dbkungfu 0 Report post Posted May 22, 2010 (edited) This small case liao....got come across need to stop work for 1 mth cos wife came back from operation need lots of rest....after that, complaint to HDB that one part of the cornice dropped down cos is due to the reno work, wall hairlines cracks due to the hacking and the best part is I only hack common bath flooring and they are staying on top. Whatever works going to do, need to inform them, may be it be painting, carpentry, lighting or plumbling. Need to update owner, also need to update the owner on top. hmmm this doesnt sound comforting to me ... mine downstair neighbor's baby seem to have medical condition also. Anyway, sound like HDB double standard really exist though permit mentioned 9-5pm weekdays. wow your owner must be screaming everyday Based on mutual agreement, my current buyer allow me to stay (rent) max 2 months after handover. But wanna to avoid doing that. chit-chat a bit, anyone know whether any hdb build with "vacum" or gap between floor. So that noise is reduce. I know condo have something like that. Nowaday, new high end/class hdb bto like in amk, tanjung pagar (duxton Pinnacle) cost around $700k+, so just wonder whether they come with such feature. But I know mine definitely dont have Edited May 22, 2010 by dbkungfu Share this post Link to post Share on other sites
dbkungfu 0 Report post Posted May 23, 2010 (edited) hi all I need some expert help here. Here goes, I plan to purchase kdk ceiling fan v60wk though it comes with remote control, I wanna to install clipsal, mk or legrand fan controller switch, in case remote spoil, got backup. So not sure whether they will compatible with the fan. 'cos fan got 7 speed, does the switch have the same speed control. anyone have such experience? thnx in advance clipsal legrand MK Edited May 23, 2010 by dbkungfu Share this post Link to post Share on other sites
jaskel 2 Report post Posted May 23, 2010 hi all I need some expert help here. Here goes, I plan to purchase kdk ceiling fan v60wk though it comes with remote control, I wanna to install some mk or legrand fan controller switch, in case remote spoil, got backup. So not sure whether they will compatible with the fan. 'cos fan got 7 speed, does the switch have the same speed control. anyone have such experience? thnx in advance legrand MK Make sure the kdk soecialist install the fan for u. Cos most electrician can't install kdk properly. Experience it before when on to the 5th speed, it will start to "wobby" a lot liao. And kdk did not provide the balancing kit like other brands. Share this post Link to post Share on other sites
dbkungfu 0 Report post Posted May 23, 2010 Make sure the kdk soecialist install the fan for u. Cos most electrician can't install kdk properly. Experience it before when on to the 5th speed, it will start to "wobby" a lot liao. And kdk did not provide the balancing kit like other brands. thnx jaskel. for the fan installation, kdk had asked me to contact Lim Kim Thye Electric (Jalan Besar - next to GR link). do u meant ask them to install the switch as well ? or my electrician will be able to. Share this post Link to post Share on other sites
gimz63251073 0 Report post Posted May 23, 2010 hmm...ok, for my KDK babyfan, the instruction manual says CANNOT install regulator. If not will spoil the fan. u might want to check the manual before buying? Might not be applicable though.. Share this post Link to post Share on other sites
dbkungfu 0 Report post Posted May 23, 2010 hmm...ok, for my KDK babyfan, the instruction manual says CANNOT install regulator. If not will spoil the fan. u might want to check the manual before buying? Might not be applicable though.. thnx gim, found the manual from internet. It did mentioned about not compatible to dimmer or regulator. http://kdk.jp/product_detail.aspx?id=152 I guess I will just stick with normal on/off switch. heng ahhh ... thank you. Share this post Link to post Share on other sites
gimz63251073 0 Report post Posted May 23, 2010 no probz, you are most welcome. Share this post Link to post Share on other sites
jaskel 2 Report post Posted May 24, 2010 thnx jaskel. for the fan installation, kdk had asked me to contact Lim Kim Thye Electric (Jalan Besar - next to GR link). do u meant ask them to install the switch as well ? or my electrician will be able to. Your electrician just leave a point for them to install can liao. Share this post Link to post Share on other sites
dbkungfu 0 Report post Posted May 24, 2010 Your electrician just leave a point for them to install can liao. thnx again jaskel. btw, I am on business travelling to penang today until wednesday. So update will around end of the week. ID mentioned the kitchen based should be complete then. Will see. Share this post Link to post Share on other sites
dbkungfu 0 Report post Posted May 28, 2010 (edited) Day 5 (Thursday) - wet works & finalize on carpentry design Discussed with ID & carpenter on site on plan 3D design. Some minor change on my tv console design - scv, player, htpc compartment at middle of console to change to frosted glass (6mm thickness) as concern the IR signal may failed if using solid plywood though there are "holes". Glass should not have any problem. Didnt see much progress but ID reassure me that we are still on schedule. Luckily can speak Teo Chew, can discuss well with carpenter. Meeting end around 10pm. Common toilet - with water proofing is done (2 layer). Pipe to be boxup with water proofing as well Mbr toilet love this tiles - around $14 persqft, ID gave it free but just 2 rows. Edited June 2, 2010 by dbkungfu Share this post Link to post Share on other sites
dbkungfu 0 Report post Posted May 30, 2010 (edited) Sunday - Shopping time From Everjoint AMK - total damage $1.4k Fujioh 800mk Rinnai 3as Joven electric storage heater 25Liter Tomorrow will meetup with ID to do shopping for wc, faucet, vanity sinks, bathroom accessories, lightning at Lite Fusion (Upper serangoon) & Lightnings.com at Jalan Besar. Edited May 30, 2010 by dbkungfu Share this post Link to post Share on other sites
dbkungfu 0 Report post Posted June 1, 2010 (edited) Hi Bought this nice keyboard for my htpc. Was on sales last week for $39 (original $59), so ask buddy to help to buy one for me. Tested on my notebook ... work great & palm size. Communication using RF via usb donger. Edited June 1, 2010 by dbkungfu Share this post Link to post Share on other sites
dbkungfu 0 Report post Posted June 3, 2010 (edited) Hi renotalker For those who wanna do wall mount hair dryer in their bathroom like hotel check this out http://www.jvd.com.sg/hairdryers.htm Will drop by this week for pricing ... plan to buy the clipper pr model with shaver unit Edited June 3, 2010 by dbkungfu Share this post Link to post Share on other sites
dbkungfu 0 Report post Posted June 3, 2010 (edited) Day 10 (thursday) - lbox & carpentry measurement Completed since last few day: 1. Electrical works/wiring 2. kitchen base 3. MBR Bathroom tiling 4. bathroom sinks delivered today by Lite fusion (on-time) - for vanity measurement 5. aircon piping completed - very ugly ... dont wanna to take picture why cant they improve the technology to make it smaller or even pipeless. Like fridge, as I dont see any at all Photo taken by wf ... she been appointed as my 3rd party site supervisor now Lbox - living room Lbox - dining room Since Lbox is up already, I guess the loud air gun "firing" process had passed, worry downstair neighbor will complaint again. Wonder why they seal up totally the downlight wiring ... how would they know where is the point. Should they cut some square holes ? Anyway, leave it to my ID. MBR Bathroom tiles - floor completed Still worry about timeline ... ID mentioned base wall painting start tomorrow, so dusty how to paint & not seeing any carpentry work started yet, common bathroom tiling & pipe boxup still in progress ... stress stress Edited June 6, 2010 by dbkungfu Share this post Link to post Share on other sites
dbkungfu 0 Report post Posted June 6, 2010 (edited) Day 12 (Saturday) - painting/plaster patching Drop by & saw wall patching on going ... no noisy activities. Finally common toilet tiling & pipe waterproof boxup are done. Also notice water & citygas piping are completed as well Common toilet Citygas pipe installed & located based on my requirement Rubbish piling up in living/dining room Edited June 6, 2010 by dbkungfu Share this post Link to post Share on other sites