jaskel 2 Report post Posted June 9, 2010 The end part of the cornice is not inside the quote, although u didn't request for it, but I feel its not nice to left out that part, so I ask my ceiling guys to complete it up for u, of course is FOC. Share this post Link to post Share on other sites
darkfear 0 Report post Posted June 10, 2010 Start with your floor plan and your ideas on what u intend to do. Doing false ceiling in the bath will cost much more than doing it in the bedrooms or living. The material for the bathroom is totally different and also there must have a manhole at the false ceiling. U can consider about it. ah i see.. thought it's exactly the same and would be relatively affordable. We have a pretty clear idea about how the house layout should be like... so it's mostly the little nitty gritty stuff that we need your help to plug the gaps liao! Maybe the ceiling we can ask the plasterer to make extra smooth so won't have the bumps instead.. Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 10, 2010 (edited) -> Jaskel: Can update us on what is to be done tomolo and next week? me and hubby totally lost le.. Edited June 10, 2010 by jeffcraze Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 10, 2010 -> Jaskel: Can update us on what is to be done tomolo and next week? me and hubby totally lost le.. This few days there will be no works done. Next week will up your air-con, still waiting for the time slot. Measurement of carpentry work and also installation of your vinyl flooring on monday. Tomorrow will complete your floor tiling work, and also continue of your plumbling works. Today the window grille came to install but they do took the wrong design so ask them bring back. Your master bath sliding glass door had installed. So your see, after monday, is all waiting for the carpentry work to be up. But during the waiting time, painter will come in to paint your whole hse. And the last part will be the installation of the carpentry work....then I HO to u. Next week you will see me running your site again. This few weeks, Alex and Keith are at your site doing the coordination and monitor the progress. Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 10, 2010 (edited) To other forumers, pls do not send me any more PM asking for quotation as I already full of projects till end of sept. I'll not be taking anymore projects till after that. Regardless u r rich or poor, doing more or less, to me all are equal, its 1st come, 1st serve. To ID/contractor, dont bother to pose as hse owner to ask me for a quote just to keep me busy. Cos if I do found out.....heeheehee. To my friends, pls do not set up a club for me. I prefer to keep as low profile as possible. Thks. I'm still prefer to advise in this forum rather than advertise or sell my service. I want to use more time to concentrate on doing my current and future confirmed projects than neglected them. I have my own principal of view towards business, if you are good, words of mouth will help you spread ard, if you are bad so will ppl spread for u. I been here for so long, and so is being in the trade. There reasons for me able to survive without doing forumers job. Edited June 10, 2010 by jaskel Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 10, 2010 This few days there will be no works done. Next week will up your air-con, still waiting for the time slot. Measurement of carpentry work and also installation of your vinyl flooring on monday. Tomorrow will complete your floor tiling work, and also continue of your plumbling works. Today the window grille came to install but they do took the wrong design so ask them bring back. Your master bath sliding glass door had installed. So your see, after monday, is all waiting for the carpentry work to be up. But during the waiting time, painter will come in to paint your whole hse. And the last part will be the installation of the carpentry work....then I HO to u. Next week you will see me running your site again. This few weeks, Alex and Keith are at your site doing the coordination and monitor the progress. Okie.. Thanx for the updates.. Hubby wondering the air-con guy gone where le.. He said best would be after next Tues, any day also he can go up see see.. The window grilles ppl muz keep an eye on them.. Like always do wrong lehz.. That time u told them 2 piece, they do 3.. Today, this again.. Wah, seems like our HO getting nearer le.. Btw, u still got something to show us rite? Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 10, 2010 (edited) Okie.. Thanx for the updates.. Hubby wondering the air-con guy gone where le.. He said best would be after next Tues, any day also he can go up see see.. The window grilles ppl muz keep an eye on them.. Like always do wrong lehz.. That time u told them 2 piece, they do 3.. Today, this again.. Wah, seems like our HO getting nearer le.. Btw, u still got something to show us rite? Window grilles and window different group of installers. If we are not there to coordinate, it will be install blindly. So our present is very important. And that is what we are for. Don't install wrong things to owner than ask them to accept it. And yes, I knew what I'm owning u. Edited June 10, 2010 by jaskel Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 10, 2010 Window grilles and window different group of installers. If we are not there to coordinate, it will be install blindly. So our present is very important. And that is what we are for. Don't install wrong things to owner than ask them to accept it. And yes, I knew what I'm owning u. Opps, my mistake.. Ya, luckily u guys were there.. If not installed le, me and hubby will be staring blankly at the window grilles and looking at each other, wondering "is this our house?" Btw, would u be showing us the interiors of the carpentry stuffs? Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 10, 2010 Opps, my mistake.. Ya, luckily u guys were there.. If not installed le, me and hubby will be staring blankly at the window grilles and looking at each other, wondering "is this our house?" Btw, would u be showing us the interiors of the carpentry stuffs? Yes, need to. If not u don't like it and done already then big big problems liao. Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 10, 2010 Jaskel, hubby juz told me when he went up yest, he noticed that a small piece of the bottom of the living room wall near the main door was chipped off lehz.. can help us to cover the hole? Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 10, 2010 Jaskel, hubby juz told me when he went up yest, he noticed that a small piece of the bottom of the living room wall near the main door was chipped off lehz.. can help us to cover the hole? Will take note of that. Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 12, 2010 Sandblasted glass sliding door for master bath. Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 12, 2010 Plumbling works in progress for common bath. Master bath Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 12, 2010 Window grille for bedroom 3 Living room Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 12, 2010 Went up for a little inspection today by ourselves and saw that window grilles for corridor room and living room is up already. The tiles tat we had made a little complain abt were re-done up nicely already, along with skirtings tat jaskel got the tiler to re-do.. Plumbing done and part of the bathroom accessories were up. Juz a little hiccup, as we also didn't seperate the common and MBR toilet accessories properly.. Wrong showerhead in common toilet but tat can easily be resolved.. Juz change over nia.. But, jaskel, yr plumber really blur lehz (abt the matter hubby called to complain in the afternoon).. Waiting for the rest of the window grilles to be up.. Oh, like to mention that we both like the MBR toilet sliding door! -> Jaskel, hubby will call u and let u know somethings that he wans to be rectified.. Looking forward to next week, when the painting is in progress and can see the effect of the colour scheme choosen.. With the end nearing soon, jaskel, can I ask my FSM for a date to move in? Share this post Link to post Share on other sites