sunnytan31

Pls Help On My Overhaul Quotation

Recommended Posts

Hi all, pls help to access my quotation, is it expensive? Thx...

--------------------------------------------------------------------

A Interior Designing & Services Include:

1 Design Concept & Budget Consultation

2 Space Planning, Layout Plan & Computer Design Drawings Proposal

3 Materials, Colour Scheme & Soft-Furnishing Consultation

B Hacking Works / Demolish Works

1 Supply labour & tools to hack existing marble flooring **** $600.00

2 Supply labour & tools to hack existing marble flooring at 3 bedroom $650.00

3 Supply labour & tools to hack existing floor tiles at master bathroom $150.00

4 Supply labour & tools to hack existing wall tiles at master bathroom $400.00

5 Supply labour & tools to dismantle existing w.c & wash basin at master bathroom FOC

6 Supply labour & tools to dismantle existing bathroom accessories at master bathroom FOC

7 Supply labour & tools to dismantle existing bathroom door at master bathroom FOC

8 Supply labour & tools to open a new entrance for master bathroom $80.00

9 Supply labour & tools to hack existing floor tiles at common bathroom $150.00

10 Supply labour & tools to hack existing wall tiles & metal door frame at common bathroom $400.00

11 Supply labour & tools to dismantle existing w.c & wash basin at common bathroom FOC

12 Supply labour & tools to dismantle existing bathroom accessories at common bathroom FOC

13 Supply labour & tools to dismantle existing bathroom door & door frame at common bathroom FOC

14 Supply labour & tools to hack existing floor tiles at kitchen $300.00

15 Supply labour & tools to hack existing wall tiles at kitchen $500.00

16 Supply labour & tools to hack existing concrete sink & stove support $120.00

17 Supply labour & tools to dismantle existing rubbish chute at kitchen FOC

18 Supply labour & tools to dismantle existing sliding door at kitchen entrance FOC

19 Supply labour & tools to remove cornices **** $80.00

20 Supply labour & tools to hack existing 1 panel of wall at in between living & master bedroom $130.00

21 Supply labour & tools to hack wall tiles, wall panel at kitchen entrance & masaiz tiles at main beam at foyer area $400.00

Sub-Total: $3,960.00

C Wet works & general works

1 Supply material & labour to lay 600mm x 600mm super gloss homogeneous floor tiles **** c/w skirting (tiles price range $3.00 & below) $3,100.00

2 Supply material & labour to lay 600mm x 600mm super gloss homogeneous floor tiles at 3 bedroom c/w skirting (tiles price range $3.00 & below) $2,900.00

3 Supply material & labour to lay 300mm x 600mm non-slip homogeneous floor tiles at kitchen (tiles price range $2.80 & below) $800.00

4 Supply material & labour to lay wall tiles at kitchen $1,600.00

5 Supply material & labour to lay 300mm x 300mm non-slip homogeneous floor tiles at master bathroom (tiles price range $2.80 & below) $380.00

6 Supply material & labour to lay ceramic / homogeneous wall tiles at master bathroom (tiles price range $2.80 & below) $1,150.00

7 Supply material & labour to lay water proofing membrane at master bathroom $100.00

8 Supply material & labour to lay 300mm x 300mm non-slip homogeneous floor tiles at common bathroom (tiles price range $2.80 & below) $380.00

9 Supply material & labour to seal up existing master bathroom entrance using hollow block $300.00

10 Supply material & labour to lay ceramic / homogeneous wall tiles at common bathroom (tiles price range $2.80 & below) $1,150.00

11 Supply material & labour to lay water proofing membrance at common bathroom $100.00

12 Supply material & labour to erect a wall using hollow block at in between master bedroom & living $400.00

13 Supply material & labour to construct kitchen cabinet base in tiles finish (expose area) $180.00

14 Supply material & labour to washing machine base in tiles finish $100.00

15 Supply material & labour to cement screed & make good finsih at dining hall $300.00

16 Supply material & labour to make good finished at affect wall & main beam due to hacking **** hall $150.00

Sub-Total: $13,090.00

D Doors Works

1 Supply material & labour to install top track sliding door at walk-in wardrobe entrance $500.00

2 Supply material & labour to install 2 nos of alum pwc bi fold door for 2 bathrooms (White backing) $480.00

3 Supply material & labour to install top track 10mm tempered glass sliding door c/w gypsum board U-box $1,080.00

4 Supply material & labour to install 1 fix + swing 10mm tempered glass shower screen at master bathroom $400.00

Sub-Total: $2,460.00

E Ceiling Works /Plastering Works

1 Supply material & labour to install L-Box **** (Dept 1.5ft) $800.00

2 Supply material & labour to install false ceiling at main entrance as plan $100.00

3 Supply material & labour to install L-Box at Master bedroom (Depth 18") $120.00

4 Supply material & labour to install false ceiling at master bedroom entrance $100.00

5 Supply material & labour to install L-Box at Bedroom 1 (Dept 18") $100.00

6 Supply material & labour to install L-Box at Bedroom 2 (Dept 18") $100.00

7 Supply material & labour to plaster whole unit wall & skin coat for ceiling c/w plaster compound $1,950.00

8 Supply material & labour to construct hollow block wall at wardrobe area $280.00

Sub-Total: $3,550.00

F Carpentry Works

1 Design & fabricate 20ft Top & Bottom kitchen cabinet c/w ABS trimming in laminate finish $2,200.00

2 Supply labour to install cooker hob & hood FOC

3 Supply & labour to install stainless steel backing at cooking are only $250.00

4 Supply materials & labour to install 16ft solid surface work top $1,200.00

5 Concrete backing for built-out kitchen sink area $180.00

6 Concrete kitchen sink and stove support with tiles $1,100.00

Sub-Total: $4,930.00

G Plumbing Works

1 Supply materials & labour to run stainless steel inlet piping for whole house (cold pipe only) $600.00

2 Labour for installation 2 nos of wash basin at bathroom $100.00

3 Labour for installation 2 nos of water closet at bathroom $180.00

4 Labour for installation of kitchen sink & tap FOC

5 Laying of concealed drainage pipe for kitchen sink FOC

6 Laying of concealed drainage pipe for washer FOC

Sub-Total: $880.00

H Miscellaneous / General Services

1 Supply material & labour to paint sealer for whole unit $150.00

2 Re-painting of whole unit's wall & ceiling with ICI emuision paint, gloss paint for all door frame, sewage pipe $1,250.00

3 Supply material & labour to install stainless steel rubbish chute $180.00

4 Laying of cardboard protection for whole house flooring (except bathroom) $200.00

5 Chemical wash & general cleaning upon completion FOC

6 Disposal of renovation debris $150.00

7 Sand supply $300.00

8 Supply ,aterial & labour to install bronze / silver anodize aluminum windows grilles at whole house Exclude 2 toilets $1,170.00

9 Supply materials $ labour to install alum sliding windows @ balcony $893.00

10 Supply 2 nos of water closet only (MAGNUM) & 2 nos of wash basin only (BARON) FOC

11 Supply stainless steel single bowl sink only FOC

Sub-Total: $4,293.00

GRAND TOTAL: $33,163.00

Optional Items

I Electrical Works

1 Rewiring for whole house

1.1 New lighting point x 39 nos - $30ea $1,170.00

1.2 Labour to install normal ceiling light or down light x 33 nos, 06 nos of ceiling fan without light - $10ea $600.00

1.3 13amp x 2 x 07 nos - $65ea $455.00

1.4 13amp x 1 x 11 nos - $55ea $605.00

1.5 air con point x 01 no - $90ea $90.00

1.6 heaer point x 02 nos - $85ea $170.00

1.7 scv point x 03 nos - $85ea $255.00

1.8 tel point x 01 nos - $65ea $65.00

1.9 Cooker hob hood point x 01 no - $80ea $80.00

1.10 14 way main DB-box x 01 set - $400ea $400.00

Sub-Total: $3,890.00

2 Design & Fabricate 5.5ft full ht shoes cabinet in laminate finish at foyer area $1,265.00

3 Supply & install 9ft pole system wardrobe at master bedroom $1,400.00

Sub-Total: $2,665.00

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Looks okay to me at one glance. This is a quote from an ID, isn't it? Most of the items are marked up by at least 10-15%.

Cheers!

 

Share this post


Link to post
Share on other sites
Looks okay to me at one glance. This is a quote from an ID, isn't it? Most of the items are marked up by at least 10-15%.

Cheers!

Yup, is quoted by an ID. Ya lor, I excepted they will mark up.

 

Share this post


Link to post
Share on other sites
Beware of the quote, running cold pipe is 660, then for water heater? I think they going to add up one by one as you request. The furntiure mark up too high.

Hi Lucas, thx... Noted your point on the Cold piping, will double cfm wif ID. For the furniture, I agree wif the high mark up, $110/ft, outside standard is $90/ft for Kitchen, worse portion is the shoes Cabinet, $230/ft.

Kitchen I will try to reduce further.

 

Share this post


Link to post
Share on other sites
Get everything included, after which ask for 15% discount from grand total. Take note of GST as well.

Price is already discounted but will further nego with him. Price is nett.

 

Share this post


Link to post
Share on other sites
4 Laying of cardboard protection for whole house flooring (except bathroom) $200.00

zzzzzzz

No lar bro, you misinterpreted. Is item 4. Laying of cardboard protection for whole house flooring (except bathroom) $200.00

 

Share this post


Link to post
Share on other sites
Hi all, pls help to access my quotation, is it expensive? Thx...

--------------------------------------------------------------------

A Interior Designing & Services Include:

1 Design Concept & Budget Consultation

2 Space Planning, Layout Plan & Computer Design Drawings Proposal

3 Materials, Colour Scheme & Soft-Furnishing Consultation

B Hacking Works / Demolish Works

1 Supply labour & tools to hack existing marble flooring **** $600.00

2 Supply labour & tools to hack existing marble flooring at 3 bedroom $650.00

3 Supply labour & tools to hack existing floor tiles at master bathroom $150.00

4 Supply labour & tools to hack existing wall tiles at master bathroom $400.00

5 Supply labour & tools to dismantle existing w.c & wash basin at master bathroom FOC

6 Supply labour & tools to dismantle existing bathroom accessories at master bathroom FOC

7 Supply labour & tools to dismantle existing bathroom door at master bathroom FOC

8 Supply labour & tools to open a new entrance for master bathroom $80.00

9 Supply labour & tools to hack existing floor tiles at common bathroom $150.00

10 Supply labour & tools to hack existing wall tiles & metal door frame at common bathroom $400.00

11 Supply labour & tools to dismantle existing w.c & wash basin at common bathroom FOC

12 Supply labour & tools to dismantle existing bathroom accessories at common bathroom FOC

13 Supply labour & tools to dismantle existing bathroom door & door frame at common bathroom FOC

14 Supply labour & tools to hack existing floor tiles at kitchen $300.00

15 Supply labour & tools to hack existing wall tiles at kitchen $500.00

16 Supply labour & tools to hack existing concrete sink & stove support $120.00

17 Supply labour & tools to dismantle existing rubbish chute at kitchen FOC

18 Supply labour & tools to dismantle existing sliding door at kitchen entrance FOC

19 Supply labour & tools to remove cornices **** $80.00

20 Supply labour & tools to hack existing 1 panel of wall at in between living & master bedroom $130.00

21 Supply labour & tools to hack wall tiles, wall panel at kitchen entrance & masaiz tiles at main beam at foyer area $400.00

Sub-Total: $3,960.00

C Wet works & general works

1 Supply material & labour to lay 600mm x 600mm super gloss homogeneous floor tiles **** c/w skirting (tiles price range $3.00 & below) $3,100.00

2 Supply material & labour to lay 600mm x 600mm super gloss homogeneous floor tiles at 3 bedroom c/w skirting (tiles price range $3.00 & below) $2,900.00

3 Supply material & labour to lay 300mm x 600mm non-slip homogeneous floor tiles at kitchen (tiles price range $2.80 & below) $800.00

4 Supply material & labour to lay wall tiles at kitchen $1,600.00

5 Supply material & labour to lay 300mm x 300mm non-slip homogeneous floor tiles at master bathroom (tiles price range $2.80 & below) $380.00

6 Supply material & labour to lay ceramic / homogeneous wall tiles at master bathroom (tiles price range $2.80 & below) $1,150.00

7 Supply material & labour to lay water proofing membrane at master bathroom $100.00

8 Supply material & labour to lay 300mm x 300mm non-slip homogeneous floor tiles at common bathroom (tiles price range $2.80 & below) $380.00

9 Supply material & labour to seal up existing master bathroom entrance using hollow block $300.00

10 Supply material & labour to lay ceramic / homogeneous wall tiles at common bathroom (tiles price range $2.80 & below) $1,150.00

11 Supply material & labour to lay water proofing membrance at common bathroom $100.00

12 Supply material & labour to erect a wall using hollow block at in between master bedroom & living $400.00

13 Supply material & labour to construct kitchen cabinet base in tiles finish (expose area) $180.00

14 Supply material & labour to washing machine base in tiles finish $100.00

15 Supply material & labour to cement screed & make good finsih at dining hall $300.00

16 Supply material & labour to make good finished at affect wall & main beam due to hacking **** hall $150.00

Sub-Total: $13,090.00

D Doors Works

1 Supply material & labour to install top track sliding door at walk-in wardrobe entrance $500.00

2 Supply material & labour to install 2 nos of alum pwc bi fold door for 2 bathrooms (White backing) $480.00

3 Supply material & labour to install top track 10mm tempered glass sliding door c/w gypsum board U-box $1,080.00

4 Supply material & labour to install 1 fix + swing 10mm tempered glass shower screen at master bathroom $400.00

Sub-Total: $2,460.00

E Ceiling Works /Plastering Works

1 Supply material & labour to install L-Box **** (Dept 1.5ft) $800.00

2 Supply material & labour to install false ceiling at main entrance as plan $100.00

3 Supply material & labour to install L-Box at Master bedroom (Depth 18") $120.00

4 Supply material & labour to install false ceiling at master bedroom entrance $100.00

5 Supply material & labour to install L-Box at Bedroom 1 (Dept 18") $100.00

6 Supply material & labour to install L-Box at Bedroom 2 (Dept 18") $100.00

7 Supply material & labour to plaster whole unit wall & skin coat for ceiling c/w plaster compound $1,950.00

8 Supply material & labour to construct hollow block wall at wardrobe area $280.00

Sub-Total: $3,550.00

F Carpentry Works

1 Design & fabricate 20ft Top & Bottom kitchen cabinet c/w ABS trimming in laminate finish $2,200.00

2 Supply labour to install cooker hob & hood FOC

3 Supply & labour to install stainless steel backing at cooking are only $250.00

4 Supply materials & labour to install 16ft solid surface work top $1,200.00

5 Concrete backing for built-out kitchen sink area $180.00

6 Concrete kitchen sink and stove support with tiles $1,100.00

Sub-Total: $4,930.00

G Plumbing Works

1 Supply materials & labour to run stainless steel inlet piping for whole house (cold pipe only) $600.00

2 Labour for installation 2 nos of wash basin at bathroom $100.00

3 Labour for installation 2 nos of water closet at bathroom $180.00

4 Labour for installation of kitchen sink & tap FOC

5 Laying of concealed drainage pipe for kitchen sink FOC

6 Laying of concealed drainage pipe for washer FOC

Sub-Total: $880.00

H Miscellaneous / General Services

1 Supply material & labour to paint sealer for whole unit $150.00

2 Re-painting of whole unit's wall & ceiling with ICI emuision paint, gloss paint for all door frame, sewage pipe $1,250.00

3 Supply material & labour to install stainless steel rubbish chute $180.00

4 Laying of cardboard protection for whole house flooring (except bathroom) $200.00

5 Chemical wash & general cleaning upon completion FOC

6 Disposal of renovation debris $150.00

7 Sand supply $300.00

8 Supply ,aterial & labour to install bronze / silver anodize aluminum windows grilles at whole house Exclude 2 toilets $1,170.00

9 Supply materials $ labour to install alum sliding windows @ balcony $893.00

10 Supply 2 nos of water closet only (MAGNUM) & 2 nos of wash basin only (BARON) FOC

11 Supply stainless steel single bowl sink only FOC

Sub-Total: $4,293.00

GRAND TOTAL: $33,163.00

Optional Items

I Electrical Works

1 Rewiring for whole house

1.1 New lighting point x 39 nos - $30ea $1,170.00

1.2 Labour to install normal ceiling light or down light x 33 nos, 06 nos of ceiling fan without light - $10ea $600.00

1.3 13amp x 2 x 07 nos - $65ea $455.00

1.4 13amp x 1 x 11 nos - $55ea $605.00

1.5 air con point x 01 no - $90ea $90.00

1.6 heaer point x 02 nos - $85ea $170.00

1.7 scv point x 03 nos - $85ea $255.00

1.8 tel point x 01 nos - $65ea $65.00

1.9 Cooker hob hood point x 01 no - $80ea $80.00

1.10 14 way main DB-box x 01 set - $400ea $400.00

Sub-Total: $3,890.00

2 Design & Fabricate 5.5ft full ht shoes cabinet in laminate finish at foyer area $1,265.00

3 Supply & install 9ft pole system wardrobe at master bedroom $1,400.00

Sub-Total: $2,665.00

your quote is too expensive . many mark up items

 

Share this post


Link to post
Share on other sites

Hi all,

Is item 8. Supply material & labour to install bronze / silver anodize aluminum windows grilles at whole house exclude 2 toilets for $1,170.00 expensive?

Any better recommendation, this Friday is my material selection date, if got better deal then I will have to exclude this.

Thanks...

 

Share this post


Link to post
Share on other sites
Hi all,

Is item 8. Supply material & labour to install bronze / silver anodize aluminum windows grilles at whole house exclude 2 toilets for $1,170.00 expensive?

Any better recommendation, this Friday is my material selection date, if got better deal then I will have to exclude this.

Thanks...

Your quotation is reasonable, don't need to listen to others already....since u "click" with your ID, just let he/she earn a bit. Most importantly is, he/she is reliablity and trustworthy. Paying a bit extra to do your house swee swee is better than engaging someone who give u a lot problems later on cos his/her quote is cheaper.

 

Share this post


Link to post
Share on other sites
Your quotation is reasonable, don't need to listen to others already....since u "click" with your ID, just let he/she earn a bit. Most importantly is, he/she is reliablity and trustworthy. Paying a bit extra to do your house swee swee is better than engaging someone who give u a lot problems later on cos his/her quote is cheaper.

I do agree with fair trade too... Noted with thanks.

 

Share this post


Link to post
Share on other sites

B Hacking Works / Demolish Works

1 Supply labour & tools to hack existing marble flooring **** $600.00

2 Supply labour & tools to hack existing marble flooring at 3 bedroom $650.00

1 Supply material & labour to lay 600mm x 600mm super gloss homogeneous floor tiles **** c/w skirting (tiles price range $3.00 & below) $3,100.00

2 Supply material & labour to lay 600mm x 600mm super gloss homogeneous floor tiles at 3 bedroom c/w skirting (tiles price range $3.00 & below) $2,900.00

is it required to hack away the marble flooring and lay 600x600 tiles?

7 Supply material & labour to lay water proofing membrane at master bathroom $100.00

11 Supply material & labour to lay water proofing membrance at common bathroom $100.00

by right this should be one package. not spilt into 2.

For your bathroom tiles and wall tiles if the current condition is really that bad then change. that might save u quite a bit too.

F Carpentry Works

1 Design & fabricate 20ft Top & Bottom kitchen cabinet c/w ABS trimming in laminate finish $2,200.00

What is the internal color for your kitchen cabinet. If white then will be expensive. You can ask for color interior.

G Plumbing Works

1 Supply materials & labour to run stainless steel inlet piping for whole house (cold pipe only) $600.00

2 Labour for installation 2 nos of wash basin at bathroom $100.00

3 Labour for installation 2 nos of water closet at bathroom $180.00

4 Labour for installation of kitchen sink & tap FOC

5 Laying of concealed drainage pipe for kitchen sink FOC

6 Laying of concealed drainage pipe for washer FOC

Sub-Total: $880.00

For the above only cold pipings? What if required hot?

you are installing water heater or storage tank for the whole unit?

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×