point

2 double plugs

2) master bedroom-

1 aircon point

1 scv cable point

2 double plugs

1 toilet light wiring

1 toilet light switch

1 toilet light installation

1 ceiling fan wiring

1 ceiling fan installation

1 ceiling fan switch

1 bedroom light wiring

1 bedroom light switch

1 bedroom light installation

3) Common room 1-

2 double plugs

1 ceiling fan wiring

1 ceiling fan installation

1 ceiling fan switch

1 bedroom light wiring

1 bedroom light switch

1 bedroom light installation

4) Common Room 2 -

2 double plugs

1 ceiling fan wiring

1 ceiling fan installation

1 ceiling fan switch

1 bedroom light wiring

1 bedroom light switch

1 bedroom light installation

5) Kitchen

2 kitchen lights wiring

2 kitchen light switch

2 kitchen light installation

1 single point

3 double points

1 gallon heater point

1 toilet light wiring

1 toilet light switch

1 toilet light installation

FOC

1) To hack tiles at hall at kitchen arch

2) To supply labour and material to errect hall and kitchen arch.

3) To hack existing cornice in living room

4) To construct 4 ft run extended washing machine base.

5) To hack door frame at master bedroom toilet.

6) To supply and install cooker hob and 3 knob cooker

7) HDB Permit

8) Waterproofing for kitchen and bathroom

9) Chemical wash for kitchen and 2 toilets upon completion

Don't need for others to think. U've already committed to his services and also work is already started, even if the price is too much, what can u do? The purpose of writting in this thread and other threads seem to me like u r trying to promote his service. Since u said he is good and hardworking, even paying him a price is consider reasonable. Moreover, this is not your 1st time engaging his services.

 

Share this post


Link to post
Share on other sites
Don't need for others to think. U've already committed to his services and also work is already started, even if the price is too much, what can u do? The purpose of writting in this thread and other threads seem to me like u r trying to promote his service. Since u said he is good and hardworking, even paying him a price is consider reasonable. Moreover, this is not your 1st time engaging his services.

Hi just to clear your doubt and not be hurl accusations.i only confirmed with him regarding my tiling.The reason i am posting is so thhat i am able to find cheaper quotes for carpentery and electrical which i only told him to quote but will get back to him soon.For my own house i only did tiling and painting from him and that cost me over 10k.I HAVE READ THROUGH THIS FORUM BEFORE I WANNA POST ANYTHING.Shall i take pics for u to understand what i am saying.And I AM ONLY TRYING TO SAVE MONEY FOR MY MUM! AND I FIND HIS TILING PRICES REASONAABLE SO I DID POST REGARDING HIS WORK IS THAT WRONG???????????????

This is another quote i got from another firm and i told them i want an electrical quote. Thanks for your comments lovely.

Kitchen

1[ To supply and lay kitchen floor tiles -950

2) To supply and lay kitchen wall tiles to ceiling height except behind cabinet -2300

3) To construct fridge ,washing machine and cabinet base 21ft run -400

4) To supply and install kitchen bottom unit with laminated finishing and ABS trimming 21ft run -1995

5) To supply and install kitchen top unit with laminated finishing and ABS trimming 21ft run -1995

6) To supply and install cabinet top using solid surface 21ft run -1,500

7 To supply and install stainless steel dish tray c -FOC

8) To supply and install alum frosted glass - FOC

9) To supply and install kitchen middle unit 2ft run - 190

10) Labour charges to install built in oven - FOC

11) To supply and install long cabinet at piping area with laminated finishing and ABS trimming 5ft run -470

Common Toilet

1) To supply and lay toilet tiles till ceiling height.1250

2) To supply and lay toilet floor tiles -500

3) To supply labour to install toilet bowl and basin-130

4) To supply and install aluminum bi-fold door at toilet entrance-180

5) To change sewage pipe (change to plastic) -600

6) Labour charge to install 2 nos of toilet accessories-60

7) To supply labour to install 1 nos gallon heater.-50

Master Toilet

1) To supply and lay toilet tiles till ceiling height.-1250

2) To supply and lay toilet floor tiles -500

3) To supply labour to install toilet bowl and basin-130

4) To supply and install aluminum bi-fold door at toilet entrance-180

5) Labour charge to install 2 nos of toilet accessories-40

Carpentary

1) To design and fabricate full height casement wardrobe for Master bedroom 5ft run -960

2) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950

3) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950

Edited by vinder79@yahoo.com.sg
 

Share this post


Link to post
Share on other sites
Hi just to clear your doubt and not be hurl accusations.i only confirmed with him regarding my tiling.The reason i am posting is so thhat i am able to find cheaper quotes for carpentery and electrical which i only told him to quote but will get back to him soon.For my own house i only did tiling and painting from him and that cost me over 10k.I HAVE READ THROUGH THIS FORUM BEFORE I WANNA POST ANYTHING.Shall i take pics for u to understand what i am saying.And I AM ONLY TRYING TO SAVE MONEY FOR MY MUM! AND I FIND HIS TILING PRICES REASONAABLE SO I DID POST REGARDING HIS WORK IS THAT WRONG???????????????

Cheap doesn't mean good and good don't come cheap. If u think that sourcing for cheaper quote to save some money will in term give u the same quality material and workmanship of work then u r really wrong in thinking this way. Who don't want cheap and good here? But is there such good thing in the 1st place not? If u want a cheaper quote for carpentry, u can just buy a ST, see the classified section and look for those $45pfr cabinet, don't even need to ask around. And if u really read throught this forum before posting, then u should jolly well know the price of other forumers ID/contractor quotations. And u are the one who mislead others first, by not stating clearly that he only do tiling for u and your mum, and now u want to compare his quote on carpentry and electrical only. So who to blame? By posting so big on everything then ask for advise which u already engaged his services, who will not think this way. There are just too many self advertise ID/contractor ard here.

If u think I don't understand what u r saying, and yes indeed I'm. Cos in the first place if u were to state more clearly and instead on his wet work pricing, just ask for comparasion on carpentry and electrical quote, then its totally different story.

Edited by Lovely
 

Share this post


Link to post
Share on other sites
Hi just to clear your doubt and not be hurl accusations.i only confirmed with him regarding my tiling.The reason i am posting is so thhat i am able to find cheaper quotes for carpentery and electrical which i only told him to quote but will get back to him soon.For my own house i only did tiling and painting from him and that cost me over 10k.I HAVE READ THROUGH THIS FORUM BEFORE I WANNA POST ANYTHING.Shall i take pics for u to understand what i am saying.And I AM ONLY TRYING TO SAVE MONEY FOR MY MUM! AND I FIND HIS TILING PRICES REASONAABLE SO I DID POST REGARDING HIS WORK IS THAT WRONG???????????????

This is another quote i got from another firm and i told them i want an electrical quote. Thanks for your comments lovely.

Kitchen

1[ To supply and lay kitchen floor tiles -950

2) To supply and lay kitchen wall tiles to ceiling height except behind cabinet -2300

3) To construct fridge ,washing machine and cabinet base 21ft run -400

4) To supply and install kitchen bottom unit with laminated finishing and ABS trimming 21ft run -1995

5) To supply and install kitchen top unit with laminated finishing and ABS trimming 21ft run -1995

6) To supply and install cabinet top using solid surface 21ft run -1,500

7 To supply and install stainless steel dish tray c -FOC

8) To supply and install alum frosted glass - FOC

9) To supply and install kitchen middle unit 2ft run - 190

10) Labour charges to install built in oven - FOC

11) To supply and install long cabinet at piping area with laminated finishing and ABS trimming 5ft run -470

Common Toilet

1) To supply and lay toilet tiles till ceiling height.1250

2) To supply and lay toilet floor tiles -500

3) To supply labour to install toilet bowl and basin-130

4) To supply and install aluminum bi-fold door at toilet entrance-180

5) To change sewage pipe (change to plastic) -600

6) Labour charge to install 2 nos of toilet accessories-60

7) To supply labour to install 1 nos gallon heater.-50

Master Toilet

1) To supply and lay toilet tiles till ceiling height.-1250

2) To supply and lay toilet floor tiles -500

3) To supply labour to install toilet bowl and basin-130

4) To supply and install aluminum bi-fold door at toilet entrance-180

5) Labour charge to install 2 nos of toilet accessories-40

Carpentary

1) To design and fabricate full height casement wardrobe for Master bedroom 5ft run -960

2) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950

3) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950

To compare on carpentry work, we need to compare apple with apple, thats mean same design, same material and same workmanship. Others can give u cheaper quote by providing same design, same material but china workers. Or made in malaysia factory then bring it over here to install or same design but different material and so for.....so most really can't compare the pricing of carpentry, mostly from the price, I can only said it cheap.

 

Share this post


Link to post
Share on other sites
To compare on carpentry work, we need to compare apple with apple, thats mean same design, same material and same workmanship. Others can give u cheaper quote by providing same design, same material but china workers. Or made in malaysia factory then bring it over here to install or same design but different material and so for.....so most really can't compare the pricing of carpentry, mostly from the price, I can only said it cheap.

Yup i have gone to his factory and seen my mum's products being done its 18mm thick and she is getting Jennings Walnut outline laminates with brass handles.Cant wait for it to be done and i stucked to the same guy and electrical disc was given to us.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×