jaskel 2 Report post Posted May 16, 2010 Phase 2 Design - Wardrobe Share this post Link to post Share on other sites
jaskel 2 Report post Posted May 16, 2010 Phase 2 Design - Wardrobe (Modify) Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted May 16, 2010 Ah... The phase 2 drawings as promised.. Thanx jaskel! Can't wait for the last phase drawings! Share this post Link to post Share on other sites
leechaorui 2 Report post Posted May 16, 2010 Very nice 3D pictures. Did you do it on your own? Share this post Link to post Share on other sites
jeffcraze 0 Report post Posted May 16, 2010 Erhm, think tat is actually 2D pictures.. Anyway, nope, drawings are not done by me, but rather, done by jaskel. Share this post Link to post Share on other sites
jaskel 2 Report post Posted May 16, 2010 Phase 2 Design - Master Bath Share this post Link to post Share on other sites
jaskel 2 Report post Posted May 16, 2010 Common Bath Share this post Link to post Share on other sites
jaskel 2 Report post Posted May 17, 2010 Erhm, think tat is actually 2D pictures.. Anyway, nope, drawings are not done by me, but rather, done by jaskel. Actually its 3D sketch up. Normally contractors won't be providing this to customers. Doing this as a hobby first before purchasing the real 3D software which cost thousand of bucks and also better space planning as it will give me a est. measurement. Share this post Link to post Share on other sites
jaskel 2 Report post Posted May 17, 2010 (edited) Day 1(Mon 10/05/2010) - Day 5 ~ Hacking and clearing of debris Common Bath Kitchen Kitchen Kitchen Master Bedroom False ceiling and Bathroom door frame Edited May 17, 2010 by jaskel Share this post Link to post Share on other sites
jaskel 2 Report post Posted May 17, 2010 (edited) Day 6 (Mon 17/05/2010) - Day 10 ~ Tiling of 2 Bathroom walls and Cement plastering of Kitchen walls Master bath Master bath Master bath Kitchen walls Edited May 24, 2010 by jaskel Share this post Link to post Share on other sites
jaskel 2 Report post Posted May 17, 2010 (edited) Material Normal cement, plastering, floor protection paper 2 different types of sand used for different purposes Another type of cement for tiles only Another type of cement for waterproofing only Quick Seal 104 for waterproofing of 2 bathrooms & kitchen flooring and upturn 100mm on walls There are different brands of cement so is not necessary that other contractors/IDs must used the one I posted. There is another bag of waterproofing material that will be use also but I will not post it here. ...if not those newbie contractor or ID will know too much info for free. Edited May 17, 2010 by jaskel Share this post Link to post Share on other sites
jaskel 2 Report post Posted May 17, 2010 (edited) A small unforesee problem arise. 17 tiles found to be cracked after dismantling the boxes. Need to call up the tiles shop to replenish the tiles if not will delay the work process. Need to let the tiles absorb water before tiling it up. Edited May 17, 2010 by jaskel Share this post Link to post Share on other sites