Thomaslimkt 0 Report post Posted April 14, 2010 My Reno started from 29 Mar (about 2 weeks ago) and things are only half way done... not sure if it can complete in time so that I can move in smoothly.... Work to be done: 1. Replace Living Hall Floorings 2. Replace Kitchen Walls and Floorings 3. Replace Toilet Walls and Floorings 4. Install Shoe Cabinet 5. Install Kitchen cabinet 6. Install Master room wardrobe 7. Install Master Toilet vanity and cabinet 8. Install Common Toilet vanity and cabinet 9. Install Paryer Altar 10. Install TV Console 11. Replace 3 bedroom door frames and 3 doors 12. Install Glass door for Kitchen entrance 13. Install Glass door for Master Toilet entrance 14. Install shower screen for both toilets 15. Electrical rewiring - 42Light points, 19DP, 4SP, 4 2Ways, 2 SCV, 2 Tel, 1 DB box and earth 16. Painting 17. Replace all glass windows and grilles 18. Plumbing work - Install new SS pipes, bowls and toilet access 19. Install 4in1 Mitsubishi Inverter aircon 20. Ceiling and Boxup works 21. Install Laminate Flooring for Master Room, Bedroom 2 and Bedroom 3 Furniture bought and ready to be delivered: 1. Sony 40" LCD TV 2. Panasonic Fridge (4 sticks - should be gd la) 3. 3+2 Recliner Sofa 4. Dining Table and Chairs 5. Coffee Table 6. Lightings and Bath Accessories 7. Hood, Hob and Oven 8. 2 Bedroom sets for my 2 kids with Mattress My pocket burns a big hole liao.... just hope the reno work can complete in time Share this post Link to post Share on other sites
Thomaslimkt 0 Report post Posted April 17, 2010 Here are some before and In-Progress pics to share.... Living Room http://s967.photobucket.com/albums/ae159/t.../Living%20Room/ Kitchen http://s967.photobucket.com/albums/ae159/t...20Reno/Kitchen/ Master Toilet http://s967.photobucket.com/albums/ae159/t...aster%20Toilet/ Common Toilet http://s967.photobucket.com/albums/ae159/t...ommon%20Toilet/ MasterBed Room http://s967.photobucket.com/albums/ae159/t...sterBed%20Room/ Bedroom 2 http://s967.photobucket.com/albums/ae159/t...no/BedRoom%202/ Bedroom 3 http://s967.photobucket.com/albums/ae159/t...no/BedRoom%203/ And the In-Progress Pics here http://s967.photobucket.com/albums/ae159/t...0In%20Progress/ This coming Monday, carpentry works are going to be installed... Share this post Link to post Share on other sites