Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
jeffcraze

Our Love Nest In Simei

Recommended Posts

HA.. We have chosen lights same as you leh.. but at different places..

just infoo.. All my lights came in pieces.. the electrican had to spend time assembling them.. e.g screws, balast, some need to drill holes etc.. he mentioned some shops can ask them to assemble 1st then send over leh.. would save time also..

Wah, we chose the same lights ah... wahaha.. :dancingqueen: I bought from lightings.com.sg, would they provide such services? :unsure:

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
Wah, we chose the same lights ah... wahaha.. :dancingqueen: I bought from lightings.com.sg, would they provide such services? :unsure:

dun think they will assemble for you, all the downlights come in separate parts. The delivery guy is so chop chop tat i din even have time to do my stock check, he just put down all the stuffs and leave without much explanation and claim any issue just need to call them back.

so when my lights are being installed, found out that they delivered short of 1 ballast, called them up and true enuff they even delivered the 1 ballast a couple of days later without any complaints... :good: ...so to prevent any potential delay, at least ensure all parts are delivered before the lightings installation begins.

 

Share this post


Link to post
Share on other sites

Boss, this is one of the laminates u've selected for the kitchen cabinet.

patrick24.jpg

patrick23.jpg

patrick22.jpg

Intention was to use the black laminate on the cabinet backing and white for all your doors and drawers. As your flooring and wall is dark grey and light grey, if the black laminate are used for too many area, it may make your kitchen area quite dark.

U can also consider adding the black laminate on the doors but a few pcs only. Eg. as follow

patrick26.jpg

patrick25.jpg

 

Share this post


Link to post
Share on other sites

This is another laminate that u've chosen for the kitchen cabinet.

patrick27.jpg

patrick28.jpg

My feel is if the doors and drawers were to choose a lighter tone will be better.

Such as Ivory....but is still up to u which u prefer best, as individual taste and preference is different. Most importantly, u need to like it, love it, as u r staying in it.

 

Share this post


Link to post
Share on other sites
dun think they will assemble for you, all the downlights come in separate parts. The delivery guy is so chop chop tat i din even have time to do my stock check, he just put down all the stuffs and leave without much explanation and claim any issue just need to call them back.

so when my lights are being installed, found out that they delivered short of 1 ballast, called them up and true enuff they even delivered the 1 ballast a couple of days later without any complaints... :good: ...so to prevent any potential delay, at least ensure all parts are delivered before the lightings installation begins.

Oh, jaskel will most prob be helping us to pick up the lightings as we dun have a car.. :P Most prob we will go up and check before installation takes place.. ;)

 

Share this post


Link to post
Share on other sites
Met jaskel and his partner today, suppose to discuss on colours selection for painting, but, we never did our homework.. :P

Went up to our house to inspect first, and saw that jaskel was sweeping the MBR bathroom floor, getting ready for our inspection.. ;) Pointed out wat we felt were some minor problem areas, like the living room floor was slightly too "tilted" and was told tat will tell tiler to rectify the prob.. New corridor windows had a bit of porb, which jaskel and partner will be getting the window installer to rectify too.. Hubby also asked for rectification on the living room floor tiles grouting, where some were too shallow.. :P Picture as seen below, dunno izzit we too fussy.. :P

Livingroom9.jpg

Other than those some minor problems, we were pretty satisfied with the workmenship. :good:

Next was the choosing of laminates for feature wall, tv console, wardrobe and kitchen cabinets. Took us approx 2 hours to decide! :o Luckily jaskel and partner was very patient, if not i think they will be vomitting blood.. :P Now waiting for jaskel to input the laminates we chose into the 3D pictures and see the effect before finalising the laminates.. :D

Next week's schedule will be electrical works, gas piping works and water heater installation, first coat of painting and sealant, etc.. :unsure: Plumbing works supposed to do too, but we have not bought the toilet accessories yet.. :P

Today tiler came and will rectify the priblems in the living room. Also will be hacking away the skirting as I'm not satify with it. Don't worry about any extra cost for the tiles as I will paid for the workers mistakes. As for the grouting will be redoing for it. As for the windows, already found out what the problems, will solve it when the installer came, it was the locking hook issues.

As everyone can see, even I'm not prefect, reno will sure have some hipcups here and there. We contractors just have to try our best to attend to the owners request.

 

Share this post


Link to post
Share on other sites
Today tiler came and will rectify the priblems in the living room. Also will be hacking away the skirting as I'm not satify with it. Don't worry about any extra cost for the tiles as I will paid for the workers mistakes. As for the grouting will be redoing for it. As for the windows, already found out what the problems, will solve it when the installer came, it was the locking hook issues.

As everyone can see, even I'm not prefect, reno will sure have some hipcups here and there. We contractors just have to try our best to attend to the owners request.

Thanx jaskel, for rectifying everything as soon as we bring to yr attention. That's very invaluable to us, as consumers. :thumbs up:

 

Share this post


Link to post
Share on other sites

Water repellent for the kitchen walls had already done, will test it when dry....now raining heavily here. :(

 

Share this post


Link to post
Share on other sites
Water repellent for the kitchen walls had already done, will test it when dry....now raining heavily here. :(

Raining at simei? my client's side very dry lehz.. huge sunshine at tuas... :rolleyes:

 

Share this post


Link to post
Share on other sites

Tomorrow I have a course to attend. Most likely will self collect your lighting on wed. If not, today will be better, even it is too be done tonight.

 

Share this post


Link to post
Share on other sites
Tomorrow I have a course to attend. Most likely will self collect your lighting on wed. If not, today will be better, even it is too be done tonight.

maybe we can go there and collect with u coz the receipt is with us. I get hubby to call u and arrange when he finishes work ba.. :)

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×