ah_dun 0 Report post Posted May 16, 2010 Plastering job almost done... =) MBR bathroom plastering ceiling done MBR plastering done 3rd Bedroom done 2nd Bedroom done Tml noon City Gas will come over to fix the gas piping for gas heater and discuss with my ID whr the power point and whr the lighting point. Share this post Link to post Share on other sites
reuben82 0 Report post Posted May 17, 2010 You did the plastering for whole house? How much it is costing ak? Share this post Link to post Share on other sites
ah_dun 0 Report post Posted May 17, 2010 1.7k... ex rite? My fren did his house only 1.4k but is done by his relative la. Pls take note u need to pay gas piping for urself. Gas piping for living room area cost $120, from living room connect to ur hod area cost another $100. If u 1 2 fix gas heater there is another $60 for gas piping connection frm ur hod area to ur gas heater. Price only for gas piping fee not included Gas Heater itself. =) You did the plastering for whole house? How much it is costing ak? Share this post Link to post Share on other sites
reuben82 0 Report post Posted May 18, 2010 Wah, now I'm blur. What is all this gas piping gas heater? The gas you mentioned is those gas to use for cooking right? hahahaha...why there is a heater there? Share this post Link to post Share on other sites
whiteoryx 0 Report post Posted May 21, 2010 1.7k... ex rite? My fren did his house only 1.4k but is done by his relative la. Pls take note u need to pay gas piping for urself. Gas piping for living room area cost $120, from living room connect to ur hod area cost another $100. If u 1 2 fix gas heater there is another $60 for gas piping connection frm ur hod area to ur gas heater. Price only for gas piping fee not included Gas Heater itself. =) How much is the heater? Did you manage to get the promo price? One heater can be used for the two bathroom right? Share this post Link to post Share on other sites
pinktini 0 Report post Posted May 21, 2010 How much is the heater? Did you manage to get the promo price? One heater can be used for the two bathroom right? hey, i like the effect of your green mosaic tiles extending to the floor, very nice. most ppl just stop at the end of the wall tiles. and ya, citygas they charge installation fee for every single thing they do. i paid $260 altogether for 3 installations, pipe to hob, dryer & heater. whiteoryx: i installed the citygas heater, they say it can supply hot water to 2 bathrooms at the same time. Share this post Link to post Share on other sites
tracy 0 Report post Posted May 21, 2010 nice green and white combination you have!! Share this post Link to post Share on other sites
whiteoryx 0 Report post Posted May 22, 2010 hey, i like the effect of your green mosaic tiles extending to the floor, very nice. most ppl just stop at the end of the wall tiles. and ya, citygas they charge installation fee for every single thing they do. i paid $260 altogether for 3 installations, pipe to hob, dryer & heater. whiteoryx: i installed the citygas heater, they say it can supply hot water to 2 bathrooms at the same time. Woo... hmm... thats good... cause i saw that they're selling the heater at a lower price now... hmm.. can consider as my mdm wants a heater in both toilets lol although i dun use them Share this post Link to post Share on other sites
ah_dun 0 Report post Posted May 22, 2010 Actually yes... They can connect it to the gas heater if u fix gas heater. I choose gas heater b'cos I'll nv forget to switch off the heater, I no need to fix 2 way switches and it more economic. What I said about the gas piping it exact same as water piping. They'll change all new piping from outside to ur kitchen if u r doing a full reno. Living area cost $120, Kitchen area to ur hob and hood cost $100, and connect to ur gas heater cost $60. Wah, now I'm blur. What is all this gas piping gas heater? The gas you mentioned is those gas to use for cooking right? hahahaha...why there is a heater there? Share this post Link to post Share on other sites
ah_dun 0 Report post Posted May 22, 2010 I think when I bought is promotion price la $128 but after connect all new gas piping is near $500 la. How much is the heater? Did you manage to get the promo price? One heater can be used for the two bathroom right? Share this post Link to post Share on other sites
ah_dun 0 Report post Posted May 22, 2010 Thks for compliment and like. =) hey, i like the effect of your green mosaic tiles extending to the floor, very nice. most ppl just stop at the end of the wall tiles. and ya, citygas they charge installation fee for every single thing they do. i paid $260 altogether for 3 installations, pipe to hob, dryer & heater. whiteoryx: i installed the citygas heater, they say it can supply hot water to 2 bathrooms at the same time. nice green and white combination you have!! Share this post Link to post Share on other sites
whiteoryx 0 Report post Posted May 22, 2010 I think when I bought is promotion price la $128 but after connect all new gas piping is near $500 la. But then again, it also depends on the distance the pipe has to travel correct? My kitchen is just next to the gas pipe area and the pipe doesn't need to go thru the living room to get to my toilet Share this post Link to post Share on other sites
ah_dun 0 Report post Posted May 22, 2010 Some photos to update my house reno. False ceiling and air-con up... =) Big Air-con **** room MBR 2nd bedroom 3rd bedroom Share this post Link to post Share on other sites
ah_dun 0 Report post Posted May 22, 2010 I think so. B'cos my layout is exact same as reuben so I just 1 2 let him know about this. For water piping I also learn a lot from one of my friend. On/Off valve for all piping through ur water tap for easy maintain and service. Check valve for washing machine tap to prevent water backflow to our drinking water/eat water tap. But then again, it also depends on the distance the pipe has to travel correct? My kitchen is just next to the gas pipe area and the pipe doesn't need to go thru the living room to get to my toilet Share this post Link to post Share on other sites
ah_dun 0 Report post Posted May 22, 2010 Next week most of the thing will be done. Chemical wash, laminate flooring, lighting, door, tempered glass etc... Lighting photos MBR lighting chosen by my wife =) Another small one at the corner in front of our wardrobe This for our kitchen 2nd & 3rd bedroom Our downlight Share this post Link to post Share on other sites