Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
htng

Titling Of Hdb Main Door

Recommended Posts

Great ... can post some pictures for us?

pls take some close up shots.

Edited by htng
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
ehhh..i do not noe hw to post the pix leh...

u nd to load the pics onto a pic server host p.g. photobucket or flickr then in post click "insert image" icon and copy the http link onto here and the pics will show.

 

Share this post


Link to post
Share on other sites

here is the link

http://www.flickr.com/photos/8huat8/?saved=1

its not so complicated as all of u r saying...i only adjust my door, gate no adjustment

The additional of timber frame (as shown painted in white) to existing metal frame in order for the door to tilt.

- HDB has already approved

- Shown master chang the pix, informed by him that it is gd.

*pls note that the gap between the 2 frames must be filled by silicon and the additional frame must be painted the same colour as the existing frame.

Edited by 8huat8
 

Share this post


Link to post
Share on other sites
here is the link

http://www.flickr.com/photos/8huat8/?saved=1

The additional of timber frame (as shown painted in white) to existing metal frame in order for the door to tilt.

- HDB has already approved

- Shown master chang the pix, informed by him that it is gd.

*pls note that the gap between the 2 frames must be filled by silicon and the additional frame must be painted the same colour as the existing frame.

Dun hv anything???!! did u allow public viewing for this album?

 

Share this post


Link to post
Share on other sites
ok..done

Brilliant! If possible, try to take more pictures from front, back, left and right if it is convenient for you. Thanks a lot....Can you pm me your ID, contractor?

 

Share this post


Link to post
Share on other sites
Brilliant! If possible, try to take more pictures from front, back, left and right if it is convenient for you. Thanks a lot....Can you pm me your ID, contractor?

front,back,left & rgt doesnt show anyting coz a whole new pc of frame was added...

 

Share this post


Link to post
Share on other sites
front,back,left & rgt doesnt show anyting coz a whole new pc of frame was added...

can let me know who is ur ID or contractor?

 

Share this post


Link to post
Share on other sites
hi, did master chang say hav to keep the gate opened?

thks

he suggest that to me but how to keep the gate open? Tough

 

Share this post


Link to post
Share on other sites
if gate nvr tilt...gate has to b fully open coz if not, will experience a 2 door scenario...

I see. I always thought door is dependent on door frame. Haha! Tilt gate will be weird

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×