infinitie 0 Report post Posted August 2, 2010 (edited) And finally....reached shocking.... see thru' MBR bathroom window?? *(^*%&$^(*#&%^&*@ who is the window contractor? Change to this... cant really see the frosted glass cos photo was taken at night. New corridor window-our fault, did not inform that we wanted frosted glass Lucky our ID manage to change for us to this.... frosted glass Edited August 2, 2010 by infinitie Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 2, 2010 (edited) =updates= Partition and false ceiling up... pict taken on 1-Aug-2010 Partition at main entrance + L box cum false ceiling **** room L box cum false ceiling at MBR Ugly air con trunking- will box up. Bed head for light Edited August 3, 2010 by infinitie Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 3, 2010 (edited) =updates= Painters start work today... Electrician did not do a good job, did not remove the old lights and fans which we previously discussed. ID called them up immediately and told them to come and remove asap otherwise painters will have problem. Meet up with carpenters as well. Hope we did not miss out anything we need Anyway, here's the changes for the kitchen sink.....better and even better than what i have suggested. Edited August 3, 2010 by infinitie Share this post Link to post Share on other sites
lilithfiend 0 Report post Posted August 3, 2010 hey infinitie, your place is starting to take shape..progress looks good! btw, your kdk bathroom fan - u bought yourself? or ID supply? how much? Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 3, 2010 (edited) hey infinitie, your place is starting to take shape..progress looks good! btw, your kdk bathroom fan - u bought yourself? or ID supply? how much? Thanks... We bought the kdk ventilation fan at $115 from Parisilk. Model is 15WHPA...1 year warranty. Is the model same as yours? Edited August 3, 2010 by infinitie Share this post Link to post Share on other sites
lilithfiend 0 Report post Posted August 4, 2010 Thanks... We bought the kdk ventilation fan at $115 from Parisilk. Model is 15WHPA...1 year warranty. Is the model same as yours? nope..mine's 20WHA. it has the strongest air extraction rate in the KDK ventilation fan range, hehe very kiasu . got it for around $126.. Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 10, 2010 nope..mine's 20WHA. it has the strongest air extraction rate in the KDK ventilation fan range, hehe very kiasu . got it for around $126.. LOL.... to get rid of smell!! Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 10, 2010 (edited) It's been a while since i last update. Nothing much was done other than painting. Abit screw up on the electrical work... the DB board was wrongly placed, supposed to be above the main door but somehow it was fixed right below the "waterpipe" and yes below WATERPIPE.... of course we are NOT going to accept it! We had advised the electrician (twice) that we required 2 LAN cable (self provided) in the study room but only 1 was fixed and false ceiling was up already so we wonder how are they going to add the other.... By the way, the false ceiling for the DB box was cut and it's very ugly, again we wonder how are they going to fix. Currently, our ID is away for in-camp training and another colleague of his will stand in for him. We have yet to meet up but i guess we'll be, very soon... Edited August 10, 2010 by infinitie Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 13, 2010 (edited) =updates= Painting.... felt the whole place became brighten and bigger especially with the new white windows!! Anyway, we gg to meet up our relief ID at site tomorrow, hope we can finalise on the handover date. Living hall MBR Bedroom 1 - our gals' room Bedroom 2 - study room Dining area Edited August 16, 2010 by infinitie Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 16, 2010 (edited) We had met up our relief ID last sat and were quite impressed with the follow-up and rectification work he has done for our home. At last, most of the rectification had been proceed and he even took the effort to place masking tape for work needed to be done. Great job...keep it up man!! Here are some photos taken an hour ago.... Common bathroom bi-fold door installed.. luv the clean look Common bathroom- wrongly drilled wall tile was touch up.. This is something we have to salute the tiler uncle, it's not easy to remove the damaged tile and in fact we were struggling whether to take the risk or not bcos we were told it's gonna affect alot more tiles caused by the cut. Thankfully, it was done with minimum visiblilty. Tile at the size of 60cm x 30cm was cut half and replaced. Common and MBR bathroom concrete slab finally up.......... Edited August 16, 2010 by infinitie Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 19, 2010 (edited) =updates= Lovely gate and shower screen sliding glass door installed Just felt that the wrought iron gate came in too early.... door and door frame not yet paint cross finger that the gate will not get stain with paint Edited August 21, 2010 by infinitie Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 21, 2010 (edited) Happened to see this ad at OG.. For those looking for knife. Edited August 21, 2010 by infinitie Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 22, 2010 (edited) =updates= Finally, carpentry work in progress.... Mini top kitchen cabinet Edited August 22, 2010 by infinitie Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 22, 2010 (edited) continue... MBR wardrobe extreme left will be shelving..... before entrance to the bathroom extreme right of the wardrobe.... the window is the only way to the ledge where the air-con compressor will be placed. To cut cost on buying wire basket, we've requested pulley tray for folded clothing so that it will be convenient for us to take clothing for those placed at the back... Currently our clothing placed in the inner part are not in use!! Good job Edited August 29, 2010 by infinitie Share this post Link to post Share on other sites
infinitie 0 Report post Posted August 22, 2010 to be continue.... was down with flu and cough!! Share this post Link to post Share on other sites