Just got my unit and still in the progress of renovation!!

I read the regulation that the overlaying of tiles for wet

areas no need to apply for the permit..

And so I carry on..

But one day, the HDB officer called me and threaten

me to apply for a permit..

He told me that I wanna save money and dun wanna

to apply for the permit so he has to be strict with me

and issue me summons..

What can I do????

Or

is this the way HDB protecting the approve contractors??

Or

just so chicken about complains?

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
Just got my unit and still in the progress of renovation!!

I read the regulation that the overlaying of tiles for wet

areas no need to apply for the permit..

And so I carry on..

But one day, the HDB officer called me and threaten

me to apply for a permit..

He told me that I wanna save money and dun wanna

to apply for the permit so he has to be strict with me

and issue me summons..

What can I do????

Or

is this the way HDB protecting the approve contractors??

Or

just so chicken about complains?

Hmm...overlaying of tiles for wet areas i.e. bathrooms would not require a specific permit according to HDB guidelines. Have you asked the HDB officer exactly what he's referring to?

 

Share this post


Link to post
Share on other sites
Hmm...overlaying of tiles for wet areas i.e. bathrooms would not require a specific permit according to HDB guidelines. Have you asked the HDB officer exactly what he's referring to?

he had come up to my unit

and

according to him, I have to apply for the permit lor..

 

Share this post


Link to post
Share on other sites
he had come up to my unit

and

according to him, I have to apply for the permit lor..

You're referring to the technical officer for your area right? Did you ask why you'd be requiring a permit when it's already stated in the guidelines that you do not have to? There could be other reasons...i.e. overlaying tiles way above the current floor level in non-wet areas. Recommend that you give a call to the officer and ask nicely? Btw, shouldn't your contractor/ID have got all these covered for you?

 

Share this post


Link to post
Share on other sites

Smell something fishy here.

For whatever renovation, you contractor need to apply permit from HDB, be it just overlaying tiles. I think your contractor didn't apply permit and your neighbor complaint u.

 

Share this post


Link to post
Share on other sites
Smell something fishy here.

For whatever renovation, you contractor need to apply permit from HDB, be it just overlaying tiles. I think your contractor didn't apply permit and your neighbor complaint u.

Initially I was thinking the same thing, but probably ts was referring to a more particular permit pertaining to overlaying of tiles. Any HDB renovation would require a general renovation permit (which is FOC)...but overlaying of tiles wouldn't require a specific one unlike installation of new windows for e.g.

But chronograph's right...you'll need a reno permit and pasted outside your main door as well as at the lobby of your block. The contractor/ID has to inform your direct neighbours as well of the hacking period as well as of the entire renovation period.

Edited by hcbing
 

Share this post


Link to post
Share on other sites
Initially I was thinking the same thing, but probably ts was referring to a more particular permit pertaining to overlaying of tiles. Any HDB renovation would require a general renovation permit (which is FOC)...but overlaying of tiles wouldn't require a specific one unlike installation of new windows for e.g.

But chronograph's right...you'll need a reno permit and pasted outside your main door as well as at the lobby of your block. The contractor/ID has to inform your direct neighbours as well of the hacking period as well as of the entire renovation period.

today, I just receive a complaint from the management

of working late...

As stated in the permit, the demolition work start from

8am and end at 6pm.. But a complaint comes to me at

5pm...

I bet my new neighbour has big ears!!!

 

Share this post


Link to post
Share on other sites

I have the permit and the demolition ends on 19 may

but the renovation ends on 11 June..

But still once complaint, the officer will call me..

I wonder if I can counter complaint the hdb officer??

 

Share this post


Link to post
Share on other sites
I have the permit and the demolition ends on 19 may

but the renovation ends on 11 June..

But still once complaint, the officer will call me..

I wonder if I can counter complaint the hdb officer??

Hmm...here are a few things that I'd suggest you to do. Give a call to HDB permit dept to confirm the renovation permit your contractor/ID has applied for you. Make sure you go through the details of the permit to verify that all required renovation works/items have indeed been submitted and approved.

Next, give a call to that technical officer. Have a friendly chat. Ask him which portion of the whole renovation process have you not had any permits for etc. Do be nice...in my opinion. The technical officer holds a lot more power than you might realize when it comes to your renovation works.

Cheers and good luck!

 

Share this post


Link to post
Share on other sites

hi

asking something a bit off the discussion here.

can reno permit be applied only after key collection? Or is there some kind of arrangement whereby the permit can be applied when almsot get keys?

 

Share this post


Link to post
Share on other sites
hi

asking something a bit off the discussion here.

can reno permit be applied only after key collection? Or is there some kind of arrangement whereby the permit can be applied when almsot get keys?

Can apply anytime as you wish.

Edited by bepgof
 

Share this post


Link to post
Share on other sites

if do reno must inform next door neighbor cos dust will fly to their house access area right? will kena complaint?

Edited by dean
 

Share this post


Link to post
Share on other sites
hi

asking something a bit off the discussion here.

can reno permit be applied only after key collection? Or is there some kind of arrangement whereby the permit can be applied when almsot get keys?

hi

yup can be apply before get keys but owner need to sign a hdb form ... sorry cant recall the name. This will save u 3 days & allow reno to start immediately on the day u get keys. unfortunately, my prev owner so kia-si even her hb said ok, she still dun want . wf n me so angry back then 'cos we assist her a lot of other hdb stuff :(

 

Share this post


Link to post
Share on other sites
hi

yup can be apply before get keys but owner need to sign a hdb form ... sorry cant recall the name. This will save u 3 days & allow reno to start immediately on the day u get keys. unfortunately, my prev owner so kia-si even her hb said ok, she still dun want . wf n me so angry back then 'cos we assist her a lot of other hdb stuff :(

is this true for BTO as well?

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×