Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
vermyapre

Electrical work cost??

Recommended Posts

Looking for good contractors? Click here for your request
On 12/1/2017 at 4:21 PM, hellolulu said:

Hi. may I know if the attached quotation from the electrician is considered reasonable? Thank you.

Electrician Quotation_edited.jpg

My electrician's quote

  1. 13A double power point $60ea
  2. 13A single power point $55ea
  3. 15amp aircon power point $95ea
  4. 20amp water heater point $95ea
  5. SCV data point $90ea
  6. Lighting point $30ea
  7. 16 way D/B switch box $320
  8. Install light fittings $15ea
  9. Earth point $100
 

Share this post


Link to post
Share on other sites

I got a quotation as below. 

Am I getting chopped? :wacko:

1. Lighting point $40ea

2. 13A double power point $75ea

3. SCV point $120ea

4. Data Point $180ea

5. hood point $140ea

6. Oven point $155ea

7. 20 Amp Industrial hob point $250ea

8. Install hanging light $65ea

9. Install light $10ea

10. Install T5 $10ea

11. Conceal and hacking works $400

 

Share this post


Link to post
Share on other sites
On 02/12/2017 at 5:36 PM, neutronstar said:

My electrician's quote

  1. 13A double power point $60ea
  2. 13A single power point $55ea
  3. 15amp aircon power point $95ea
  4. 20amp water heater point $95ea
  5. SCV data point $90ea
  6. Lighting point $30ea
  7. 16 way D/B switch box $320
  8. Install light fittings $15ea
  9. Earth point $100

Hi, can PM your electrician contact? Your rates include the hacking and concealing is the wiring? Thanks.

 

Share this post


Link to post
Share on other sites
On 27/12/2017 at 11:46 PM, cadino said:

Hi, can PM your electrician contact? Your rates include the hacking and concealing is the wiring? Thanks.

Dear Cadino,

Please email me. I can assist you

samsim@jianye.com.sg

Thank you

 

Share this post


Link to post
Share on other sites

Does anyone knows how much it cost to do the following electrical work for a 4-room HDB BTO flat?

1st trip

  • Provide Materials & Labour to extend existing water heater electrical wiring in common toilet to service yard and install new water heater outlet and switch at service yard.
  • Provide Materials & Labour to lay 2x new 15 amp cable from MCU to Kitchen (~5m and ~8m) with switch at a different end.
    MCU ---- Switch ---- Electrical port

2nd trip

  • Install water heater tank in service yard
  • Install ~13x LED ceiling lights
  • Change 2x 2-Gang plug outlet to a new outlet (plug outlet provided)
  • Change 1x 2-Gang switch to a new switch panel (switch panel provided)
 

Share this post


Link to post
Share on other sites

lighting point=$30 13Ax2=$55 13Ax1=$45 water heater=$85 scv=$85 tel=$40 data point=$100  15A(aircon)=$90 intall light=$10 intall fan=$50                                                                                                                                                                lighttig point conceal=$55   single socket conceal=$70  double socket conceal=$80  tel point conceal=$55  data point conceal=$130                                                                                                                                                                                   hv any probluem for electeric can sms him hp:84559198/+60127666950 whatapps:+6584559198 

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×