alishong 0 Report post Posted April 22, 2010 (edited) Hi, After months of waiting and following up with Renotalk, finally get to set up a blog to record this major event. Bot a EM at Yishun in Nov 09 for 385k, COV 24k First Appointment - 02 Feb 2010 Second Appointment - 26 Mar 2010 Reno starts on 01 Mar 2010 Completed on 16 April 2010 Move in date - 24 May 2010 Original layout Edited April 26, 2010 by alishong Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 Final layout, but no bath tube in MBR bath, change to shower screen after much consideration Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 some photos on the original condition... Main entrance Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 Utility Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 (edited) Dining Area Edited April 22, 2010 by alishong Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 Kitchen Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 Kitchen Toilet Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 Living room Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 Balcony Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 original conditions of the staircase with red carpet Share this post Link to post Share on other sites
jtcp82 0 Report post Posted April 22, 2010 Hi, After months of waiting and following up with Renotalk, finally get to set up a blog to record this major event. Bot a EM at Yishun in Nov 09 for 385k, COV 24k First Appointment - 02 Feb 2010 Second Appointment - 26 Mar 2010 Reno starts on 01 Mar 2010 Completed on 16 April 2010 Original layout Congrats on your new home. Your renovation starts before your second appointment? The renovation permit using the previous owner name? Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 2nd Floor - Corridor to common toilet. Waste of space and got the contractor to converted to vanity top wash basin to have bigger shower space... Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 (edited) 2nd floor - Common Toilet Edited April 22, 2010 by alishong Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 2nd floor - BMR Toilet Share this post Link to post Share on other sites
alishong 0 Report post Posted April 22, 2010 (edited) 2nd floor - MBRM Funny door opening - entrance and toilet door clashes Lucky my contractor proposed and get 180 degree door hinges to solve this weird layout Edited April 22, 2010 by alishong Share this post Link to post Share on other sites