jeffcraze 0 Report post Posted June 2, 2010 Last time, it was umaisairah who won the ps3, now it's you. I also bought frm lightings.com.sg but nvr win ps3. Why ????? :( :( Erhm... Think jaskel brought us luck.. Anyway, u have a PM! Share this post Link to post Share on other sites
fencer 0 Report post Posted June 2, 2010 There will be but will dry up quickly too. Toilet is constantly wet so there will be a problem. The reason on why you have heard of complaining of water leakage from on top is not because their tiles crack but water proofing wear off or not done properly. But how water get into the level of the water proofing is mostly from your grouting. Ohh.. ok.. new things learned again.. Thanks again... Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 2, 2010 -> Jaskel, we are okie to meet u on fri nite. Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 2, 2010 -> Jaskel, we are okie to meet u on fri nite. Yuppie, bedok again Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 2, 2010 Yuppie, bedok again Okie, the same mac okie for u? Wld be around 7.30pm, fine? Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 2, 2010 Okie, the same mac okie for u? Wld be around 7.30pm, fine? Ok...that will be good....how come we arranging the meeting here??? Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 2, 2010 (edited) Sealant applied for the kitchen walls. Electrical wiring was also laid first. Edited June 2, 2010 by jaskel Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 2, 2010 Ok...that will be good....how come we arranging the meeting here??? Coz ended up u and me happened to be on the forum at the same timing ma, so arrange here lah.. The electrician came again today? hardworking lehz.. think our reno a bit slow down coz of the plumbing works.. Dun worry, this time round, we will choose the colours and let u know on fri, so tat u can advise us on the laminates.. Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 2, 2010 Anyway, juz an update regarding my complaint to ICA abt the ex house owners. An ICA officer called me today and tell me 2 of the 3 persons have already changed their address, one of which was recent, which i guess is coz her car's road tax is expiring next fri! The 3rd one, has not changed and ICA will be taking "appropriate actions" against him. Will e-mail them and ask in 2 week, if no news from them tat the idiot has changed his address.. Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 2, 2010 Jaskel, hubby asking u if the air-con guy is confirmed le? Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 2, 2010 Coz ended up u and me happened to be on the forum at the same timing ma, so arrange here lah.. The electrician came again today? hardworking lehz.. think our reno a bit slow down coz of the plumbing works.. Dun worry, this time round, we will choose the colours and let u know on fri, so tat u can advise us on the laminates.. Don't worry, the plumber already here once for installation of your 2 WC. Just need the rest of your bathrooms assy. so can install 1 shot. Must remember to buy the tap for washing machine also. Actually the plan was to do Mon-tues, electrical wiring, then tues,painting for your kitchen walls with sealant first then follow by wed, city gas piping installation (cos the arrangement for city gas was made) don't want plumber to crush with them together. Thur measurement of your MBR sliding glass door and also bathroom door. Thur also plumber come installation of piping. Need to install the heater so that the water piping can run to the bathrooms. Now need to shift the plumber a bit backwards. Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 2, 2010 Jaskel, hubby asking u if the air-con guy is confirmed le? Why? he thinking of using another air-con man? Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 2, 2010 Why? he thinking of using another air-con man? No, coz he dunno if u were able contact that guy.. So, when is the appt for? Need to prepare money.. Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted June 2, 2010 Don't worry, the plumber already here once for installation of your 2 WC. Just need the rest of your bathrooms assy. so can install 1 shot. Must remember to buy the tap for washing machine also. Actually the plan was to do Mon-tues, electrical wiring, then tues,painting for your kitchen walls with sealant first then follow by wed, city gas piping installation (cos the arrangement for city gas was made) don't want plumber to crush with them together. Thur measurement of your MBR sliding glass door and also bathroom door. Thur also plumber come installation of piping. Need to install the heater so that the water piping can run to the bathrooms. Now need to shift the plumber a bit backwards. Pai sei.. Muz rearrange the plumber again.. Share this post Link to post Share on other sites
jaskel 2 Report post Posted June 2, 2010 No, coz he dunno if u were able contact that guy.. So, when is the appt for? Need to prepare money.. Don't worry abt the money, I meeting the guy at his shop to pay him. I will let him know when I need the installer to come. Share this post Link to post Share on other sites